Upload Button Icon Add office photos

Filter interviews by

Priserve Infrastructure Mechanical Maintenance Technician Interview Questions and Answers

Updated 27 Jan 2025

Priserve Infrastructure Mechanical Maintenance Technician Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - HR 

(1 Question)

  • Q1. For nonmetals pipe and fittings matalic other work fitting work knowledge

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Question regarding related to job profile

Interview Preparation Tips

Topics to prepare for ASSA ABLOY Senior Technician interview:
  • Personal details
  • Technical Services
Interview preparation tips for other job seekers - Be positive and go to the point as you are applicable for the job and post
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the current carrying capacity of 185sqmm al cable .
  • Ans. 

    The current carrying capacity of a 185sqmm al cable depends on various factors such as the material, insulation, and installation method.

    • The current carrying capacity of a cable is typically determined by the manufacturer and specified in the cable's datasheet.

    • Factors such as the material (aluminum in this case), insulation type, ambient temperature, and installation method all affect the current carrying capacity.

    • For ...

  • Answered by AI
  • Q2. What is the Height of db location on wall.
  • Ans. 

    The height of a dB location on a wall depends on the specific requirements of the project or application.

    • The height of a dB location on a wall is typically determined by the specific needs of the project or application.

    • Factors such as the type of equipment being installed, the purpose of the dB location, and the layout of the space will influence the height chosen.

    • For example, in a control room setting, dB locations ma...

  • Answered by AI

I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Field of your work
  • Ans. 

    I work in the field of software engineering.

    • Developing and maintaining software applications

    • Designing and implementing software solutions

    • Collaborating with cross-functional teams

    • Troubleshooting and debugging software issues

    • Ensuring code quality and adherence to best practices

  • Answered by AI
  • Q2. What about your work
  • Q3. Complete plumbing and firefighting work including STP,WTP,S.POOL, and external sewerage system and storm water and firefighting work and water supply too
  • Q4. Tell about pipes you used at project
  • Q5. GI in water supply and ci ln soil and waste, glazed stoneware in external sewerage system and RCC in storm water,MS in firefighting

Interview Preparation Tips

Interview preparation tips for other job seekers - Well and good

I appeared for an interview in Jun 2019.

Interview Questionnaire 

1 Question

  • Q1. Regarding my work experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - One should have good knowledge of Civil Procedure Court.
Experience in real estate sector is a big plus.
RERA matters as well as contract drafting
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What are the step in Sales process
  • Ans. 

    The steps in the sales process include prospecting, qualifying, presenting, handling objections, closing, and follow-up.

    • Prospecting: Identifying potential customers or leads.

    • Qualifying: Determining if the prospect is a good fit for the product or service.

    • Presenting: Demonstrating the features and benefits of the product or service.

    • Handling objections: Addressing any concerns or doubts the prospect may have.

    • Closing: Ask...

  • Answered by AI
  • Q2. How do you convince the people to buy your product
  • Ans. 

    By highlighting the benefits, addressing concerns, providing evidence of quality, and offering incentives.

    • Highlight the unique benefits of the product

    • Address any concerns or objections the customer may have

    • Provide evidence of the quality and effectiveness of the product

    • Offer incentives such as discounts or promotions to encourage purchase

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Tell me about yourself
  • Q2. Job descriptionbriefly
  • Q3. Structure related questions

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. About Billing Procedure
  • Q2. About Checklist
  • Q3. About IS Code related to Billing and QS
  • Q4. About BBS of reinforcement
  • Q5. About Previous Companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Structure and Finishing Fundamental knowledge should be clear et every stage

Priserve Infrastructure Interview FAQs

How many rounds are there in Priserve Infrastructure Mechanical Maintenance Technician interview?
Priserve Infrastructure interview process usually has 1 rounds. The most common rounds in the Priserve Infrastructure interview process are HR.

Tell us how to improve this page.

Priserve Infrastructure Mechanical Maintenance Technician Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sunteck Realty Interview Questions
3.3
 • 23 Interviews
Pittie Group Interview Questions
2.7
 • 17 Interviews
ASSA ABLOY Interview Questions
3.5
 • 17 Interviews
Ambience Group Interview Questions
3.3
 • 16 Interviews
Alpha Corp Interview Questions
4.4
 • 14 Interviews
Pin Click Interview Questions
3.2
 • 12 Interviews
Maxinfra Interview Questions
4.2
 • 11 Interviews
View all
Plant Operator
12 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

HR Executive
11 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Project Engineer
7 salaries
unlock blur

₹2.1 L/yr - ₹3.5 L/yr

Electrical Engineer
5 salaries
unlock blur

₹5 L/yr - ₹5.6 L/yr

Mechanical Engineer
5 salaries
unlock blur

₹4.2 L/yr - ₹6.8 L/yr

Explore more salaries
Compare Priserve Infrastructure with

Signature Global

4.0
Compare

Sunteck Realty

3.3
Compare

Pittie Group

2.7
Compare

Pin Click

3.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview