posted on 15 Feb 2023
I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.
Manufacturing engineering requires clear project establishment requirements for new projects.
Clear understanding of project goals and objectives
Detailed project plan with timelines and milestones
Identification of required resources and equipment
Risk assessment and mitigation plan
Regular communication and collaboration with other departments
Continuous improvement and optimization of manufacturing processes
Renewable industry is more focused on sustainability and environmental impact while automobile industry is more concerned with performance and speed.
Renewable industry emphasizes on using eco-friendly materials and reducing carbon footprint
Automobile industry prioritizes on improving engine efficiency and horsepower
Renewable industry is more collaborative and open to sharing information and technology
Automobile industr...
Top trending discussions
I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.
Basic electrical topics. wind energy, solar
Your past experience and project repots
Yes about of renewability energy
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.
DFIG generator is a type of induction generator used in wind turbines.
It allows for variable speed operation, improving efficiency and power quality.
DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.
The converter controls the...
Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators have a fixed magnetic field and produce power at a constant frequency.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are typically used in power plants, while asy...
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Psychometric test happened online
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
Clearances in the station refer to the process of ensuring that all necessary approvals and permissions are obtained before proceeding with a task or project.
Clearances may include safety clearances, security clearances, and regulatory clearances.
Examples of clearances in a station could be obtaining permission from the fire department before conducting a fire drill, or ensuring that all employees have completed backgr...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
410
salaries
| ₹5.6 L/yr - ₹17 L/yr |
Senior Engineer
351
salaries
| ₹4.1 L/yr - ₹10.5 L/yr |
Engineer
339
salaries
| ₹2.9 L/yr - ₹8 L/yr |
Deputy Manager
319
salaries
| ₹7.5 L/yr - ₹23 L/yr |
Senior Manager
154
salaries
| ₹15 L/yr - ₹43 L/yr |
Adani Power
Adani Green Energy
Vestas
Jakson Group