Filter interviews by
The material used for NC is Nitrocellulose.
Nitrocellulose is a highly flammable compound commonly used in the production of lacquers, explosives, and solid rocket propellants.
It is also used in the manufacturing of nail polish, leather finishes, and wood coatings.
NC is a key ingredient in the production of celluloid, a type of plastic used in early film production.
BIW stands for Body in White, which refers to the stage in automotive manufacturing where a car body's sheet metal components have been welded together but before the final assembly of components like doors, hood, and trunk.
BIW is the stage in automotive manufacturing where the car body's sheet metal components are welded together.
It is the stage before the final assembly of components like doors, hood, and trunk.
BIW i...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
posted on 10 Aug 2022
I applied via Walk-in
posted on 23 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I have a valid driver's license for both cars and motorcycles.
I have a Class C license for cars
I also have a Class M license for motorcycles
I have a clean driving record with no accidents or violations
I ride a road bike for commuting and a mountain bike for leisure.
I prefer road bikes for their speed and efficiency on paved roads.
I enjoy mountain biking for the challenge and adventure of off-road trails.
I also have experience with hybrid bikes for their versatility.
I prioritize safety and always wear a helmet and follow traffic laws.
I have participated in charity rides and group rides for fun and community.
Vehicle testing involves various methods to ensure safety, performance, and compliance with regulations.
Testing can include physical tests such as crash tests, durability tests, and performance tests.
Simulation and modeling can also be used to test vehicle components and systems.
Testing must comply with regulations set by organizations such as the National Highway Traffic Safety Administration (NHTSA) and the European
We conduct various types of homologation testing depending on the product and its intended market.
We conduct safety testing to ensure compliance with local regulations.
We perform emissions testing to ensure compliance with environmental regulations.
We conduct performance testing to ensure the product meets the required standards.
We also conduct durability testing to ensure the product can withstand the expected wear an...
posted on 20 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A random cylinder is a geometric shape defined by a random height and radius, often used in probability and statistics.
A random cylinder can be defined by its height (h) and radius (r), which can vary randomly.
In probability, random cylinders can model real-world phenomena, like the distribution of particles in a volume.
Example: If the height of a cylinder is uniformly distributed between 1 and 10 units, and the radius...
OEE stands for Overall Equipment Effectiveness, a metric used to measure manufacturing productivity.
OEE is calculated using three components: Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) x 100%. Example: If a machine runs for 8 hours but is down for 1 hour, availability is 87.5%.
Performance = (Actual Output / Maximum Possible Output) x 100%. Example: If a machine prod...
I appeared for an interview in Jun 2022.
I am an experienced Senior Engineer with a strong background in software development and project management.
Over 10 years of experience in software development
Proficient in multiple programming languages such as Java, C++, and Python
Extensive knowledge of software development methodologies and best practices
Proven track record of successfully leading and delivering complex projects
Strong problem-solving and analytical ...
8D report is a problem-solving methodology used to identify, correct and prevent recurring problems.
8D stands for 8 Disciplines
It involves a team-based approach to problem-solving
The report includes a detailed description of the problem, root cause analysis, corrective actions, and preventive measures
Example: A manufacturing company received customer complaints about a defect in their product. The team used the 8D repo...
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
posted on 28 Feb 2022
posted on 25 Dec 2023
I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 18 reviews
Rating in categories
Senior Design Engineer
249
salaries
| ₹4.1 L/yr - ₹13.5 L/yr |
Specialist
246
salaries
| ₹6 L/yr - ₹16.8 L/yr |
CAE Analyst
183
salaries
| ₹2.6 L/yr - ₹12 L/yr |
Senior Specialist
182
salaries
| ₹7.7 L/yr - ₹19.3 L/yr |
Senior Analyst
153
salaries
| ₹4.7 L/yr - ₹11 L/yr |
JBM Group
Subros
Ceat Tyres
UNO Minda