Filter interviews by
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
Execution as per IS code refers to following the guidelines and standards set by the Indian Standards Institute.
IS codes are a set of standards and guidelines set by the Indian Standards Institute for various industries and sectors.
Following the IS codes ensures that the work is done in a safe and efficient manner.
For example, in the construction industry, following the IS codes for building materials and construction ...
Top trending discussions
Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.
Calculate the dimensions of the project area
Determine the materials needed for the project
Estimate the quantities of materials required based on the dimensions and specifications
Consider factors such as wastage and additional materials for contingencies
Use software tools like AutoCAD or Excel for accurate calculati
Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.
Identify all costs associated with the project or operation, including direct and indirect costs.
Break down costs into categories such as labor, materials, equipment, overhead, and contingency.
Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.
Use...
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
Vlookup is a function in Excel used to search for a value in a table and return a corresponding value from another column.
Vlookup stands for 'vertical lookup'
It is used to search for a value in the first column of a table and return a value in the same row from a specified column
Syntax: =VLOOKUP(lookup_value, table_array, col_index_num, [range_lookup])
Example: =VLOOKUP(A2, B2:D10, 3, FALSE) - searches for the value in ...
I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.
Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.
Measure the length and width of the area to be covered with stone/tile flooring/cladding
Multiply the length by the width to get the total square meters or square feet
Account for any cuts or wastage in the calculation
Consider the pattern or design of the flooring/cladding when measuring
I was interviewed before Dec 2023.
Concerning the billing process.
I applied via Referral and was interviewed in May 2021. There were 2 interview rounds.
posted on 2 Oct 2022
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
GST stands for Goods and Services Tax.
GST is a comprehensive indirect tax levied on the supply of goods and services in India.
It was implemented on 1st July 2017 to replace multiple indirect taxes like VAT, excise duty, service tax, etc.
The main objective of GST is to create a unified and simplified tax structure across the country.
It has different tax slabs for different goods and services, such as 5%, 12%, 18%, and 2...
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
based on 1 review
Rating in categories
Site Engineer
18
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Civil Site Engineer
17
salaries
| ₹1.1 L/yr - ₹4.2 L/yr |
Assistant Engineer
17
salaries
| ₹1.5 L/yr - ₹3.7 L/yr |
Safety Supervisor
10
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Asst Store
10
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
IRB Infrastructure