I applied via Referral and was interviewed in Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is flow and how can we calculate it in a given size of pipe?
  • Ans. 

    Flow in a pipe is the movement of fluid through the pipe. It can be calculated using the formula Q = A * V, where Q is the flow rate, A is the cross-sectional area of the pipe, and V is the velocity of the fluid.

    • Flow in a pipe refers to the volume of fluid passing through the pipe per unit time.

    • To calculate flow in a given size of pipe, you can use the formula Q = A * V, where Q is the flow rate, A is the cross-section...

  • Answered by AI
  • Q2. What are the modes of heat transfer?
  • Ans. 

    The modes of heat transfer are conduction, convection, and radiation.

    • Conduction: Heat transfer through direct contact between particles. Example: Touching a hot pan.

    • Convection: Heat transfer through the movement of fluids (liquids or gases). Example: Boiling water.

    • Radiation: Heat transfer through electromagnetic waves. Example: Feeling the warmth of the sun.

  • Answered by AI
  • Q3. What is LMTD and explain
  • Ans. 

    LMTD stands for Log Mean Temperature Difference and is used in heat exchanger design to calculate the average temperature difference between the hot and cold fluids.

    • LMTD is used in the design of heat exchangers to determine the overall heat transfer coefficient.

    • It takes into account the temperature difference between the hot and cold fluids at different points along the heat exchanger.

    • The formula for LMTD is (ΔT1 - ΔT2...

  • Answered by AI
  • Q4. What is water hammering and explain it
  • Ans. 

    Water hammering is a phenomenon where pipes make loud banging noises due to sudden changes in water flow velocity.

    • Water hammering occurs when a valve is suddenly closed, causing a pressure surge in the pipes.

    • The pressure surge creates a shockwave that travels through the pipes, resulting in loud banging noises.

    • Water hammering can lead to damage to pipes, fittings, and appliances if not addressed.

    • To prevent water hammer...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As i attended interview at raichem Medicare they ask relevant of their role and responsibilities in company and they ask about their equipments present at raichem Medicare.

Interview questions from similar companies

I applied via Referral and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. 1)which refrigeration cycle used in chilling plant?
  • Ans. 

    The refrigeration cycle used in a chilling plant is typically the vapor compression cycle.

    • The vapor compression cycle involves compressing refrigerant vapor to increase its temperature and pressure.

    • The high-pressure vapor then condenses into a liquid, releasing heat.

    • The liquid refrigerant then passes through an expansion valve, reducing its pressure and temperature.

    • The low-pressure liquid then evaporates, absorbing hea...

  • Answered by AI
  • Q2. 2)Draw a schematic diagram of simple vapour compression cycle and explain it
  • Ans. 

    A vapour compression cycle is a process used in refrigeration systems to remove heat from a space.

    • The cycle consists of four main components: a compressor, a condenser, an expansion valve, and an evaporator.

    • The compressor takes in low-pressure refrigerant gas and compresses it to high pressure.

    • The high-pressure gas then flows to the condenser, where it releases heat and condenses into a high-pressure liquid.

    • The liquid ...

  • Answered by AI
  • Q3. Which equipments used in pharma industries?
  • Q4. Is any breakdown come in your previous company? If any plz explain it.
  • Q5. Tell me preventive maintenance of reactor
  • Ans. 

    Preventive maintenance of a reactor involves regular inspection, cleaning, and replacement of parts to ensure safe and efficient operation.

    • Regular inspection of reactor components such as valves, pumps, and pipes

    • Cleaning of reactor surfaces to prevent buildup of contaminants

    • Replacement of worn or damaged parts to prevent equipment failure

    • Testing of safety systems to ensure proper function in case of emergency

    • Monitoring...

  • Answered by AI
  • Q6. Utility and process equipment capacity and make
  • Ans. 

    Utility and process equipment capacity and make

    • Provide details of all utility and process equipment installed in the facility

    • Include information on their capacity and make

    • Utility equipment may include HVAC, compressed air, water treatment, etc.

    • Process equipment may include reactors, distillation columns, pumps, etc.

  • Answered by AI
  • Q7. Gear box ratio
  • Q8. What is Air fuel ratio in boiler how you maintain it
  • Ans. 

    Air fuel ratio in boiler is the ratio of mass of air to mass of fuel. It is maintained by adjusting the fuel and air flow rates.

    • Air fuel ratio is critical for efficient combustion and minimizing emissions.

    • The ideal air fuel ratio for a boiler is typically between 1.5 and 2.5.

    • To maintain the air fuel ratio, the fuel and air flow rates must be adjusted based on the boiler load and combustion conditions.

    • Excess air can lea...

  • Answered by AI
  • Q9. Is any chemical treatment done in Colling tower? Which are those
  • Ans. 

    Yes, chemical treatment is done in cooling tower to prevent scaling, corrosion and biological growth.

    • Chemicals like biocides, scale inhibitors and corrosion inhibitors are added to the water in cooling tower.

    • Biocides are used to prevent the growth of bacteria, algae and fungi.

    • Scale inhibitors are used to prevent the formation of mineral deposits on the tower walls and heat exchangers.

    • Corrosion inhibitors are used to pr...

  • Answered by AI
  • Q10. Validation process
  • Q11. Hvac capacity and its motor size
  • Ans. 

    HVAC capacity and motor size are interdependent.

    • The HVAC capacity is determined by the size of the space it needs to cool or heat.

    • The motor size is determined by the HVAC capacity and the type of system being used.

    • For example, a small window AC unit may have a motor size of 1/6 horsepower, while a large central AC unit may have a motor size of 5 horsepower.

    • It is important to ensure that the motor size is appropriate fo...

  • Answered by AI
  • Q12. Types of valves draw a diagram of gate valve or ball valve
  • Ans. 

    Gate valves and ball valves are two common types of valves used in industrial applications.

    • Gate valves have a sliding gate that controls the flow of fluid through the valve.

    • Ball valves have a rotating ball with a hole in the middle that controls the flow of fluid through the valve.

    • Gate valves are typically used for on/off control of fluid flow, while ball valves are used for throttling and control applications.

    • Gate val...

  • Answered by AI
  • Q13. Do you handled any project?if yes then explain it
  • Q14. Do you done boiler passing,if yes then explain how it can be done
  • Ans. 

    Yes, I have experience in boiler passing. It involves a thorough inspection of the boiler to ensure its safe and efficient operation.

    • Boiler passing involves a visual inspection of the boiler's exterior and interior components.

    • The inspection includes checking for leaks, cracks, corrosion, and other signs of wear and tear.

    • The boiler's safety controls, valves, and gauges are also checked to ensure they are functioning pro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart to answer any question
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the AHU PM Procudere?
  • Ans. 

    AHU PM Procedure is a preventive maintenance procedure for Air Handling Units to ensure their efficient operation.

    • Regularly inspect and clean air filters to prevent blockages and maintain airflow

    • Check and tighten electrical connections to prevent malfunctions

    • Inspect and lubricate fan motors to ensure smooth operation

    • Inspect and clean coils to improve heat transfer efficiency

    • Check and calibrate sensors for accurate moni

  • Answered by AI
  • Q2. How can calculate the TR?
  • Ans. 

    TR can be calculated by dividing the total energy consumed by the system by the total energy input.

    • Calculate the total energy consumed by the system.

    • Calculate the total energy input to the system.

    • Divide the total energy consumed by the total energy input to get the TR.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Most important this Question
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I was interviewed in Sep 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. Transformer dg
  • Q2. Plc motor dol start
Round 2 - Technical 

(1 Question)

  • Q1. Transformer dg
Round 3 - HR 

(1 Question)

  • Q1. Education all company experience certificate checking
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How do you replace a mechanical seal.?
  • Ans. 

    Replacing a mechanical seal involves several steps to ensure proper installation and functionality.

    • Start by shutting down the equipment and relieving any pressure or tension.

    • Remove the old seal by carefully disassembling the components and cleaning the area.

    • Inspect the seal housing and shaft for any damage or wear.

    • Install the new seal by following the manufacturer's instructions and using the appropriate tools.

    • Ensure p...

  • Answered by AI
  • Q2. What are the two main parts of a mechanical seal..?
  • Ans. 

    The two main parts of a mechanical seal are the stationary part and the rotating part.

    • The stationary part is typically attached to the pump housing or casing.

    • The rotating part is connected to the pump shaft.

    • The stationary part contains the primary seal face, which remains fixed in position.

    • The rotating part contains the mating seal face, which rotates with the pump shaft.

    • The two seal faces come into contact to create a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My best knowledgeable my best experience grotha my live life

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Electrical single line diagram
  • Ans. 

    An electrical single line diagram is a simplified representation of an electrical power system.

    • It shows the main components of the system and their interconnections

    • It is used for planning, designing, and troubleshooting electrical systems

    • It includes information such as voltage levels, circuit breakers, transformers, and generators

    • It is a useful tool for electrical maintenance engineers to understand the system they are

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduction with confidence
  • Q2. Family details with hobbies
  • Ans. 

    I am a private person and prefer to keep my family details and hobbies private.

    • I prefer to keep my personal life separate from my professional life

    • I believe in maintaining a work-life balance

    • I am dedicated to my work and focus on professional development

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Intas Pharmaceuticals Electrical Maintenance Engineer interview:
  • Personnel Administration
Interview preparation tips for other job seekers - Introduction with full confidence and our family detail

I applied via Referral and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. 1)which refrigeration cycle used in chilling plant?
  • Ans. 

    The refrigeration cycle used in a chilling plant is typically the vapor compression cycle.

    • The vapor compression cycle involves compressing refrigerant vapor to increase its temperature and pressure.

    • The high-pressure vapor then condenses into a liquid, releasing heat.

    • The liquid refrigerant then passes through an expansion valve, reducing its pressure and temperature.

    • The low-pressure liquid then evaporates, absorbing hea...

  • Answered by AI
  • Q2. 2)Draw a schematic diagram of simple vapour compression cycle and explain it
  • Ans. 

    A vapour compression cycle is a process used in refrigeration systems to remove heat from a space.

    • The cycle consists of four main components: a compressor, a condenser, an expansion valve, and an evaporator.

    • The compressor takes in low-pressure refrigerant gas and compresses it to high pressure.

    • The high-pressure gas then flows to the condenser, where it releases heat and condenses into a high-pressure liquid.

    • The liquid ...

  • Answered by AI
  • Q3. Which equipments used in pharma industries?
  • Q4. Is any breakdown come in your previous company? If any plz explain it.
  • Q5. Tell me preventive maintenance of reactor
  • Ans. 

    Preventive maintenance of a reactor involves regular inspection, cleaning, and replacement of parts to ensure safe and efficient operation.

    • Regular inspection of reactor components such as valves, pumps, and pipes

    • Cleaning of reactor surfaces to prevent buildup of contaminants

    • Replacement of worn or damaged parts to prevent equipment failure

    • Testing of safety systems to ensure proper function in case of emergency

    • Monitoring...

  • Answered by AI
  • Q6. Utility and process equipment capacity and make
  • Ans. 

    Utility and process equipment capacity and make

    • Provide details of all utility and process equipment installed in the facility

    • Include information on their capacity and make

    • Utility equipment may include HVAC, compressed air, water treatment, etc.

    • Process equipment may include reactors, distillation columns, pumps, etc.

  • Answered by AI
  • Q7. Gear box ratio
  • Q8. What is Air fuel ratio in boiler how you maintain it
  • Ans. 

    Air fuel ratio in boiler is the ratio of mass of air to mass of fuel. It is maintained by adjusting the fuel and air flow rates.

    • Air fuel ratio is critical for efficient combustion and minimizing emissions.

    • The ideal air fuel ratio for a boiler is typically between 1.5 and 2.5.

    • To maintain the air fuel ratio, the fuel and air flow rates must be adjusted based on the boiler load and combustion conditions.

    • Excess air can lea...

  • Answered by AI
  • Q9. Is any chemical treatment done in Colling tower? Which are those
  • Ans. 

    Yes, chemical treatment is done in cooling tower to prevent scaling, corrosion and biological growth.

    • Chemicals like biocides, scale inhibitors and corrosion inhibitors are added to the water in cooling tower.

    • Biocides are used to prevent the growth of bacteria, algae and fungi.

    • Scale inhibitors are used to prevent the formation of mineral deposits on the tower walls and heat exchangers.

    • Corrosion inhibitors are used to pr...

  • Answered by AI
  • Q10. Validation process
  • Q11. Hvac capacity and its motor size
  • Ans. 

    HVAC capacity and motor size are interdependent.

    • The HVAC capacity is determined by the size of the space it needs to cool or heat.

    • The motor size is determined by the HVAC capacity and the type of system being used.

    • For example, a small window AC unit may have a motor size of 1/6 horsepower, while a large central AC unit may have a motor size of 5 horsepower.

    • It is important to ensure that the motor size is appropriate fo...

  • Answered by AI
  • Q12. Types of valves draw a diagram of gate valve or ball valve
  • Ans. 

    Gate valves and ball valves are two common types of valves used in industrial applications.

    • Gate valves have a sliding gate that controls the flow of fluid through the valve.

    • Ball valves have a rotating ball with a hole in the middle that controls the flow of fluid through the valve.

    • Gate valves are typically used for on/off control of fluid flow, while ball valves are used for throttling and control applications.

    • Gate val...

  • Answered by AI
  • Q13. Do you handled any project?if yes then explain it
  • Q14. Do you done boiler passing,if yes then explain how it can be done
  • Ans. 

    Yes, I have experience in boiler passing. It involves a thorough inspection of the boiler to ensure its safe and efficient operation.

    • Boiler passing involves a visual inspection of the boiler's exterior and interior components.

    • The inspection includes checking for leaks, cracks, corrosion, and other signs of wear and tear.

    • The boiler's safety controls, valves, and gauges are also checked to ensure they are functioning pro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart to answer any question
Round 1 - HR 

(8 Questions)

  • Q1. What are your strengths and weaknesses?
  • Q2. Tell me about yourself.
  • Q3. Where do you see yourself in 5 years?
  • Q4. Why are you looking for a change?
  • Q5. Why should we hire you?
  • Q6. Share details of your previous job.
  • Q7. What is your family background?
  • Q8. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - I have work in urility operation and electrical maintainace

I applied via Recruitment Consulltant and was interviewed in Oct 2021. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Chillar . boilers .ro .air compressor .air dry.nitroge

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical maintenance engineer

I applied via Referral and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. What is Enthalpy?
  • Ans. 

    Enthalpy is the sum of internal energy and the product of pressure and volume.

    • Enthalpy is a thermodynamic property of a system.

    • It is represented by the symbol 'H'.

    • It is defined as the sum of internal energy and the product of pressure and volume.

    • Enthalpy change is the heat absorbed or released during a chemical reaction.

    • Enthalpy is used in various fields including chemistry, physics, and engineering.

  • Answered by AI
  • Q2. Explain your job responsibilities.
  • Q3. Plz tell me difference between validation and qualifications.
  • Ans. 

    Validation ensures that a process or system meets the intended requirements, while qualification ensures that the equipment or system is installed and operates correctly.

    • Validation is focused on the process or system, while qualification is focused on the equipment or system.

    • Validation ensures that the process or system meets the intended requirements, while qualification ensures that the equipment or system is install...

  • Answered by AI
  • Q4. What is pressure differential in HVAC system.
  • Ans. 

    Pressure differential is the difference in air pressure between two points in an HVAC system.

    • It is important for maintaining proper airflow and ventilation.

    • It can be measured using a manometer.

    • A high pressure differential can indicate a clogged filter or duct.

    • A low pressure differential can indicate a malfunctioning fan or blower.

    • It is often used in cleanroom environments to prevent contamination.

  • Answered by AI
  • Q5. What are the types of pumps?
  • Ans. 

    There are several types of pumps including centrifugal, positive displacement, and axial flow pumps.

    • Centrifugal pumps use a rotating impeller to create a flow of fluid.

    • Positive displacement pumps move fluid by trapping a fixed amount and forcing it through the discharge port.

    • Axial flow pumps move fluid parallel to the pump shaft.

    • Other types of pumps include reciprocating pumps, peristaltic pumps, and jet pumps.

  • Answered by AI
  • Q6. What are the types of compressors?
  • Ans. 

    There are two main types of compressors: positive displacement and dynamic.

    • Positive displacement compressors work by trapping air in a chamber and reducing the volume of the chamber to compress the air. Examples include reciprocating, rotary screw, and rotary vane compressors.

    • Dynamic compressors work by imparting velocity to the air and then converting that velocity into pressure. Examples include centrifugal and axial...

  • Answered by AI
  • Q7. What is HVAC?
  • Ans. 

    HVAC stands for Heating, Ventilation, and Air Conditioning.

    • HVAC is a system used for regulating temperature, humidity, and air quality in buildings.

    • It includes components such as furnaces, air conditioners, ductwork, and thermostats.

    • HVAC systems can be found in residential, commercial, and industrial buildings.

    • Proper maintenance of HVAC systems is important for energy efficiency and indoor air quality.

  • Answered by AI
  • Q8. Plz draw the schematic of typical water system diagram?
  • Ans. 

    A typical water system diagram includes a water source, treatment plant, distribution network, and end-users.

    • Water source can be a river, lake, or groundwater well

    • Treatment plant removes impurities and disinfects water

    • Distribution network includes pipes, pumps, and storage tanks

    • End-users can be residential, commercial, or industrial

    • Backflow prevention devices are installed to prevent contamination

  • Answered by AI
  • Q9. What are the breakdown occurs in chillers?
  • Ans. 

    Breakdowns in chillers can be caused by various factors such as electrical issues, refrigerant leaks, and mechanical failures.

    • Electrical issues such as faulty wiring or blown fuses can cause breakdowns in chillers.

    • Refrigerant leaks can occur due to corrosion or damage to the chiller's components.

    • Mechanical failures such as worn out bearings or broken belts can also cause breakdowns in chillers.

    • Dirty or clogged filters ...

  • Answered by AI
  • Q10. Explain the efficiency of boiler.
  • Ans. 

    Boiler efficiency is the ratio of energy output to energy input.

    • Efficiency is important for reducing fuel consumption and costs.

    • Factors affecting efficiency include combustion efficiency, thermal efficiency, and fuel-to-steam efficiency.

    • Regular maintenance and cleaning can improve efficiency.

    • For example, reducing excess air can improve combustion efficiency.

    • Another example is using economizers to recover heat from flue...

  • Answered by AI
  • Q11. What are the types of seal?
  • Ans. 

    There are various types of seals used in different industries and applications.

    • Mechanical seals: used to prevent leakage between rotating and stationary parts, commonly used in pumps and compressors.

    • Hydraulic seals: used to prevent fluid leakage in hydraulic systems, commonly used in cylinders and valves.

    • O-ring seals: used to create a seal between two mating surfaces, commonly used in plumbing and automotive applicatio...

  • Answered by AI
  • Q12. Plz tell me diff types of guidelines used in pharma.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewers have deep knowledge of Maintenance breakdowns and pharmaceutical guidelines.

Raichem Medicare Interview FAQs

How many rounds are there in Raichem Medicare Maintenance Engineer interview?
Raichem Medicare interview process usually has 2 rounds. The most common rounds in the Raichem Medicare interview process are Resume Shortlist and Technical.
What are the top questions asked in Raichem Medicare Maintenance Engineer interview?

Some of the top questions asked at the Raichem Medicare Maintenance Engineer interview -

  1. What is flow and how can we calculate it in a given size of pi...read more
  2. What are the modes of heat transf...read more
  3. What is water hammering and explain...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Cipla Interview Questions
4.1
 • 476 Interviews
Apollo Hospitals Interview Questions
4.1
 • 337 Interviews
Lupin Interview Questions
4.2
 • 332 Interviews
Hetero Interview Questions
3.9
 • 198 Interviews
Biocon Limited Interview Questions
3.9
 • 149 Interviews
Max Healthcare Interview Questions
4.1
 • 132 Interviews
MSN Laboratories Interview Questions
3.8
 • 127 Interviews
View all
Raichem Medicare Maintenance Engineer Salary
based on 4 salaries
₹2.4 L/yr - ₹3.5 L/yr
28% less than the average Maintenance Engineer Salary in India
View more details

Raichem Medicare Maintenance Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

1.0

Salary

5.0

Job security

3.0

Company culture

1.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Executive
25 salaries
unlock blur

₹2.4 L/yr - ₹4.6 L/yr

Senior Executive
10 salaries
unlock blur

₹2.7 L/yr - ₹8.4 L/yr

Senior Scientific Officer
9 salaries
unlock blur

₹2.3 L/yr - ₹5.5 L/yr

Trainee
8 salaries
unlock blur

₹1.8 L/yr - ₹2.4 L/yr

Junior Scientific Officer
7 salaries
unlock blur

₹1.8 L/yr - ₹2.4 L/yr

Explore more salaries
Compare Raichem Medicare with

Apollo Hospitals

4.1
Compare

Fortis Healthcare

4.0
Compare

Max Healthcare

4.1
Compare

DRJ & CO

5.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview