RAJ BUILDCON CONSTRUCTION Site Engineer Mechanical Interview Questions and Answers

Updated 18 Dec 2020

RAJ BUILDCON CONSTRUCTION Site Engineer Mechanical Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. The difference between I and H beam, if suddenly your fitter gone than what will you do
  • Ans. 

    The I beam and H beam are structural steel members with different cross-sectional shapes. If the fitter is absent, I would take the following steps:

    • Assess the progress of the work and identify the tasks that can be done without the fitter.

    • Delegate the tasks to other available workers or coordinate with other teams to ensure the work continues smoothly.

    • If the absence of the fitter significantly affects the progress or s...

  • Answered by AI
  • Q2. How will you check welding quality and alignment of structure
  • Ans. 

    To check welding quality and alignment of structure, various methods can be used such as visual inspection, non-destructive testing, and dimensional checks.

    • Visual inspection: This involves visually examining the welds for any defects such as cracks, porosity, or incomplete fusion.

    • Non-destructive testing: Techniques like ultrasonic testing, radiography, or magnetic particle testing can be used to detect any internal def...

  • Answered by AI
  • Q3. Before splice plate fixed ,how will you check beam connecting
  • Ans. 

    Before fixing the splice plate, the beam connecting can be checked by performing visual inspection, measuring dimensions, and conducting non-destructive testing.

    • Perform a visual inspection to check for any visible defects or damage on the beam and its connections.

    • Measure the dimensions of the beam and its connections to ensure they meet the required specifications.

    • Conduct non-destructive testing methods such as ultraso...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - First you'll have to understand questions than give answer if u don't know so please be honest and say sorry next question that's it.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Rail weding & usfd testing engineering
  • Q2. Welding all activities
  • Q3. Welding activities
  • Q4. Mechanical engineering
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All Equipment Maintenance
  • Q2. P&M Department Related

I applied via Walk-in and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Steel plant maintenance
  • Q2. Maintenance engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - mechanical maintenance
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Shear force and bmd
  • Q2. Types of beam ,propped cantiliver beam
  • Ans. 

    A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.

    • Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.

    • The prop helps to reduce the bending moment and deflection at the free end of the beam.

    • These beams are commonly used in construction to support overhanging structures or balconies.

    • Example...

  • Answered by AI
  • Q3. Which beam will have highest thickness
  • Ans. 

    The beam with the highest thickness will depend on the specific design and requirements of the structure.

    • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

    • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

    • For example, a bridge beam supporting heavy traffic will likely have a higher thickness than

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Site Engineer interview:
  • Concrete
  • RCC
Interview preparation tips for other job seekers - basic core questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. What is packing supervisor
  • Ans. 

    A packing supervisor is responsible for overseeing the packing process in a warehouse or manufacturing facility.

    • Supervises packing staff to ensure efficient and accurate packing of products

    • Monitors inventory levels and orders packing supplies as needed

    • Ensures compliance with safety regulations and quality standards

    • Trains new packing employees on packing procedures and equipment usage

  • Answered by AI
  • Q2. When you are free job
  • Q3. What is your company policy
  • Ans. 

    Our company policy prioritizes safety, quality, and efficiency in all operations.

    • Safety is our top priority, with strict adherence to safety protocols and regulations.

    • Quality control measures are in place to ensure high standards are met in all projects.

    • Efficiency is emphasized to maximize productivity and meet project deadlines.

    • Regular training and development programs are provided to employees to uphold company stand...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is M25 ratio
  • Ans. 

    M25 ratio is the mix design ratio for concrete which specifies the ratio of cement, sand, and aggregate.

    • M25 ratio is commonly used in construction for high-strength concrete.

    • The ratio represents the mix of cement, sand, and aggregate in the concrete mix.

    • For example, a common M25 mix ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

  • Answered by AI
  • Q2. Length of a steel bar
  • Ans. 

    The length of a steel bar can vary depending on the specific project requirements and specifications.

    • The length of a steel bar is typically specified in the project drawings or specifications.

    • Common lengths for steel bars include 20 feet, 30 feet, and 40 feet.

    • Steel bars can also be custom cut to specific lengths as needed for the project.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You doing good job
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is CBR value
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the nominal brick size?
  • Ans. 

    The nominal brick size is typically 90 mm x 90 mm x 90 mm.

    • Nominal brick size is commonly 90 mm x 90 mm x 90 mm.

    • It may vary slightly depending on the country or region.

    • Brick sizes are standardized for construction purposes.

  • Answered by AI

RAJ BUILDCON CONSTRUCTION Interview FAQs

What are the top questions asked in RAJ BUILDCON CONSTRUCTION Site Engineer Mechanical interview?

Some of the top questions asked at the RAJ BUILDCON CONSTRUCTION Site Engineer Mechanical interview -

  1. The difference between I and H beam, if suddenly your fitter gone than what wil...read more
  2. How will you check welding quality and alignment of struct...read more
  3. Before splice plate fixed ,how will you check beam connect...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 RAJ BUILDCON CONSTRUCTION interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 689 Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Tata Technologies Interview Questions
3.7
 • 247 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
View all
Site Engineer
4 salaries
unlock blur

₹3.2 L/yr - ₹4.2 L/yr

Explore more salaries
Compare RAJ BUILDCON CONSTRUCTION with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Megha Engineering & Infrastructures

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview