Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by ReNew Team. If you also belong to the team, you can get access from here

ReNew Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

ReNew Deputy General Manager Manufacturing Engineering Interview Questions and Answers

Updated 17 Feb 2023

ReNew Deputy General Manager Manufacturing Engineering Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical challenges faced and how did you overcome that in last year
  • Q2. New project establishment requirements from manufacturing engineering perspective
  • Ans. 

    Manufacturing engineering requires clear project establishment requirements for new projects.

    • Clear understanding of project goals and objectives

    • Detailed project plan with timelines and milestones

    • Identification of required resources and equipment

    • Risk assessment and mitigation plan

    • Regular communication and collaboration with other departments

    • Continuous improvement and optimization of manufacturing processes

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Cultural differences between automobile and renewable industries
  • Ans. 

    Renewable industry is more focused on sustainability and environmental impact while automobile industry is more concerned with performance and speed.

    • Renewable industry emphasizes on using eco-friendly materials and reducing carbon footprint

    • Automobile industry prioritizes on improving engine efficiency and horsepower

    • Renewable industry is more collaborative and open to sharing information and technology

    • Automobile industr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong in core subject and have confidence. Develop technical expertise in your role. Ready to face deep knowledge check as well as fundamental questions.

Interview questions from similar companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Conceptual questions only

I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.

Round 1 - Aptitude Test 

Basic electrical topics. wind energy, solar

Round 2 - Group Discussion 

Your past experience and project repots

Round 3 - Case Study 

Yes about of renewability energy

Round 4 - HR 

(1 Question)

  • Q1. Previous company feedback

Interview Preparation Tips

Interview preparation tips for other job seekers - For working in greenko very good , food free, good environment
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the function of DFIG generator?
  • Ans. 

    DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.

    • DFIG generator is a type of induction generator used in wind turbines.

    • It allows for variable speed operation, improving efficiency and power quality.

    • DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.

    • The converter controls the...

  • Answered by AI
  • Q2. What is difference between synchronous and asynchronous generator?
  • Ans. 

    Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.

    • Synchronous generators have a fixed magnetic field and produce power at a constant frequency.

    • Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.

    • Synchronous generators are typically used in power plants, while asy...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not loose hope, keep your expertise updated and keep learning from past interviews which was helpful for upcoming.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. How do you look at critical path as the longest path or path with zero float?
  • Ans. 

    Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.

    • Critical path is the sequence of tasks that determines the total duration of a project.

    • It is the longest path through the project network diagram, with zero float or slack.

    • Any delay in tasks on the critical path will directly impact the project's completion date.

    • Identifying the critical path hel...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm and answer
Interview experience
4
Good
Difficulty level
-
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. About your project
  • Q2. Previous experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Discussion on background and profile
Round 2 - Aptitude Test 

Psychometric test happened online

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding Mechanical quality of past projects
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to sub stations
  • Q2. Clearances in the station
  • Ans. 

    Clearances in the station refer to the process of ensuring that all necessary approvals and permissions are obtained before proceeding with a task or project.

    • Clearances may include safety clearances, security clearances, and regulatory clearances.

    • Examples of clearances in a station could be obtaining permission from the fire department before conducting a fire drill, or ensuring that all employees have completed backgr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Fully technical questions and attitude communication etc
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion

ReNew Interview FAQs

How many rounds are there in ReNew Deputy General Manager Manufacturing Engineering interview?
ReNew interview process usually has 3 rounds. The most common rounds in the ReNew interview process are HR, Resume Shortlist and Technical.
What are the top questions asked in ReNew Deputy General Manager Manufacturing Engineering interview?

Some of the top questions asked at the ReNew Deputy General Manager Manufacturing Engineering interview -

  1. New project establishment requirements from manufacturing engineering perspecti...read more
  2. Cultural differences between automobile and renewable industr...read more

Tell us how to improve this page.

ReNew Deputy General Manager Manufacturing Engineering Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 232 Interviews
Vestas Interview Questions
4.2
 • 88 Interviews
Jakson Group Interview Questions
4.2
 • 83 Interviews
Siemens Energy Interview Questions
4.1
 • 76 Interviews
Waaree Energies Interview Questions
3.9
 • 61 Interviews
Greenko Group Interview Questions
3.8
 • 50 Interviews
Reliance Power Interview Questions
4.1
 • 48 Interviews
Assystem Interview Questions
3.6
 • 46 Interviews
View all
Assistant Manager
410 salaries
unlock blur

₹5.6 L/yr - ₹17 L/yr

Senior Engineer
351 salaries
unlock blur

₹4.1 L/yr - ₹10.5 L/yr

Engineer
339 salaries
unlock blur

₹2.9 L/yr - ₹8 L/yr

Deputy Manager
319 salaries
unlock blur

₹7.5 L/yr - ₹23 L/yr

Senior Manager
154 salaries
unlock blur

₹15 L/yr - ₹43 L/yr

Explore more salaries
Compare ReNew with

Adani Power

3.9
Compare

Adani Green Energy

4.1
Compare

Vestas

4.2
Compare

Jakson Group

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview