Filter interviews by
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
I want to join JTEKT because of their reputation for innovation and commitment to excellence in the production engineering field.
JTEKT has a strong reputation for innovation and cutting-edge technology in the production engineering industry.
I am impressed by JTEKT's commitment to excellence and continuous improvement in their products and processes.
I believe that working at JTEKT will provide me with valuable opportuni...
7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.
7 QC stands for Seven Quality Control tools
These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement
PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.
PPL is a measure of how much production is achieved per unit of labor input.
PPLH is a measure of how much production is achieved per labor hour.
Both metrics are used to evaluate the efficiency of production processes.
For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.
If the same factory op...
posted on 29 Jul 2024
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
posted on 28 Aug 2023
I applied via Recruitment Consulltant
I applied via Approached by Company and was interviewed in Jul 2023. There were 6 interview rounds.
7 qc,monozukuri , pfmea,tpm,cycle time ,lead time, how wastes control,
About Subros company,vision,core value
I am also working as a trainer .
About ac cycle ,line balancing
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
The 7 wastes of production are categories of waste that can occur in manufacturing processes.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to storage costs and potential waste
Motion: Unnecessary movement of workers
Waiting: Idle time during production processes
Overproduction: Producing more than needed
Overprocessing: Using more resources than necessary
Defects: Errors le
Lean manufacturing is a production method focused on minimizing waste and maximizing efficiency.
Focuses on eliminating waste in all forms, including time, materials, and resources
Involves continuous improvement and problem-solving to streamline processes
Emphasizes value creation for the customer
Utilizes tools such as 5S, Kanban, and Kaizen
Promotes a culture of employee involvement and empowerment
Kaizen is a Japanese term meaning continuous improvement. There are several types of Kaizen, including Gemba Kaizen, Flow Kaizen, and Process Kaizen.
Kaizen is a Japanese business philosophy focused on continuous improvement.
Gemba Kaizen involves making improvements at the workplace where the work is done.
Flow Kaizen focuses on improving the flow of work or processes.
Process Kaizen involves making improvements to specif
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
The list count of vernier caliper is 20.
Vernier caliper has two scales - main scale and vernier scale.
The main scale has 10 divisions, each division is 1 mm.
The vernier scale has 9 divisions, each division is 0.9 mm.
The list count is the number of smallest divisions on the vernier scale that coincide with a division on the main scale.
In case of vernier caliper, the list count is 20.
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. 5M is a method for improving workplace safety and efficiency. KPI stands for Key Performance Indicator.
5S focuses on organizing the workplace to improve efficiency and reduce waste.
5M stands for Man, Machine, Material, Method, and Measurement and is used to identify areas for improvement in workp...
based on 10 reviews
Rating in categories
Assistant Manager
141
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Senior Engineer
102
salaries
| ₹3 L/yr - ₹6.9 L/yr |
Deputy Manager
69
salaries
| ₹6.2 L/yr - ₹14.3 L/yr |
Quality Inspector
54
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Senior Executive
49
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Sundaram Clayton
Amara Raja Energy & Mobility
Samvardhana Motherson Group
Bharat Forge