Filter interviews by
Slump cone test is a method to measure the workability of concrete.
It involves filling a slump cone with freshly mixed concrete, then lifting the cone to see how much the concrete slumps or settles.
The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.
The test helps ensure the concrete is of the right consistency for proper placement and compaction.
The results of the t...
I applied via Referral and was interviewed in Mar 2023. There were 4 interview rounds.
I appeared for an interview in Feb 2023.
Different types of concrete tests include compressive strength test, slump test, air content test, and moisture content test.
Compressive strength test measures the ability of concrete to withstand loads.
Slump test measures the consistency and workability of concrete.
Air content test measures the amount of air trapped in concrete.
Moisture content test measures the amount of moisture present in concrete.
Other tests inclu...
The slums test is a method used to assess the quality of audit evidence by examining the lowest level of documentation.
The slums test involves reviewing the most basic and fundamental documents to ensure accuracy and reliability.
It is important because it helps auditors verify the authenticity of financial records and detect any potential errors or fraud.
Examples of documents that may be included in the slums test are ...
Non destructive testing methods in civil engineering are used to evaluate the properties of materials without causing damage.
Ultrasonic testing - uses high frequency sound waves to detect internal flaws in materials
Radiographic testing - uses X-rays or gamma rays to inspect the internal structure of materials
Magnetic particle testing - detects surface and near-surface flaws in ferromagnetic materials
Liquid penetrant te...
Quality control on a construction site is ensured through regular inspections, testing of materials, adherence to specifications, and proper documentation.
Regular inspections of workmanship and materials to ensure compliance with specifications
Testing of materials for quality and durability
Adherence to construction plans and specifications
Proper documentation of all processes and inspections
Training and supervision of ...
Quality of concrete at a construction site can be checked through various methods including visual inspection, slump test, compressive strength test, and moisture content test.
Visual inspection for any cracks, honeycombing, or segregation in the concrete
Slump test to measure the consistency and workability of the concrete mix
Compressive strength test to determine the strength of the concrete
Moisture content test to ens
Principle ACS Engineering India interview questions for popular designations
I applied via Approached by Company and was interviewed in Sep 2021. There were 2 interview rounds.
The codes used in tower design include ASCE 7, AISC 360, ACI 318, and IBC.
ASCE 7 - Minimum Design Loads for Buildings and Other Structures
AISC 360 - Specification for Structural Steel Buildings
ACI 318 - Building Code Requirements for Structural Concrete
IBC - International Building Code
Structural design engineers use various codes for drafting and detailing.
Structural design codes include ACI, AISC, ASCE, and IBC.
ACI (American Concrete Institute) provides guidelines for concrete design.
AISC (American Institute of Steel Construction) provides guidelines for steel design.
ASCE (American Society of Civil Engineers) provides guidelines for general structural design.
IBC (International Building Code) provid...
Wind gust is a sudden increase in wind speed. 3-second gust and 5-second gust are the maximum wind speeds measured over a 3-second and 5-second period, respectively.
Wind gust is a rapid fluctuation in wind speed that lasts for a short duration.
It is caused by sudden changes in atmospheric pressure or wind direction.
3-second gust and 5-second gust are the maximum wind speeds measured over a 3-second and 5-second period,...
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 2 Aug 2024
Concurrency problem occurs when multiple threads access shared resources simultaneously, leading to unexpected behavior.
Use synchronization mechanisms like locks, semaphores, or monitors to control access to shared resources.
Avoid race conditions by ensuring that critical sections of code are executed atomically.
Consider using thread-safe data structures or immutable objects to minimize the risk of concurrency issues.
posted on 15 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 3 interview rounds.
Strings and array concepts
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
Some of the top questions asked at the Principle ACS Engineering India interview -
based on 5 interviews
Interview experience
based on 47 reviews
Rating in categories
Junior Engineer
15
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Design Engineer
13
salaries
| ₹2.8 L/yr - ₹7 L/yr |
Cluster Engineer
9
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Junior Engineer Civil
9
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Quality Engineer
8
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
GAMMON INDIA
Karam Industries
Saudi Oger
Ray Engineering