i
Quality Needles
Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
A standard aptitude test containing reasoning and mental ability questions
Heat treatment can affect the machinability of materials, requiring adjustments in machining processes.
Heat treatment can cause changes in material hardness, toughness, and ductility, affecting the cutting forces and tool wear during machining.
Machining parameters such as cutting speed, feed rate, and depth of cut may need to be adjusted to compensate for the changes in material properties.
For example, a hardened steel...
Top trending discussions
posted on 17 Mar 2022
I applied via Approached by Company and was interviewed in Sep 2021. There were 2 interview rounds.
I appeared for an interview before Sep 2021.
1st angle projection is commonly used in the United States, while 3rd angle projection is more commonly used in Europe and Asia.
1st angle projection places the object in the first quadrant, with the front view on the right and the top view on top.
3rd angle projection places the object in the third quadrant, with the front view on the left and the top view on top.
1st angle projection is commonly used in the United State...
Two-stroke engines have a power stroke every revolution, while four-stroke engines have a power stroke every other revolution.
Two-stroke engines have a simpler design with fewer moving parts compared to four-stroke engines.
Two-stroke engines require a fuel-oil mixture for lubrication, while four-stroke engines have a separate oil system.
Two-stroke engines are lighter and have a higher power-to-weight ratio than four-st...
5S is a workplace organization method, Kaizen is continuous improvement, and Poka Yoke is error-proofing.
5S types refer to Sort, Set in order, Shine, Standardize, and Sustain for workplace organization.
Kaizen is a Japanese term for continuous improvement in processes and products.
Poka Yoke is a mistake-proofing technique to prevent errors in manufacturing processes.
Example: Implementing 5S in a factory to improve effic...
SQTCM stands for Software Quality Testing and Control Management. It is a process that ensures software products meet quality standards.
SQTCM involves creating test plans and test cases to ensure software functionality meets requirements
It includes conducting various types of testing such as unit testing, integration testing, and system testing
SQTCM also involves tracking defects and issues found during testing and ens
I applied via Pradeep and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Preventive maintenance involves scheduled inspections and repairs to prevent equipment failure. MTTR and MTBF are used to measure equipment reliability. PLC interlock with ladder logic ensures safe operation.
Preventive maintenance involves regular inspections and repairs to prevent equipment failure
MTTR (Mean Time to Repair) measures the average time it takes to repair equipment
MTBF (Mean Time Between Failures) measure...
posted on 14 Sep 2023
I applied via Naukri.com and was interviewed before Sep 2022. There were 3 interview rounds.
Diagrammatically Reasoning questions ask him
I applied via Job Portal and was interviewed before Dec 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Mar 2019. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Junior Engineer
27
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Engineer
18
salaries
| ₹3.8 L/yr - ₹7.4 L/yr |
Senior Engineer
13
salaries
| ₹6 L/yr - ₹12 L/yr |
Deputy Manager
12
salaries
| ₹8.8 L/yr - ₹14.5 L/yr |
Production Engineer
10
salaries
| ₹4.2 L/yr - ₹7.3 L/yr |
Becton Dickinson
Romsons Group Of Industries
Essilor
SMC Corporation