i
Saint-Gobain
Filter interviews by
A work permit system is a formal written system used to control high-risk work activities to ensure safety of workers and the workplace.
Work permit systems outline the procedures and requirements for carrying out specific high-risk tasks.
They are used to assess risks, implement controls, and communicate safety measures to workers.
Examples include hot work permits for welding, confined space entry permits, and electrica...
Confined space is an area that is not designed for continuous occupancy, has limited entry and exit points, and may have hazardous conditions.
Confined spaces are typically small and enclosed, making it difficult to enter and exit.
These spaces may have poor ventilation, limited lighting, or contain hazardous substances.
Examples of confined spaces include storage tanks, silos, tunnels, and sewers.
Oxygen level in confined spaces should be monitored to ensure safety of workers.
Oxygen levels in confined spaces should be maintained between 19.5% and 23.5%.
Low oxygen levels can lead to dizziness, confusion, and even loss of consciousness.
High oxygen levels can increase the risk of fire and explosion.
Monitoring equipment such as oxygen meters should be used to regularly check oxygen levels in confined spaces.
Top trending discussions
posted on 18 Mar 2025
posted on 24 Aug 2023
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
3 candidate was their vs 1 opening
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
It was around 10 minutes long and questioning was about Civil structures related as Bending moment etc.
posted on 29 Aug 2024
I applied via Naukri.com and was interviewed before Aug 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.
Project life cycle can be managed by following a structured approach that includes planning, execution, monitoring, and closure.
Define project scope, objectives, and deliverables
Create a project plan with timelines, milestones, and resources
Execute the plan and monitor progress regularly
Identify and manage risks, issues, and changes
Close the project by delivering the final product and conducting a post-project review
Managing client relationships involves effective communication, understanding their needs, and delivering quality service.
Establish clear communication channels and respond promptly to their queries
Understand their needs and expectations and tailor your services accordingly
Deliver quality service and exceed their expectations
Maintain transparency and honesty in all dealings
Regularly seek feedback and take corrective ac...
I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
Team Member
526
salaries
| ₹1.4 L/yr - ₹8.3 L/yr |
Key Account Manager
176
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Software Engineer
172
salaries
| ₹3 L/yr - ₹11.4 L/yr |
Senior Software Engineer
168
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Production Engineer
155
salaries
| ₹1 L/yr - ₹11 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company