i
Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
Girders are used instead of slabs for higher spanned bridges due to their superior load-bearing capacity and flexibility.
Girders have a higher load-bearing capacity compared to slabs, making them suitable for longer spans.
Girders provide flexibility in design, allowing for various bridge configurations and accommodating different types of loads.
Girders can be precast or cast-in-place, offering construction efficiency a...
IRC 6 loads are the standard loads specified for the design of bridges in India.
IRC 6 loads are specified by the Indian Road Congress (IRC) for different types of vehicles and their loads.
These loads include the weight of the vehicles, impact factors, and dynamic loads.
IRC 6 loads are used to determine the maximum load that a bridge may experience during its design life.
Examples of IRC 6 loads include the standard axle...
Top trending discussions
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
posted on 12 Oct 2021
posted on 17 Jan 2021
I applied via Referral
posted on 8 Mar 2024
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
posted on 20 Apr 2024
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 1 Sep 2023
I appeared for an interview before Sep 2022.
based on 1 interview
Interview experience
Senior Software Engineer
8
salaries
| ₹5.7 L/yr - ₹9.5 L/yr |
Software Engineer
6
salaries
| ₹3.5 L/yr - ₹5.5 L/yr |
Team Lead
6
salaries
| ₹7 L/yr - ₹10.2 L/yr |
Assistant Highway Engineer
5
salaries
| ₹3.2 L/yr - ₹5 L/yr |
Survey Engineer
5
salaries
| ₹3.8 L/yr - ₹5.2 L/yr |
Lea Associates South Asia
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group