Upload Button Icon Add office photos

Filter interviews by

Saffron Industries Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Job relevant and depend on interviewer
  • Q2. What is your current job profile
Round 2 - One-on-one 

(1 Question)

  • Q1. Job relevant very good
Round 3 - One-on-one 

(1 Question)

  • Q1. Job related interview depend on interviewer

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Job work culture and pay benefits
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What is power operation and maintenance
Round 2 - Technical 

(1 Question)

  • Q1. What is Power plant operation and maintenance.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How much share in bundle and reel in production?
  • Q2. How can we analyse the production of all our products and calculate their values separately?
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - HR 

(2 Questions)

  • Q1. What is your qualifications?
  • Q2. What is your work experience?
Round 2 - One-on-one 

(2 Questions)

  • Q1. Why you want to do this job?
  • Q2. Why you want to work with Khanna paper Mill?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while giving interview.
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Asking about your projects..
  • Q2. Past project explain
Round 2 - HR 

(1 Question)

  • Q1. Asking for 3 year bond with 10% salary deduction.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join this kind of company, who is asking 3-year bond and salary deduction.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Whatsapp and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the minimum megger value of good motor.
  • Ans. 

    The minimum megger value of a good motor is typically 1 megohm or higher.

    • A good motor should have a megger value of at least 1 megohm to ensure proper insulation resistance.

    • Lower megger values may indicate insulation issues or potential breakdowns in the motor.

    • Regular megger testing is important to detect any insulation problems in motors.

    • For high voltage motors, the minimum megger value may be higher than 1 megohm.

  • Answered by AI
  • Q2. How much kva transformer is installed in my plant.
  • Ans. 

    The kVA transformer installed in the plant is 500 kVA.

    • The kVA transformer installed in the plant is 500 kVA.

    • The kVA rating of the transformer is crucial for determining the power capacity of the plant.

    • It is important to regularly check and maintain the transformer to ensure optimal performance.

    • The kVA rating indicates the maximum load that the transformer can handle without overheating.

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Basic salary discussion.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous experience
  • Q2. Some techinacal
Round 2 - Technical 

(2 Questions)

  • Q1. Techincal and questions
  • Q2. Techincal and some conflict questions

Interview Preparation Tips

Interview preparation tips for other job seekers - do ur research
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - HR 

(4 Questions)

  • Q1. Introduction yourself
  • Q2. What your previous experience?
  • Q3. Current CTC Expected CTC Notice period
  • Ans. 

    Current CTC, Expected CTC, Notice period

    • Current CTC: INR 6,00,000 per annum

    • Expected CTC: INR 7,00,000 per annum

    • Notice period: 1 month

  • Answered by AI
  • Q4. Check your confidence
Round 2 - Technical 

(4 Questions)

  • Q1. What is paper making process?
  • Ans. 

    Paper making process involves converting wood pulp or other materials into paper sheets through various stages like pulping, bleaching, and drying.

    • Wood or other raw materials are pulped to break down fibers

    • The pulp is cleaned and refined to remove impurities

    • Bleaching agents are used to whiten the pulp

    • The pulp is then formed into sheets and dried to create paper

    • Additional processes like coating or calendaring may be don

  • Answered by AI
  • Q2. What is your work in previous company?
  • Q3. Why do you change the company?
  • Q4. What is your skills?

Interview Preparation Tips

Topics to prepare for Orient Paper Mill Process Officer interview:
  • Pulp making process
  • Paper machine
Interview preparation tips for other job seekers - All interviewer is not checked your proper answer it's only check your confidence level.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. Power plant boiler & turbine
  • Q2. Alignment with three Dial gauge.
  • Ans. 

    Aligning with three dial gauges involves using precision instruments to ensure accurate alignment of machinery.

    • Use three dial gauges to measure the alignment of different points on the machinery

    • Adjust the machinery until all three dial gauges show the same readings

    • Repeat the process multiple times to ensure accuracy

    • Ensure that the machinery is properly secured before making any adjustments

  • Answered by AI
  • Q3. Monitoring of equipment in Blr&TG.
  • Ans. 

    Monitoring of equipment in Blr&TG involves regular inspections, maintenance, and troubleshooting to ensure optimal performance.

    • Regularly inspecting equipment for signs of wear and tear

    • Performing routine maintenance tasks such as lubrication and calibration

    • Troubleshooting equipment issues to identify and resolve problems

    • Keeping detailed records of equipment maintenance and repairs

    • Collaborating with other team members to

  • Answered by AI
  • Q4. LLF ROUND of equipment.
  • Q5. Condition study of equipment with N.D.T .

Interview Preparation Tips

Interview preparation tips for other job seekers - All rotary equipment in power plant
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. General questions
  • Q2. Introduce yourself
  • Q3. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be careful if called for interview at the location as committed they even don't pay up for to & fro travel so please avoid.
Rest explicitly don't mention salary and don't provide response later on.

Tell us how to improve this page.

Interview Questions from Similar Companies

JK Paper Interview Questions
4.0
 • 48 Interviews
Andhra Paper Interview Questions
3.7
 • 16 Interviews
Jodhani Papers Interview Questions
3.3
 • 9 Interviews
View all
Admin in Charge
3 salaries
unlock blur

₹4.8 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Saffron Industries with

JK Paper

4.0
Compare

Parason Machinery

3.6
Compare

Century Pulp & Paper

3.9
Compare

Andhra Paper

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview