DPR (Daily Progress Report) can be prepared by collecting daily updates, analyzing progress against plan, and documenting any issues or delays.
Collect daily updates from site engineers and subcontractors
Analyze progress against the planned schedule to identify any deviations
Document any issues or delays encountered during the day
Include details of work completed, work planned for the next day, and any resources/ma...
Progress Measurement System is a method used to track and monitor the progress of a project by measuring completed work against planned work.
It involves setting up a baseline schedule to compare actual progress against
Progress is measured using various methods such as Earned Value Management (EVM) or milestone tracking
It helps in identifying delays, deviations, and areas of improvement in the project
Regular progre...
MPR stands for Monthly Progress Report. It is a document prepared by the Planning Engineer to track and report the progress of a project on a monthly basis.
Gather data on project progress, including completed activities, milestones achieved, and any delays or issues encountered.
Update the project schedule with actual progress and analyze any deviations from the baseline schedule.
Include a summary of key performanc...
Planning in Primavera involves creating a project schedule, assigning resources, and tracking progress.
Create a Work Breakdown Structure (WBS)
Define activities and their dependencies
Assign resources and durations
Set baselines and track progress
Use filters and reports to analyze data
Update the schedule regularly
Use risk management techniques
Integrate with other software tools
Train team members on Primavera
Follow in...
A baseline schedule is the original project schedule that is used as a reference point for measuring progress and performance.
It is the approved version of the project schedule
It includes the planned start and end dates for each activity
It serves as a benchmark for measuring project performance
Changes to the baseline schedule must be approved through a formal change control process
It is used to compare actual prog...
Carpet area is the actual usable area of a flat, built-up area includes carpet area plus thickness of walls, super built-up area includes built-up area plus common areas.
Carpet area is the area within the walls of a flat that can be used for living purposes.
Built-up area includes carpet area plus the thickness of walls.
Super built-up area includes built-up area plus common areas like lobby, staircase, etc.
Carpet a...
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
To prepare a schedule in P6, start by defining project activities, assigning resources, setting durations, and establishing dependencies.
Define project activities with start and finish dates
Assign resources to each activity
Set durations for each activity
Establish dependencies between activities
Review and adjust the schedule as needed
Progress Measurement System is a method used to track and monitor the progress of a project by measuring completed work against planned work.
It involves setting up a baseline schedule to compare actual progress against
Progress is measured using various methods such as Earned Value Management (EVM) or milestone tracking
It helps in identifying delays, deviations, and areas of improvement in the project
Regular progress re...
Baseline schedule is the original project schedule against which actual progress is measured.
Baseline schedule is the initial approved project schedule.
It serves as a reference point for comparing actual progress and performance.
Any changes to the baseline schedule require formal approval and documentation.
It includes key milestones, deliverables, and timelines.
Example: If a project is scheduled to be completed in 6 mo...
MPR stands for Monthly Progress Report. It is a document prepared by the Planning Engineer to track and report the progress of a project on a monthly basis.
Gather data on project progress, including completed activities, milestones achieved, and any delays or issues encountered.
Update the project schedule with actual progress and analyze any deviations from the baseline schedule.
Include a summary of key performance ind...
DPR (Daily Progress Report) can be prepared by collecting daily updates, analyzing progress against plan, and documenting any issues or delays.
Collect daily updates from site engineers and subcontractors
Analyze progress against the planned schedule to identify any deviations
Document any issues or delays encountered during the day
Include details of work completed, work planned for the next day, and any resources/materia...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2020. There were 3 interview rounds.
A baseline schedule is the original project schedule that is used as a reference point for measuring progress and performance.
It is the approved version of the project schedule
It includes the planned start and end dates for each activity
It serves as a benchmark for measuring project performance
Changes to the baseline schedule must be approved through a formal change control process
It is used to compare actual progress ...
Planning in Primavera involves creating a project schedule, assigning resources, and tracking progress.
Create a Work Breakdown Structure (WBS)
Define activities and their dependencies
Assign resources and durations
Set baselines and track progress
Use filters and reports to analyze data
Update the schedule regularly
Use risk management techniques
Integrate with other software tools
Train team members on Primavera
Follow industr...
I applied via Naukri.com and was interviewed in Jun 2019. There was 1 interview round.
Carpet area is the actual usable area of a flat, built-up area includes carpet area plus thickness of walls, super built-up area includes built-up area plus common areas.
Carpet area is the area within the walls of a flat that can be used for living purposes.
Built-up area includes carpet area plus the thickness of walls.
Super built-up area includes built-up area plus common areas like lobby, staircase, etc.
Carpet area i...
Top trending discussions
I applied via Referral and was interviewed before Feb 2020. There were 3 interview rounds.
Yes, I have experience in handling multi-dimensional assignments.
I have previously managed a team with diverse skill sets and responsibilities.
I am comfortable with delegating tasks and ensuring timely completion.
I have a strong understanding of project management and resource allocation.
I am adept at prioritizing tasks and managing multiple projects simultaneously.
posted on 24 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 12 Oct 2021
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
based on 3 interview experiences
Difficulty level
Duration
based on 55 reviews
Rating in categories
Planning Engineer
27
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Planning Engineer
14
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Cost and Planning Engineer
13
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Management Trainee
11
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Project Control Manager
7
salaries
| ₹15 L/yr - ₹18.6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim