i
Saint-Gobain
Filter interviews by
A work permit system is a formal written system used to control high-risk work activities to ensure safety of workers and the workplace.
Work permit systems outline the procedures and requirements for carrying out specific high-risk tasks.
They are used to assess risks, implement controls, and communicate safety measures to workers.
Examples include hot work permits for welding, confined space entry permits, and electrica...
Confined space is an area that is not designed for continuous occupancy, has limited entry and exit points, and may have hazardous conditions.
Confined spaces are typically small and enclosed, making it difficult to enter and exit.
These spaces may have poor ventilation, limited lighting, or contain hazardous substances.
Examples of confined spaces include storage tanks, silos, tunnels, and sewers.
Oxygen level in confined spaces should be monitored to ensure safety of workers.
Oxygen levels in confined spaces should be maintained between 19.5% and 23.5%.
Low oxygen levels can lead to dizziness, confusion, and even loss of consciousness.
High oxygen levels can increase the risk of fire and explosion.
Monitoring equipment such as oxygen meters should be used to regularly check oxygen levels in confined spaces.
Top trending discussions
posted on 24 Aug 2023
posted on 18 Mar 2025
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
3 candidate was their vs 1 opening
I appeared for an interview in Sep 2024, where I was asked the following questions.
SparkSession is the entry point for programming Spark with the Dataset and DataFrame API.
It replaces the older SQLContext and HiveContext in Spark 2.0 and later.
Allows users to create DataFrames and execute SQL queries.
Example: `val spark = SparkSession.builder.appName("MyApp").getOrCreate()`.
Supports reading data from various sources like JSON, Parquet, and JDBC.
Example: `val df = spark.read.json("path/to/file.json")`
Apache Spark is a unified analytics engine for big data processing, with built-in modules for streaming, SQL, machine learning, and graph processing.
Spark operates on a cluster computing model, allowing distributed data processing.
It uses Resilient Distributed Datasets (RDDs) for fault tolerance and parallel processing.
Spark provides high-level APIs in Java, Scala, Python, and R, making it accessible to various develop...
I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.
posted on 25 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.
A pile is a long, cylindrical structure made of materials such as concrete, steel, or wood, used to support heavy loads.
Piles are commonly used in construction to support buildings, bridges, and other structures.
They are driven or drilled into the ground to provide stability and prevent settling or shifting.
Different types of piles include timber, concrete, steel, and composite piles.
Pile foundations are often used in ...
Vertical load test of pile is a test to determine the load carrying capacity of a pile.
A vertical load is applied to the pile using a hydraulic jack or a reaction frame.
The load is increased until the pile reaches its ultimate capacity or a predetermined limit.
The test helps in determining the pile's load settlement behavior and its ultimate bearing capacity.
The test is commonly used in the construction industry to ens...
Lateral load test of pile is a test to determine the lateral capacity of a pile.
It involves applying a horizontal load to the pile and measuring the deflection.
The test is conducted by using a hydraulic jack or a reaction frame.
The lateral load test helps in determining the lateral load capacity of the pile.
The test results are used to design the foundation of the structure.
The lateral load test is important for struct...
Yes
Yes, there is an IS code for vertical load test of piles.
The relevant IS code is IS 2911 (Part 4): 2013 - 'Design and construction of pile foundations - Load test on piles'.
This code provides guidelines for conducting vertical load tests on piles to determine their load-carrying capacity and performance.
The code covers various aspects such as test setup, instrumentation, loading procedures, acceptance criteria, and ...
Vertical load test of pile is done to determine the load carrying capacity of the pile.
To ensure the pile can support the intended load
To determine the settlement of the pile under load
To verify the design assumptions
To assess the quality of the pile installation
Examples: bridge piers, high-rise buildings, transmission towers
Vertical load test is a procedure to determine the load-bearing capacity of a structure.
The test involves applying a vertical load to the structure and measuring the resulting deflection.
The load is gradually increased until the structure reaches its maximum load-bearing capacity.
The test can be performed using hydraulic jacks, weights, or other equipment.
The results of the test are used to ensure the safety and stabil...
Lateral load test is a procedure to determine the strength and stability of a structure against horizontal forces.
The test involves applying a horizontal force to the structure and measuring its response.
The force is usually applied using hydraulic jacks or a reaction frame.
The test is performed on a representative section of the structure, such as a column or a wall.
The results of the test are used to verify the desig...
SPT test is a standard penetration test used to determine the soil's resistance to penetration.
SPT test involves driving a standard sampler into the soil using a hammer of standard weight and height.
The number of blows required to drive the sampler a certain distance is recorded as the SPT N-value.
SPT test is commonly used in geotechnical engineering to determine soil properties such as shear strength and bearing capac...
MPR, WPR, and DPR are acronyms used in various fields to represent different concepts.
MPR stands for Monthly Progress Report, which is a document that provides an overview of the progress made during a specific month.
WPR stands for Weekly Progress Report, which is a document that highlights the progress made on a weekly basis.
DPR stands for Daily Progress Report, which is a document that summarizes the daily progress m...
BBS calculation is a method used to determine the reinforcement required for a pile.
BBS stands for Bar Bending Schedule.
It involves calculating the length and number of steel bars required for the pile.
Factors such as load capacity, soil type, and pile diameter are taken into consideration.
The BBS is used to ensure the pile can withstand the required load and prevent failure.
The number of tests required for a pile depends on various factors such as the type of pile, soil conditions, and project requirements.
The number of tests can range from one to several depending on the project.
Common tests for piles include static load tests, dynamic load tests, and integrity tests.
Factors such as pile length, diameter, and soil type can affect the number of tests required.
The project specifications an...
The cut off level of pile depends on various factors such as soil type, load capacity, and design requirements.
The cut off level of pile is the depth at which the pile is embedded into the ground.
It is determined by the soil type and load capacity of the ground.
The design requirements of the structure being built also play a role in determining the cut off level of pile.
For example, if the structure requires a deeper f...
The minimum distance of detume bar of pile vertical load test is typically 2.5 times the diameter of the pile.
The detume bar is used to measure the settlement of the pile during the load test.
The minimum distance is important to ensure accurate measurement of the pile settlement.
The distance is typically 2.5 times the diameter of the pile, but may vary depending on the specific test requirements.
If the distance is too ...
Dynamic load test of pile is done to assess its load carrying capacity and integrity.
To ensure the pile can withstand the expected load and prevent failure
To determine the pile's ultimate bearing capacity
To assess the pile's integrity and detect any defects or damage
To verify the design assumptions and optimize the foundation design
Examples: bridge piers, tall buildings, wind turbines, etc.
Integrity test of pile is done to ensure the pile is structurally sound and can bear the required load.
To ensure the pile is not damaged during installation
To check if the pile is free from any defects or cracks
To verify if the pile can bear the required load
To ensure the safety of the structure and its occupants
Examples: Sonic Integrity Testing, Crosshole Sonic Logging, etc.
based on 1 interview
Interview experience
Team Member
526
salaries
| ₹1.4 L/yr - ₹8.3 L/yr |
Key Account Manager
180
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Senior Software Engineer
166
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Software Engineer
164
salaries
| ₹3 L/yr - ₹14 L/yr |
Production Engineer
157
salaries
| ₹1 L/yr - ₹9.7 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company