Filter interviews by
Be the first one to contribute and help others!
I applied via Recruitment Consulltant and was interviewed before May 2017. There was 1 interview round.
I applied via Walk-in and was interviewed before Mar 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jan 2019. There were 2 interview rounds.
posted on 27 Mar 2021
Yes, it is important to document all plant parameters for quality control and process improvement.
Documenting plant parameters helps in identifying deviations from standard operating procedures.
It helps in analyzing trends and patterns in the production process.
It aids in making informed decisions for process improvement and optimization.
Examples of plant parameters include temperature, humidity, pressure, flow rate, a
The question is asking for all the parameters and processes involved in the paint treatment process.
Parameters may include temperature, pressure, and chemical concentrations
Processes may include cleaning, priming, painting, and curing
Each parameter and process must be carefully monitored and controlled to ensure quality
Regular maintenance and calibration of equipment is necessary for consistent results
Powder coating parameters process involves setting up the correct temperature, time, and voltage for the powder coating application.
Temperature should be set according to the type of powder being used
Time should be adjusted based on the thickness of the coating required
Voltage should be set to ensure proper adhesion of the powder to the substrate
Other factors such as humidity and airflow should also be considered
Regula...
My current job responsibilities include leading the development of new products, conducting research and analysis, collaborating with cross-functional teams, and ensuring project timelines are met.
Leading the development of new products
Conducting research and analysis
Collaborating with cross-functional teams
Ensuring project timelines are met
I identify the root cause, collaborate with team members, develop a solution, and implement corrective actions.
Identify the root cause of the issue
Collaborate with team members to brainstorm solutions
Develop a plan of action to address the issue
Implement corrective actions to resolve the issue
Monitor the effectiveness of the solution and make adjustments as needed
I applied via Naukri.com and was interviewed before May 2018. There were 4 interview rounds.
posted on 20 Apr 2021
I was interviewed in Mar 2021.
A control chart is a statistical tool used to monitor and control a process over time.
It helps to identify and analyze variations in a process.
It consists of a central line representing the average value and upper and lower control limits.
Data points falling outside the control limits indicate special causes of variation.
Common types of control charts include X-bar and R charts, X-bar and S charts, and p charts.
Control...
The principle of vernier caliper is based on the concept of vernier scale and the ability to measure small distances accurately.
Vernier caliper is a measuring instrument used to measure the dimensions of an object with high precision.
It consists of a main scale and a sliding vernier scale, which allows for more accurate measurements.
The principle behind vernier caliper is that the vernier scale has a smaller division t...
The number of angles of projection in a drawing depends on the specific requirements and complexity of the object being depicted.
The number of angles of projection can vary depending on the purpose of the drawing.
Common angles of projection include front view, top view, side view, and isometric view.
Additional angles may be required for complex objects or to show specific details.
The number of angles can also depend on...
The angle of projection drawing should be prepared in the third angle projection.
The third angle projection is commonly used in engineering and technical drawings.
In third angle projection, the object is placed in the third quadrant of the orthographic projection.
The top view is placed above the front view, and the right side view is placed to the right of the front view.
This method is widely adopted in many countries ...
I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.
The full form of A.C. current is Alternating Current.
A.C. current stands for Alternating Current.
It is a type of electric current that periodically reverses direction.
It is commonly used in household electrical systems and power grids.
Unlike direct current (D.C.), A.C. current can easily be transformed to different voltage levels.
Examples of A.C. current include the electricity supplied by utility companies and the pow
The full form of D.C. current is Direct Current.
D.C. stands for Direct Current.
It is a type of electrical current that flows in one direction only.
It is commonly used in batteries and electronic devices.
The opposite of D.C. current is A.C. current, which alternates direction.
D.C. current is measured in amperes (A).
based on 7 reviews
Rating in categories
Junior Engineer
9
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Production Supervisor
7
salaries
| ₹2.2 L/yr - ₹3.3 L/yr |
Production Engineer
5
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Supervisor
4
salaries
| ₹1.8 L/yr - ₹2.6 L/yr |
Operator
4
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
Bosch
JBM Group
Samvardhana Motherson Group
Subros