Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Satra Infrastructure Management Services Team. If you also belong to the team, you can get access from here
3.7

based on 52 Reviews

Filter interviews by

Satra Infrastructure Management Services Deputy Structure Manager Interview Questions and Answers

Updated 3 Jan 2024

Satra Infrastructure Management Services Deputy Structure Manager Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Why use girders instead of a slab for higher spanned bridges?
  • Ans. 

    Girders are used instead of slabs for higher spanned bridges due to their superior load-bearing capacity and flexibility.

    • Girders have a higher load-bearing capacity compared to slabs, making them suitable for longer spans.

    • Girders provide flexibility in design, allowing for various bridge configurations and accommodating different types of loads.

    • Girders can be precast or cast-in-place, offering construction efficiency a...

  • Answered by AI
  • Q2. IRC 6 loads that are applied in bridges
  • Ans. 

    IRC 6 loads are the standard loads specified for the design of bridges in India.

    • IRC 6 loads are specified by the Indian Road Congress (IRC) for different types of vehicles and their loads.

    • These loads include the weight of the vehicles, impact factors, and dynamic loads.

    • IRC 6 loads are used to determine the maximum load that a bridge may experience during its design life.

    • Examples of IRC 6 loads include the standard axle...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Make the answers to the question simple.
Learn the IRC codes 6 and 112.
Some basic BM and SF ideas

Interview questions from similar companies

I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. How many do you want salary..?
  • Q2. How many projects have you been done??
  • Q3. What is your Post and salary?
  • Q4. What is famous place in Bihar?
  • Ans. 

    Bodh Gaya is a famous place in Bihar.

    • Bodh Gaya is a pilgrimage site for Buddhists as it is the place where Gautama Buddha attained enlightenment.

    • The Mahabodhi Temple in Bodh Gaya is a UNESCO World Heritage Site.

    • Bodh Gaya is also known for its ancient university, Nalanda, which was a center of learning in ancient India.

    • Other notable places in Bihar include the ancient city of Patna, the ruins of Vikramshila University,

  • Answered by AI
  • Q5. How is your family and parents?

Interview Preparation Tips

Topics to prepare for Dee Vee Projects Structural Engineer interview:
  • Bridges
  • MNb
  • Mjb
Interview preparation tips for other job seekers - I am formal BE Civil Engineering from Anna University chennai.now I do the job in RR Enterprise Bihar which projects going on RCC over head water tank..

Interview Questionnaire 

4 Questions

  • Q1. What is M20 concrete?
  • Ans. 

    M20 concrete is a type of concrete with a compressive strength of 20 megapascals (MPa).

    • M20 concrete is commonly used in construction for various applications.

    • It is a mix of cement, sand, and aggregate in specific proportions.

    • The ratio of cement to sand to aggregate in M20 concrete is 1:1.5:3.

    • It is suitable for non-structural components like foundations, pathways, etc.

    • M20 concrete has a curing period of 28 days to achie

  • Answered by AI
  • Q2. What is HI?
  • Q3. Steel cutting length formula for 90° bend?
  • Ans. 

    The steel cutting length formula for a 90° bend is calculated using the bend allowance and the bend radius.

    • The bend allowance is the length of material that is consumed during the bending process.

    • The bend radius is the radius of the inside curve of the bend.

    • The formula for calculating the steel cutting length for a 90° bend is: Cutting Length = Bend Allowance + (π/2) x Bend Radius

    • The value of π is approximately 3.14159

  • Answered by AI
  • Q4. Total length of steel -2(2d)
  • Ans. 

    The total length of steel is equal to 2 times the difference between the length of the steel and twice its diameter.

    • The formula for total length of steel is: L = 2(L-2d)

    • L represents the total length of steel

    • d represents the diameter of the steel

    • Example: If the length of the steel is 10 meters and the diameter is 2 meters, the total length of steel would be 12 meters

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - pratice,pratice and pratice

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. They will ask technical questions on projects done in previous company. And in that basis there will be salary negotiation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about what you have done previously.

Satra Infrastructure Management Services Interview FAQs

How many rounds are there in Satra Infrastructure Management Services Deputy Structure Manager interview?
Satra Infrastructure Management Services interview process usually has 2 rounds. The most common rounds in the Satra Infrastructure Management Services interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Satra Infrastructure Management Services Deputy Structure Manager interview?

Some of the top questions asked at the Satra Infrastructure Management Services Deputy Structure Manager interview -

  1. Why use girders instead of a slab for higher spanned bridg...read more
  2. IRC 6 loads that are applied in brid...read more

Tell us how to improve this page.

Satra Infrastructure Management Services Deputy Structure Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 416 Interviews
Adani Group Interview Questions
3.9
 • 178 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
View all
Senior Software Engineer
8 salaries
unlock blur

₹5.7 L/yr - ₹9.5 L/yr

Software Engineer
6 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Team Lead
6 salaries
unlock blur

₹7 L/yr - ₹10.2 L/yr

Assistant Highway Engineer
5 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Survey Engineer
5 salaries
unlock blur

₹3.8 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Satra Infrastructure Management Services with

GMR Group

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

Tata Projects

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview