Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Roop Polymers Team. If you also belong to the team, you can get access from here

Roop Polymers Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Roop Polymers Production Engineer Interview Questions and Answers

Updated 6 Nov 2024

Roop Polymers Production Engineer Interview Experiences

2 interviews found

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Referral and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience releted
  • Q2. Self Introduction

Interview Preparation Tips

Interview preparation tips for other job seekers - Preperation for interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Sep 2022.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self , work experience
Round 2 - Technical 

(1 Question)

  • Q1. Daily work routine and oee, ppm , rejection, manpower handling

Interview Preparation Tips

Interview preparation tips for other job seekers - PLANT HEAD QUESTIONS, WHY YOU HAVE CHANGE YOUR JOB

Production Engineer Interview Questions Asked at Other Companies

Q1. How to solve the problem in robot means how to detect fault?
asked in Foxconn
Q2. If product a fails in last stage what is root cause ?
Q3. Minimum value measure by vernier caliper?
Q4. difference between mass production and batch production?
Q5. Did you know about soldering and what is the criteria for solderi ... read more

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Poka yoke and tpm Manpower Handling Total Productive Maintenance
  • Q2. Production Approval process Daily production targets report
  • Q3. Poka yoke Bhul se bhi galti se galti na ho paye Total Productive Maintenance
Round 2 - HR 

(1 Question)

  • Q1. Overall equipment E

Interview Preparation Tips

Interview preparation tips for other job seekers - Production Engineer
Tpm
5s
Poka yoke
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. How change your previous company
  • Ans. 

    I implemented new production processes and technologies to improve efficiency and quality.

    • Introduced automated systems to streamline production processes

    • Implemented lean manufacturing principles to reduce waste and improve productivity

    • Led training sessions for employees to ensure smooth transition to new processes

    • Collaborated with cross-functional teams to identify areas for improvement

  • Answered by AI
  • Q2. Over experience and filed and achievements
Round 2 - Technical 

(2 Questions)

  • Q1. Question as par roll and documents related
  • Q2. Working and behaviour related

Interview Preparation Tips

Interview preparation tips for other job seekers - Not extra laod on resume and not writing any unnecessary things
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Tell me about your self
  • Ans. 

    I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.

    • Bachelor's degree in Mechanical Engineering

    • 5+ years of experience in production engineering

    • Proficient in CAD software and manufacturing processes

    • Implemented lean manufacturing principles to improve efficiency

    • Led cross-functional teams to troubleshoot production issues

  • Answered by AI
  • Q2. You're worked here
  • Q3. Job and responsibilities
Round 2 - Technical 

(5 Questions)

  • Q1. Cnc vmc program
  • Q2. SAP(BOM, production punch)
  • Q3. 7qc tool details
  • Q4. 5 core tools (spc, MSA, Ppap)
  • Q5. Production document (dwm, dd20, 5m change, tl activity

Interview Preparation Tips

Topics to prepare for Subros Production Engineer interview:
  • Self introduction
  • Technical
  • TPM Methodology
  • MS Office
  • SAP
  • CNC Programming
  • VMC Programming
  • Machine Setting
  • English Language
Interview preparation tips for other job seekers - Production engineer in machine shop (CNC, VMC and SPM)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is OEE and what is role
  • Q2. What is TCP
Round 2 - HR 

(2 Questions)

  • Q1. Why promote you
  • Q2. Family

Interview Preparation Tips

Interview preparation tips for other job seekers - Introduction,DWM,and documents
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is OEE and how it can be calculated.
  • Ans. 

    OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.

    • OEE is calculated by multiplying Availability, Performance, and Quality.

    • Availability is the ratio of operating time to planned production time.

    • Performance is the ratio of actual production to maximum possible production.

    • Quality is the ratio of good parts to total parts produced.

    • OEE = Availability x Performa...

  • Answered by AI
  • Q2. What is G code & M code.
  • Ans. 

    G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.

    • G code is used to control the movements of the machine, such as linear or circular interpolation.

    • M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.

    • G codes are typically used for positioning and feed rate control, while M codes are used for...

  • Answered by AI
  • Q3. You made program by yourself or by using any software.
  • Ans. 

    I have used software to create programs.

    • I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.

    • Using software allows for more precise and efficient programming compared to manual methods.

    • Software also helps in simulating and testing programs before implementation.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Steel Strips Wheels Production Engineer interview:
  • CNC ,VMC programing
  • System related knowledge
Interview preparation tips for other job seekers - Prepare well before interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tpm @ 7qc tolls
  • Q2. Audit
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Online test conducted for 1 hour atlest

Round 2 - Technical 

(2 Questions)

  • Q1. 6 sigma understanding
  • Q2. Qa process understa ding
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. HR, aptitude test, group discussion
  • Q2. One on one round
  • Q3. Group discussion
  • Q4. Aptitude test and HR
  • Q5. One on one round in technical

Roop Polymers Interview FAQs

How many rounds are there in Roop Polymers Production Engineer interview?
Roop Polymers interview process usually has 2 rounds. The most common rounds in the Roop Polymers interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Roop Polymers Production Engineer interview?

Some of the top questions asked at the Roop Polymers Production Engineer interview -

  1. Daily work routine and oee, ppm , rejection, manpower handl...read more
  2. Experience rele...read more

Tell us how to improve this page.

Roop Polymers Production Engineer Interview Process

based on 3 interviews

Interview experience

3.3
  
Average
View more
Roop Polymers Production Engineer Salary
based on 55 salaries
₹2 L/yr - ₹4.8 L/yr
At par with the average Production Engineer Salary in India
View more details

Roop Polymers Production Engineer Reviews and Ratings

based on 20 reviews

4.1/5

Rating in categories

3.8

Skill development

3.7

Work-life balance

3.8

Salary

4.1

Job security

4.0

Company culture

3.3

Promotions

3.8

Work satisfaction

Explore 20 Reviews and Ratings
Senior Engineer
73 salaries
unlock blur

₹3.6 L/yr - ₹7.2 L/yr

Engineer
71 salaries
unlock blur

₹2.3 L/yr - ₹5.5 L/yr

Quality Engineer
71 salaries
unlock blur

₹2.2 L/yr - ₹4.9 L/yr

Assistant Manager
55 salaries
unlock blur

₹5.2 L/yr - ₹10.4 L/yr

Production Engineer
55 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Roop Polymers with

Supreme Industries

4.1
Compare

Finolex Industries

3.7
Compare

Sintex Plastics Technology

1.9
Compare

Nilkamal

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview