Filter interviews by
Be the first one to contribute and help others!
I applied via LinkedIn
My aptitude test should be taken from Math Science.
I was interviewed in Dec 2024.
Coding round was ok with mid level difficult questions
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Safety work of area involves implementing safety measures to prevent accidents and ensure a safe working environment.
Conduct regular safety inspections of the work area
Provide safety training to all workers
Enforce the use of personal protective equipment (PPE)
Implement safety protocols and procedures
Maintain clear and accessible emergency exits
Ensure proper storage and handling of hazardous materials
I applied via Walk-in and was interviewed in Dec 2024. There were 7 interview rounds.
One to one meeting i will aspects
Any one i will aspects
Any one i will accpected
Project discussion for some ones
Any ons disscuss of project worth
Both are i will according test
posted on 24 Jan 2025
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
Monolithic architecture is a single-tiered software application while microarchitecture is a multi-tiered software application.
Monolithic architecture is a single-tiered software application where all components are interconnected and interdependent.
Microarchitecture is a multi-tiered software application where components are divided into separate layers, each with its own responsibility.
Monolithic architecture is easi...
Cloud offers scalability, cost-effectiveness, flexibility, and accessibility compared to on-premise solutions.
Scalability: Cloud allows for easily scaling resources up or down based on demand, while on-premise solutions require physical upgrades.
Cost-effectiveness: Cloud eliminates the need for expensive hardware and maintenance costs associated with on-premise solutions.
Flexibility: Cloud offers the ability to access ...
I applied via Job Portal
I have over 15 years of experience in senior executive roles, leading cross-functional teams and driving strategic initiatives.
Led cross-functional teams to successfully launch new products in the market
Developed and implemented strategic plans to drive revenue growth
Managed key client relationships and negotiated high-value contracts
Implemented cost-saving measures resulting in significant savings for the company
My Key Result Areas (KRAs) include strategic planning, team leadership, financial management, and business development.
Strategic planning to set long-term goals and objectives
Team leadership to motivate and guide employees towards achieving goals
Financial management to ensure efficient use of resources and budgeting
Business development to identify growth opportunities and expand market presence
Senior Executive oversees daily operations, sets goals, and ensures company objectives are met.
Responsible for strategic planning and decision-making
Supervises and motivates team members
Monitors performance and implements improvements
Collaborates with other departments for cross-functional projects
I utilize a systematic approach to prepare documents efficiently and accurately.
I start by reviewing the requirements and guidelines for the document.
I organize the information in a logical manner before beginning the writing process.
I use templates or formatting tools to ensure consistency and professionalism.
I proofread and edit the document multiple times to catch any errors or inconsistencies.
I seek feedback from c...
A popular application for managing dispatch is Fleet Complete.
Fleet Complete offers real-time tracking of vehicles and assets
It provides route optimization and scheduling tools
The application allows for communication with drivers and customers
Fleet Complete offers reporting and analytics features for performance monitoring
I was interviewed in Aug 2024.
posted on 11 Sep 2024
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
A PID controller is a type of feedback control system that calculates an error value as the difference between a desired setpoint and a measured process variable.
PID stands for Proportional-Integral-Derivative, which are the three terms used to describe the controller's actions.
The proportional term responds to the current error value.
The integral term responds to the accumulation of past errors.
The derivative term res...
The power curve of a Wind Energy Conversion System (WECS) shows the relationship between wind speed and power output.
The power curve typically shows the rated power output at a certain wind speed, as well as the cut-in and cut-out speeds.
It is important for optimizing the performance of the WECS and determining the best locations for installation.
The shape of the power curve can vary depending on the type of wind turbi...
based on 6 reviews
Rating in categories
Company Secretary
7
salaries
| ₹3.3 L/yr - ₹10 L/yr |
Deputy Manager
4
salaries
| ₹4.8 L/yr - ₹5.5 L/yr |
Company Secretary & Legal Head
4
salaries
| ₹6.4 L/yr - ₹9.5 L/yr |
Engineer
3
salaries
| ₹5 L/yr - ₹7 L/yr |
Project Engineer
3
salaries
| ₹4 L/yr - ₹4.5 L/yr |
Adani Group
Adani Power
Suzlon Group
Eaton Corporation