Upload Button Icon Add office photos

Filter interviews by

PVR Constructions Site Engineer Interview Questions and Answers

Updated 18 Apr 2022

PVR Constructions Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Apr 2022

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What weight of cement ,steel ?
  • Ans. 

    The weight of cement and steel required depends on the project specifications and design.

    • The weight of cement and steel needed varies based on the size and scope of the project.

    • The type of cement and steel used also affects the weight required.

    • The design and structural requirements of the project determine the amount of cement and steel needed.

    • Calculations are done by the structural engineer to determine the exact weig

  • Answered by AI
  • Q2. Calculate the concrete?
  • Ans. 

    Calculating concrete involves determining the amount of materials needed for a specific project.

    • Determine the volume of concrete needed

    • Calculate the amount of cement, sand, and aggregate required

    • Consider the water-cement ratio

    • Factor in any additives or admixtures

    • Account for waste and spillage

  • Answered by AI
  • Q3. Read plan of giving?
  • Ans. 

    The plan of giving refers to a detailed outline of how donations or contributions will be collected and distributed.

    • The plan should include specific goals and objectives for the giving campaign.

    • It should outline the target audience and how they will be reached.

    • The plan should also detail the types of donations that will be accepted and how they will be collected.

    • It should include a budget and timeline for the campaign.

    • ...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good for knowledge and know the civil work related questions

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Experience, previous salary, previous co. Name, total Experience letter, salary slip and discuss for location
Round 2 - Case Study 

Kis co. Me kya kya kaam kiya

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl

I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All site work procedures All material, Activity Quantity, Boq and Reconciliation

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview confidently...
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Hello what is your name
  • Q2. How much salary you want
Round 2 - HR 

(2 Questions)

  • Q1. Lets discuss about money
  • Q2. Where do you want to go
Round 3 - HR 

(2 Questions)

  • Q1. Where do you from
  • Q2. Are you interested to work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked My previous projects details
  • Q2. I'm telling all answers

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical it lasted for about 30 minute's. Most of questions asked to me were related to my previous projects

PVR Constructions Interview FAQs

How many rounds are there in PVR Constructions Site Engineer interview?
PVR Constructions interview process usually has 3 rounds. The most common rounds in the PVR Constructions interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in PVR Constructions Site Engineer interview?

Some of the top questions asked at the PVR Constructions Site Engineer interview -

  1. What weight of cement ,stee...read more
  2. Calculate the concre...read more
  3. Read plan of givi...read more

Tell us how to improve this page.

PVR Constructions Site Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

4.2

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

4.2

Work Satisfaction

Explore 2 Reviews and Ratings
Civil Site Engineer
9 salaries
unlock blur

₹1.9 L/yr - ₹3.6 L/yr

Senior Electrical Engineer
6 salaries
unlock blur

₹3.6 L/yr - ₹5.6 L/yr

Project Manager
5 salaries
unlock blur

₹7.8 L/yr - ₹22 L/yr

Project Engineer
4 salaries
unlock blur

₹2 L/yr - ₹5.1 L/yr

Electrical Site Engineer
4 salaries
unlock blur

₹1.4 L/yr - ₹4.4 L/yr

Explore more salaries
Compare PVR Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview