Filter interviews by
The capacity of burners refers to the maximum amount of fuel that can be burned in a given time period.
Capacity is typically measured in BTUs (British Thermal Units) per hour.
Factors affecting burner capacity include the size of the burner, the type of fuel being used, and the efficiency of the burner.
For example, a large industrial furnace may have a capacity of 1 million BTUs per hour, while a small residential gas s...
Top trending discussions
posted on 10 Jun 2024
Six Sigma is a methodology used in lean manufacturing to improve processes by reducing defects and variation.
Six Sigma aims to achieve a level of quality where there are only 3.4 defects per million opportunities.
It focuses on identifying and eliminating causes of defects to improve overall process efficiency.
Six Sigma uses statistical tools and techniques to measure and analyze process performance.
It involves defining...
TPM stands for Total Productive Maintenance and JH stands for Just in Time. TPM focuses on maintaining equipment to prevent breakdowns, while JH focuses on minimizing waste and improving efficiency.
TPM involves proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
JH focuses on reducing waste, improving efficiency, and delivering products just in time to meet customer demand
TPM steps in...
posted on 2 Oct 2023
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 6 Nov 2023
Alignment of mould is crucial for ensuring proper functioning and quality of the final product.
Ensure mould components are properly assembled and secured
Use alignment tools such as dial indicators or laser alignment systems
Check for any misalignments or discrepancies and make necessary adjustments
Regularly inspect and maintain the mould to prevent misalignment issues
Consult with senior engineers or experts for guidance
To solve mould vibration problem, identify root cause, adjust machine settings, use vibration dampening materials, and regularly maintain equipment.
Identify the root cause of the vibration issue by inspecting the mould and surrounding equipment.
Adjust machine settings such as speed, pressure, and temperature to minimize vibration.
Use vibration dampening materials like rubber pads or mounts to reduce the impact of vibra...
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
I'm sorry, but I don't think I understand the question. Could you please clarify?
posted on 30 May 2022
I applied via Campus Placement
posted on 6 Aug 2021
I applied via Walk-in and was interviewed in Jul 2021. There were 4 interview rounds.
posted on 13 Jul 2021
I applied via Referral and was interviewed in Jan 2021. There were 4 interview rounds.
posted on 18 May 2021
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I am a mechanical engineer with expertise in designing and analyzing mechanical systems.
I have a Bachelor's degree in Mechanical Engineering from XYZ University.
I have experience working with CAD software such as AutoCAD and SolidWorks.
I have successfully designed and implemented mechanical systems for various projects, including a robotic arm for industrial automation.
I am skilled in conducting stress and strain analy...
I was responsible for designing and analyzing mechanical systems, conducting tests and experiments, and collaborating with cross-functional teams.
Designed and analyzed mechanical systems for various projects
Conducted tests and experiments to ensure the functionality and performance of the systems
Collaborated with cross-functional teams including electrical engineers and project managers
Provided technical support and tr...
posted on 10 Jun 2024
Six Sigma is a methodology used in lean manufacturing to improve processes by reducing defects and variation.
Six Sigma aims to achieve a level of quality where there are only 3.4 defects per million opportunities.
It focuses on identifying and eliminating causes of defects to improve overall process efficiency.
Six Sigma uses statistical tools and techniques to measure and analyze process performance.
It involves defining...
TPM stands for Total Productive Maintenance and JH stands for Just in Time. TPM focuses on maintaining equipment to prevent breakdowns, while JH focuses on minimizing waste and improving efficiency.
TPM involves proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
JH focuses on reducing waste, improving efficiency, and delivering products just in time to meet customer demand
TPM steps in...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Engineer
94
salaries
| ₹1.5 L/yr - ₹3.1 L/yr |
Junior Engineer
48
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Engineer
39
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Production Engineer
30
salaries
| ₹1.5 L/yr - ₹5.7 L/yr |
Senior Engineer
26
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Jindal Steel and Power