The responsibility of a planning engineer is to develop project schedules, monitor progress, analyze data, and ensure timely completion of projects.
Develop project schedules based on scope of work and resources available
Monitor progress and update schedules as needed
Analyze data to identify potential delays or issues
Coordinate with project team to ensure timely completion
Prepare reports and presentations on project sta
DPR (Daily Progress Report) and MPR (Monthly Progress Report) are prepared by collecting and analyzing data on daily and monthly basis to track project progress.
Collect daily progress data from site engineers and subcontractors
Analyze the data to track project milestones and identify any delays
Prepare daily progress reports summarizing work completed, issues faced, and resources used
Compile monthly progress reports by ...
Top trending discussions
posted on 21 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
posted on 30 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.
IS 1200
posted on 11 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Client bills are submitted by verifying the services provided and charges incurred, generating an invoice, and sending it to the client.
Verify services provided and charges incurred
Generate invoice
Send invoice to client
Variations & extra items refer to additional charges or changes made to a standard billing item.
Variations can include changes in pricing due to location, time of day, or other factors.
Extra items can include additional services or products added to a standard billing item.
These charges are typically added on top of the standard billing item and can increase the overall cost.
Examples include a hotel charging extra for ...
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
posted on 22 Jun 2024
posted on 8 Dec 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
Yes, I can prepare BBS (Bar Bending Schedule).
I have experience in preparing BBS for various projects.
I am proficient in using software like AutoCAD and Excel for BBS preparation.
I ensure that the BBS is accurate and meets the project requirements.
I also coordinate with the site team to ensure timely delivery of BBS.
Yes, I am familiar with Rate Analysis. A rate analysis for blockwork involves calculating the cost of materials, labor, and equipment needed for the project.
Determine the quantity of materials needed for the blockwork
Calculate the cost of materials per unit
Estimate the labor cost based on the time required for the project
Include equipment costs such as scaffolding and tools
Add all costs together to determine the total ...
Yes, I am familiar with item rate billing.
Item rate billing is a method of billing where each item or service is charged separately.
It is commonly used in construction and engineering projects.
The rates for each item are pre-determined and agreed upon by both parties.
This type of billing allows for greater transparency and accuracy in billing.
It also allows for easier tracking of expenses and budgeting.
Basic rate variation refers to the change in the standard rate of a particular item or service.
It is a change in the standard rate of a particular item or service
It can be due to various factors such as inflation, market demand, etc.
For example, if the basic rate of a product is $10 and it increases to $12, it is a basic rate variation.
Basic rate variation is due to changes in the scope of work, while rate escalation is due to inflation or market changes.
Basic rate variation occurs due to changes in the scope of work, such as additional work or changes in the design.
Rate escalation occurs due to inflation or market changes, such as an increase in the cost of materials or labor.
Basic rate variation is typically negotiated and agreed upon before the st...
based on 1 interview
Interview experience
Assistant Manager
37
salaries
| ₹5.4 L/yr - ₹10.8 L/yr |
Tunnel Engineer
21
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Civil Engineer
20
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Surveyor
18
salaries
| ₹2.2 L/yr - ₹8.4 L/yr |
Senior Engineer
17
salaries
| ₹5 L/yr - ₹8.5 L/yr |
L&T Construction
Simplex Infrastructures
L&T Energy Hydrocarbon
AECOM