i
Roop Polymers
Filter interviews by
I applied via Job Fair and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Oct 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Dec 2022. There were 3 interview rounds.
There are three main types of defects in engineering: design defects, manufacturing defects, and usage defects.
Design defects occur when there is an issue with the initial design of a product, leading to problems in its functionality or safety. For example, a car with a faulty braking system due to a design flaw.
Manufacturing defects happen during the production process, resulting in a product that does not meet the in...
The 7 wastes refer to inefficiencies in a process that can be eliminated to improve productivity and quality.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to waste of resources
Motion: Unnecessary movement of people
Waiting: Idle time in a process
Overproduction: Producing more than needed
Overprocessing: Doing more work than necessary
Defects: Errors that require rework or
Line balance refers to distributing workload evenly among different stations in a production line to optimize efficiency.
Line balance ensures that each station in the production line has a similar amount of work to do.
It helps in preventing bottlenecks and maximizing throughput.
Line balance can be achieved by adjusting the cycle times at each station or by adding/subtracting workstations.
An example of line balance is i...
To reduce defects and increase productivity, focus on continuous improvement, training, quality control, and efficient processes.
Implement a quality control system to catch defects early on
Provide regular training to employees to improve skills and knowledge
Analyze data to identify root causes of defects and implement corrective actions
Streamline processes to eliminate waste and improve efficiency
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Factors affecting OEE include equipment downtime, speed loss, and defects in production.
Improving OEE involves reducing downtime, increasing production speed, and minimizing defects.
For example, implementing preventive maintenance can reduce eq
posted on 15 Apr 2024
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Line balance refers to the equal distribution of work among different stations in a production line.
Line balance ensures that each station in a production line has a similar workload.
It helps in optimizing the efficiency and productivity of the production process.
Line balancing techniques involve analyzing the tasks, cycle times, and capacities of each station to achieve optimal balance.
An example of line balance is wh...
Lead time is the time it takes to complete a process from start to finish.
Lead time includes all the steps involved in a process, from planning to delivery.
It is an important metric for businesses to measure and improve efficiency.
Lead time can vary depending on the complexity of the process and the resources available.
For example, the lead time for manufacturing a car can be several months, while the lead time for del
Torque is decided based on the required force and the distance from the axis of rotation.
Determine the required force for the task
Calculate the distance from the axis of rotation
Use the formula T = F x d to calculate torque
Consider any external factors that may affect torque requirements
Choose a motor or engine with sufficient torque output
Working with unions requires clear communication, respect, and a willingness to negotiate.
Establish open lines of communication with union representatives
Respect the collective bargaining agreement and union rules
Negotiate in good faith to find mutually beneficial solutions
Be prepared to compromise and find creative solutions
Stay informed about labor laws and regulations
Address any grievances or disputes promptly and f
Improving shopfloor requires optimizing processes, training employees, and utilizing technology.
Analyze current processes and identify areas for improvement
Invest in employee training and development
Implement technology such as automation and data analytics
Regularly review and adjust processes to ensure efficiency
Encourage employee feedback and suggestions
Maintain a clean and organized workspace
5S is a workplace organization method that uses a set of principles to create and maintain an organized, clean, and efficient work environment.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean the work area and equipment
Standardize - establish procedures for maintaining the first three S's
Sustain - ensure that the first four S's are followed con...
I applied via Company Website and was interviewed in Mar 2022. There was 1 interview round.
File refers to a document or data stored on a computer, while quality refers to the standard of excellence or fitness for purpose.
File is a digital record or document, while quality is a measure of how well something meets a standard or requirement.
File can be saved, edited, and shared, while quality is a characteristic that cannot be changed once established.
Examples of files include documents, images, videos, and aud...
Mass production allows for lower costs due to economies of scale.
Lower production costs per unit
Increased efficiency in production processes
Ability to meet high demand quickly
Consistent quality control measures
Examples: assembly line production in automotive industry, electronics manufacturing
Fundamental deviation of hole in BIS system can be indicated by specifying the tolerance zone and the position of the hole.
Specify the tolerance zone for the hole based on the BIS system standards.
Measure the actual position of the hole and compare it to the specified tolerance zone.
If the actual position of the hole falls outside the tolerance zone, indicate it as a fundamental deviation.
A rack and pinion mechanism is used to convert linear motion of plunger to rotary motion of pointer in D.T.I.
Rack and pinion mechanism consists of a gear (pinion) that meshes with a linear gear (rack) to convert linear motion into rotary motion.
As the plunger moves linearly, it engages with the rack which in turn rotates the pinion, causing the pointer to move.
This mechanism is commonly used in devices like dial indica...
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
Basic questions related to math nd syllabus
I appeared for an interview before Feb 2024.
Quality Engineer
71
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Engineer
69
salaries
| ₹2.3 L/yr - ₹5.5 L/yr |
Senior Engineer
64
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Assistant Manager
55
salaries
| ₹5.2 L/yr - ₹10.4 L/yr |
Assistant Engineer
55
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda