Filter interviews by
I was interviewed before Sep 2016.
Top trending discussions
posted on 6 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There were 2 interview rounds.
The test about the aptitude questions asked normally
Design of system and electrical grid network
At my last company, I faced challenges with outdated equipment and limited resources.
Outdated equipment made it difficult to efficiently complete tasks
Limited resources hindered the ability to innovate and improve processes
Lack of support from management in upgrading technology and tools
Difficulty in meeting project deadlines due to these challenges
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
A substation is a facility that transforms high voltage electricity to lower voltage for distribution to consumers.
Substations play a crucial role in the power grid by facilitating the transmission and distribution of electricity.
They receive electricity from power plants or transmission lines and transform it to a lower voltage suitable for distribution.
Substations contain various equipment such as transformers, circu...
posted on 10 Sep 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 3 interview rounds.
Normal questions of logical and reasoning
I applied via AmbitionBox and was interviewed in Sep 2022. There were 4 interview rounds.
posted on 2 Aug 2022
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
Battery:- A battery is a device that stores chemical energy and converts it to electrical energy .
posted on 19 Jan 2022
Coordination with clients requires effective communication, understanding of their needs, and timely delivery of work.
Establish clear communication channels
Understand client's requirements and expectations
Provide regular updates on project progress
Address any concerns or issues promptly
Deliver work on time and within budget
Maintain a professional and respectful attitude
Build a positive and long-lasting relationship
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Star and delta connections are two types of three-phase circuits used in electrical engineering.
Star connection has a common neutral point and three phases connected to it.
Delta connection has three phases connected in a triangular shape.
Star connection is used for low voltage applications while delta connection is used for high voltage applications.
Star connection provides better safety as the neutral point can be gro...
Grounding is the process of connecting an electrical circuit to the ground, while earthing is the process of connecting a conductive object to the earth.
Grounding is done to protect people and equipment from electrical faults and lightning strikes.
Earthing is done to prevent electric shocks and to ensure the safety of people and equipment.
Grounding is usually done by connecting a wire from the electrical circuit to a g...
Starters are devices used to start and control the speed of electric motors.
Direct On-Line (DOL) Starter
Star-Delta Starter
Auto Transformer Starter
Soft Starter
Variable Frequency Drive (VFD)
VFD stands for Variable Frequency Drive. It is an electronic device that controls the speed of an AC motor.
VFD is used to save energy by controlling the speed of the motor according to the load.
It can also improve the lifespan of the motor by reducing wear and tear.
VFD can be used in various applications such as pumps, fans, conveyors, and compressors.
It works by converting the incoming AC power to DC and then back to ...
based on 1 review
Rating in categories
Service Engineer
8
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Sales Engineer
7
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Junior Engineer
7
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Design Engineer
5
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Junior Mechanical Engineer
4
salaries
| ₹1.5 L/yr - ₹3 L/yr |
JBS Enterprises
Essae Digitronics
La-Gajjar Machineries
East India Technologies