RKS Construction Consultant Interview Questions and Answers

Updated 10 Jul 2024

RKS Construction Consultant Interview Experiences

1 interview found

Consultant Interview Questions & Answers

user image Anonymous

posted on 10 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Understand the Basics: Ensure you grasp basic mathematical concepts, logical reasoning, and data interpretation skills.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Introduction ,current job profile ,Current CTC ,expected CTC
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical, personal questions
Round 3 - HR 

(1 Question)

  • Q1. Personal questions , about experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Not bad
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Comfortable for job location and salary structure required
Round 3 - Technical 

(1 Question)

  • Q1. What kind of job experience you have

Interview Preparation Tips

Interview preparation tips for other job seekers - No comments
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basicaly ur experience and some topics of mechanical engineering
Round 3 - vertical interview 

(1 Question)

  • Q1. Basicaly above the experience
Round 4 - HR 

(1 Question)

  • Q1. Negotiation for salary and family background

Interview Preparation Tips

Interview preparation tips for other job seekers - for experience persion not worried because questions comes only practical work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Site Engineering and Code Books
  • Q2. Quality related questions
Round 3 - Group Discussion 

Technical questions about Construction engineering..

Interview Preparation Tips

Interview preparation tips for other job seekers - Before go for your interview pls prepare all relavent code books...

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

Interview Questionnaire 

15 Questions

  • Q1. What is pile?
  • Ans. 

    A pile is a long, cylindrical structure made of materials such as concrete, steel, or wood, used to support heavy loads.

    • Piles are commonly used in construction to support buildings, bridges, and other structures.

    • They are driven or drilled into the ground to provide stability and prevent settling or shifting.

    • Different types of piles include timber, concrete, steel, and composite piles.

    • Pile foundations are often used in ...

  • Answered by AI
  • Q2. What is vertical load test of pile ?
  • Ans. 

    Vertical load test of pile is a test to determine the load carrying capacity of a pile.

    • A vertical load is applied to the pile using a hydraulic jack or a reaction frame.

    • The load is increased until the pile reaches its ultimate capacity or a predetermined limit.

    • The test helps in determining the pile's load settlement behavior and its ultimate bearing capacity.

    • The test is commonly used in the construction industry to ens...

  • Answered by AI
  • Q3. What is the lateral load test of pile ?
  • Ans. 

    Lateral load test of pile is a test to determine the lateral capacity of a pile.

    • It involves applying a horizontal load to the pile and measuring the deflection.

    • The test is conducted by using a hydraulic jack or a reaction frame.

    • The lateral load test helps in determining the lateral load capacity of the pile.

    • The test results are used to design the foundation of the structure.

    • The lateral load test is important for struct...

  • Answered by AI
  • Q4. IS code Vertical load test of pile ?
  • Ans. 

    Yes

    • Yes, there is an IS code for vertical load test of piles.

    • The relevant IS code is IS 2911 (Part 4): 2013 - 'Design and construction of pile foundations - Load test on piles'.

    • This code provides guidelines for conducting vertical load tests on piles to determine their load-carrying capacity and performance.

    • The code covers various aspects such as test setup, instrumentation, loading procedures, acceptance criteria, and ...

  • Answered by AI
  • Q5. Why I do vertical load test of pile ?
  • Ans. 

    Vertical load test of pile is done to determine the load carrying capacity of the pile.

    • To ensure the pile can support the intended load

    • To determine the settlement of the pile under load

    • To verify the design assumptions

    • To assess the quality of the pile installation

    • Examples: bridge piers, high-rise buildings, transmission towers

  • Answered by AI
  • Q6. Vertical load test procedure ?
  • Ans. 

    Vertical load test is a procedure to determine the load-bearing capacity of a structure.

    • The test involves applying a vertical load to the structure and measuring the resulting deflection.

    • The load is gradually increased until the structure reaches its maximum load-bearing capacity.

    • The test can be performed using hydraulic jacks, weights, or other equipment.

    • The results of the test are used to ensure the safety and stabil...

  • Answered by AI
  • Q7. Lateral load test procedure ?
  • Ans. 

    Lateral load test is a procedure to determine the strength and stability of a structure against horizontal forces.

    • The test involves applying a horizontal force to the structure and measuring its response.

    • The force is usually applied using hydraulic jacks or a reaction frame.

    • The test is performed on a representative section of the structure, such as a column or a wall.

    • The results of the test are used to verify the desig...

  • Answered by AI
  • Q8. What is the SPT test of soil ?
  • Ans. 

    SPT test is a standard penetration test used to determine the soil's resistance to penetration.

    • SPT test involves driving a standard sampler into the soil using a hammer of standard weight and height.

    • The number of blows required to drive the sampler a certain distance is recorded as the SPT N-value.

    • SPT test is commonly used in geotechnical engineering to determine soil properties such as shear strength and bearing capac...

  • Answered by AI
  • Q9. What is MPR ,WPR , DPR ?
  • Ans. 

    MPR, WPR, and DPR are acronyms used in various fields to represent different concepts.

    • MPR stands for Monthly Progress Report, which is a document that provides an overview of the progress made during a specific month.

    • WPR stands for Weekly Progress Report, which is a document that highlights the progress made on a weekly basis.

    • DPR stands for Daily Progress Report, which is a document that summarizes the daily progress m...

  • Answered by AI
  • Q10. BBS calculation of pile ?
  • Ans. 

    BBS calculation is a method used to determine the reinforcement required for a pile.

    • BBS stands for Bar Bending Schedule.

    • It involves calculating the length and number of steel bars required for the pile.

    • Factors such as load capacity, soil type, and pile diameter are taken into consideration.

    • The BBS is used to ensure the pile can withstand the required load and prevent failure.

  • Answered by AI
  • Q11. How meny test of pile ?
  • Ans. 

    The number of tests required for a pile depends on various factors such as the type of pile, soil conditions, and project requirements.

    • The number of tests can range from one to several depending on the project.

    • Common tests for piles include static load tests, dynamic load tests, and integrity tests.

    • Factors such as pile length, diameter, and soil type can affect the number of tests required.

    • The project specifications an...

  • Answered by AI
  • Q12. What is the cut off level of pile ?
  • Ans. 

    The cut off level of pile depends on various factors such as soil type, load capacity, and design requirements.

    • The cut off level of pile is the depth at which the pile is embedded into the ground.

    • It is determined by the soil type and load capacity of the ground.

    • The design requirements of the structure being built also play a role in determining the cut off level of pile.

    • For example, if the structure requires a deeper f...

  • Answered by AI
  • Q13. Minimum distance of detume bar of pile vertical load test ?
  • Ans. 

    The minimum distance of detume bar of pile vertical load test is typically 2.5 times the diameter of the pile.

    • The detume bar is used to measure the settlement of the pile during the load test.

    • The minimum distance is important to ensure accurate measurement of the pile settlement.

    • The distance is typically 2.5 times the diameter of the pile, but may vary depending on the specific test requirements.

    • If the distance is too ...

  • Answered by AI
  • Q14. Why I do dynamic load test of pile ?
  • Ans. 

    Dynamic load test of pile is done to assess its load carrying capacity and integrity.

    • To ensure the pile can withstand the expected load and prevent failure

    • To determine the pile's ultimate bearing capacity

    • To assess the pile's integrity and detect any defects or damage

    • To verify the design assumptions and optimize the foundation design

    • Examples: bridge piers, tall buildings, wind turbines, etc.

  • Answered by AI
  • Q15. Why I do integrity test of pile ?
  • Ans. 

    Integrity test of pile is done to ensure the pile is structurally sound and can bear the required load.

    • To ensure the pile is not damaged during installation

    • To check if the pile is free from any defects or cracks

    • To verify if the pile can bear the required load

    • To ensure the safety of the structure and its occupants

    • Examples: Sonic Integrity Testing, Crosshole Sonic Logging, etc.

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Water proofing Related question
  • Q2. BBS Related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Totally Technical interview it was.

I appeared for an interview in Sep 2021.

Interview Questionnaire 

1 Question

  • Q1. They basically ask about your job profile to match their requirements.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about what learned from your experience

RKS Construction Interview FAQs

How many rounds are there in RKS Construction Consultant interview?
RKS Construction interview process usually has 1 rounds. The most common rounds in the RKS Construction interview process are Aptitude Test.

Tell us how to improve this page.

RKS Construction Consultant Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Civil Site Engineer
11 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Site Engineer
6 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Supervisor
6 salaries
unlock blur

₹2.2 L/yr - ₹2.5 L/yr

Civil Engineer
6 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Safety Supervisor
4 salaries
unlock blur

₹1.2 L/yr - ₹2.2 L/yr

Explore more salaries
Compare RKS Construction with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview