i
Filter interviews by
I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.
Answers to interview questions for Tower Engineer position.
1) Curing is the process of maintaining moisture and temperature conditions in concrete for hydration to occur.
2) Development length refers to the length of reinforcement required to transfer stress from one concrete element to another, while lapping is the overlapping of reinforcement bars to ensure continuity.
3) M25 is a designation for a concrete mix with a ...
Riser is the vertical part of a step while tread is the horizontal part on which the foot is placed.
Riser is the height of each step while tread is the depth of each step.
The ratio of riser to tread is regulated by building codes to ensure safety.
For example, a typical residential staircase may have a riser height of 7 inches and a tread depth of 11 inches.
The riser and tread dimensions can affect the ease and safety o
Top trending discussions
based on 3 reviews
Rating in categories
Assistant Manager
521
salaries
| ₹1.4 L/yr - ₹8 L/yr |
Senior Executive
280
salaries
| ₹1.7 L/yr - ₹6.2 L/yr |
Sales Executive
220
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Sales Officer
187
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Executive
186
salaries
| ₹1.2 L/yr - ₹5.1 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group