Control valve consists of parts like valve body, actuator, positioner, and trim.
Valve body: main housing that contains the flow passage and seat
Actuator: device that adjusts the position of the valve plug
Positioner: controls the valve position based on input signals
Trim: internal components that control flow through the valve
Mass flow meter works on the principle of measuring the mass flow rate of a fluid passing through a tube.
Mass flow meter measures the mass flow rate of a fluid, unlike traditional flow meters which measure volume flow rate.
It operates based on the principle of Coriolis effect, thermal dispersion, or pressure drop.
Coriolis mass flow meters use the twisting force generated by the fluid's mass flow to measure flow rate.
Th...
2 out of 3 logic is a system where a decision is made based on the agreement of at least 2 out of 3 inputs.
In 2 out of 3 logic, a decision is made based on the majority agreement of 3 inputs.
For example, if 2 out of 3 inputs are 'true', the overall decision would be 'true'.
This logic is commonly used in voting systems and fault-tolerant systems.
I applied via Walk-in
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Nov 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2021. There was 1 interview round.
I have fabricated X tons of material within Y time span with successful execution.
Amount of material fabricated
Time span for fabrication
Execution success rate
PMO stands for Project Management Office. It is a centralized department that oversees project management across an organization.
PMO provides guidance, support, and standards for project management
It ensures that projects are aligned with the organization's goals and objectives
PMO monitors project progress and provides regular reports to stakeholders
It also manages resources, budgets, and risks associated with projects
...
The number of labors required in a cum RCC depends on various factors such as project size, complexity, and timeline.
The number of labors required in a cum RCC can vary depending on the size of the project. Larger projects may require more labors.
The complexity of the project also plays a role in determining the number of labors needed. More complex projects may require additional skilled labors.
The timeline of the pro...
Senior Engineer
20
salaries
| ₹8.4 L/yr - ₹20 L/yr |
Executive Accountant
17
salaries
| ₹0.8 L/yr - ₹3 L/yr |
Apprentice Trainee
17
salaries
| ₹0.6 L/yr - ₹4 L/yr |
Deputy Manager
16
salaries
| ₹12 L/yr - ₹22 L/yr |
Plant Operator
15
salaries
| ₹0.9 L/yr - ₹4.8 L/yr |
National Fertilizers
Coromandel International
Tata Chemicals
Deepak Fertilisers and Petrochemicals