I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
posted on 27 Oct 2023
I appeared for an interview in Feb 2023.
Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.
Identify needs and requirements
Research and select potential suppliers
Negotiate terms and conditions
Create and sign contracts
Manage supplier relationships and performance
Monitor and evaluate procurement process effectiveness
Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.
Communicate openly and honestly with colleagues and superiors
Respect confidentiality and avoid gossip or spreading rumors
Follow through on commitments and hold yourself accountable
Act with fairness and impartiality in decision-making
Admit mistakes and take responsibility for correcting them
Lead by example and
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.
Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.
This process is time-dependent and can take years to complete.
Consolidation can cause settlement and deformation of structures built on top of the...
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.
COS includes costs such as raw materials, labor, and manufacturing overhead.
Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.
Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...
EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.
EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.
It is represented by the ASCII control character with the code 04.
EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...
A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.
A claim is typically submitted by a policyholder or healthcare provider to an insurance company.
It includes details such as the services provided, dates of service, and the amount billed.
The insurance company reviews the claim to determine if it meets the policy's coverage criteria.
Once approved, the ...
RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.
RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.
It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.
RFIs are often used as a preliminary step before issui...
Estimates are calculated predictions of the cost, time, and resources required for a project.
Gather all relevant information and data related to the project
Break down the project into smaller tasks or components
Use historical data or industry benchmarks to estimate the time and cost for each task
Consider any potential risks or uncertainties that may impact the estimates
Document the estimates and communicate them clearl
posted on 1 Dec 2023
I applied via Job Portal and was interviewed before Dec 2022. There were 2 interview rounds.
Changes in project scope can have significant technical and economic impacts.
Changes in project scope can lead to increased costs and delays.
Technical changes may require additional resources or expertise.
Economic impacts can include changes in project budget or financial viability.
Examples include scope changes in construction projects, design changes in engineering projects, or regulatory changes in energy projects.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
I would manage the design of a power plant by coordinating with engineers, ensuring compliance with regulations, and monitoring progress.
Coordinate with engineering team to develop detailed design plans
Ensure compliance with safety regulations and environmental standards
Monitor progress and address any design issues or changes
Collaborate with stakeholders to incorporate feedback and make necessary adjustments
posted on 21 Sep 2021
I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.
Assistant Bridge Engineer
39
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Highway Engineer
38
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Quality Material Engineer
23
salaries
| ₹3.5 L/yr - ₹5.7 L/yr |
Office Manager
22
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Quantity Surveyor
17
salaries
| ₹1.8 L/yr - ₹10.8 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem