Filter interviews by
I applied via Referral and was interviewed in Dec 2021. There were 3 interview rounds.
The initial pile load test is conducted before construction to determine the load-bearing capacity of the pile. Routine pile load tests are performed periodically during construction to ensure the piles are still capable of supporting the required loads.
Initial pile load tests are conducted before construction begins to assess the load-bearing capacity of the piles.
Routine pile load tests are performed periodically dur...
Top trending discussions
posted on 5 Nov 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 2 interview rounds.
Need to training for design software course.
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
posted on 22 Dec 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
Transmission line construction involves planning, designing, and building structures to support power lines.
The process starts with surveying the land and obtaining necessary permits.
Next, the route is planned and the towers or poles are designed.
The towers or poles are then erected and the power lines are strung between them.
Finally, the lines are tested and put into operation.
Construction may involve the use of heavy...
Manager
3
salaries
| ₹7.5 L/yr - ₹8.6 L/yr |
Structural Engineer
3
salaries
| ₹3.2 L/yr - ₹4.2 L/yr |
Business Development Executive
3
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Civil Site Engineer
3
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group