Filter interviews by
I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 4 interview rounds.
He take aptitude test.
Top trending discussions
I was interviewed in Jan 2024.
Yes, I have prepared CAPA (Corrective and Preventive Action) reports in my previous roles.
Yes, I have prepared CAPA reports to address quality issues and prevent their recurrence.
I have experience in conducting root cause analysis to identify the underlying issues.
I have implemented corrective actions to address immediate concerns and preventive actions to avoid future issues.
I have also monitored the effectiveness of
APQP stands for Advanced Product Quality Planning. It is a structured method for defining and establishing the steps necessary to ensure that a product satisfies the customer.
APQP is a quality framework used in the automotive industry to ensure that products meet customer requirements.
It involves a series of phases including planning, product design and development, process design and development, product and process v...
7QC Tools are a set of tools used for quality control and improvement in manufacturing processes.
Check Sheet: Used to collect and analyze data, such as defects in a product.
Histogram: Shows the frequency distribution of a set of data.
Pareto Chart: Helps identify the most significant factors contributing to a problem.
Cause and Effect Diagram (Fishbone Diagram): Used to identify and analyze potential causes of a problem.
...
PPAP documents include documents like control plan, FMEA, measurement system analysis, etc.
Control Plan
FMEA (Failure Mode and Effects Analysis)
Measurement System Analysis
Part Submission Warrant
Process Flow Diagram
Appearance Approval Report
Acceptance criteria for SPC&MSA involves setting specific requirements for statistical process control and measurement system analysis.
Acceptance criteria for SPC should include specifications for control limits, process stability, and capability indices.
Acceptance criteria for MSA should include requirements for bias, linearity, stability, repeatability, and reproducibility.
Examples of acceptance criteria for SPC coul...
Severity in PFMEA is declared based on the potential impact of a failure mode on the overall process or product.
Severity is typically rated on a scale from 1 to 10, with 1 being the least severe and 10 being the most severe.
Consider the consequences of a failure mode on customer safety, regulatory compliance, product functionality, and overall process performance.
Examples of high severity failure modes include those th...
posted on 25 Jun 2022
I applied via Referral and was interviewed before Jun 2021. There were 3 interview rounds.
posted on 15 Dec 2022
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
Yes, I have similar work experience as required by the client.
I have worked as a Quality Engineer for the past 5 years.
I have experience in conducting quality audits and inspections.
I have implemented quality control processes and procedures.
I have worked with cross-functional teams to identify and resolve quality issues.
I have experience in using quality tools and techniques such as Six Sigma and Lean methodologies.
I ...
To confirm the proper vertical alignment of Tubewell pipe lowering, measurements and visual inspections can be conducted.
Measure the verticality of the pipe using a plumb bob or laser level.
Inspect the pipe for any visible signs of misalignment or tilting.
Compare the measurements and visual observations with the specified tolerances.
Ensure that the pipe is securely anchored to prevent any movement or deviation from the...
A Single village scheme consists of various components aimed at improving the quality of life in a single village.
Infrastructure development
Access to clean water and sanitation facilities
Education and skill development
Healthcare facilities
Livelihood opportunities
Social welfare programs
Community empowerment
There are several types of pipes used in water supply projects, including PVC, HDPE, copper, galvanized steel, and PEX.
PVC pipes are commonly used due to their affordability, durability, and resistance to corrosion.
HDPE pipes are known for their flexibility, high strength, and resistance to chemicals.
Copper pipes are often used for indoor plumbing due to their excellent heat and corrosion resistance.
Galvanized steel pi...
My approach to project management strategy is to prioritize clear communication, establish realistic goals, and continuously monitor progress.
Prioritize clear and effective communication with all stakeholders
Establish realistic and achievable goals and milestones
Continuously monitor project progress and make necessary adjustments
Implement quality control measures to ensure adherence to standards
Regularly assess risks a...
Yes, I have experience in project monitoring and inspection of water supply projects.
I have worked on multiple water supply projects where I was responsible for monitoring and inspecting the quality of the water supply.
I have conducted regular inspections to ensure compliance with quality standards and regulations.
I have implemented quality control measures to identify and address any issues or deficiencies in the wate...
Yes
Yes, I am familiar with preparing checklists for every component of an item to be executed as per the RFP.
I understand the importance of having a comprehensive checklist to ensure all requirements are met.
I have experience in creating checklists for quality control processes and inspections.
I am proficient in identifying critical components and their associated requirements.
I can prioritize checklist items based on ...
Yes, I have experience with liaising with government clients.
I have successfully managed relationships with government clients in my previous role as a Quality Engineer.
I am familiar with the protocols and procedures involved in working with government clients.
I have effectively communicated and coordinated with government agencies to ensure compliance and quality standards.
I have experience in navigating the bureaucra...
posted on 8 May 2024
I was interviewed in Jan 2024.
Yes, I have prepared CAPA (Corrective and Preventive Action) reports in my previous roles.
Yes, I have prepared CAPA reports to address quality issues and prevent their recurrence.
I have experience in conducting root cause analysis to identify the underlying issues.
I have implemented corrective actions to address immediate concerns and preventive actions to avoid future issues.
I have also monitored the effectiveness of
APQP stands for Advanced Product Quality Planning. It is a structured method for defining and establishing the steps necessary to ensure that a product satisfies the customer.
APQP is a quality framework used in the automotive industry to ensure that products meet customer requirements.
It involves a series of phases including planning, product design and development, process design and development, product and process v...
7QC Tools are a set of tools used for quality control and improvement in manufacturing processes.
Check Sheet: Used to collect and analyze data, such as defects in a product.
Histogram: Shows the frequency distribution of a set of data.
Pareto Chart: Helps identify the most significant factors contributing to a problem.
Cause and Effect Diagram (Fishbone Diagram): Used to identify and analyze potential causes of a problem.
...
PPAP documents include documents like control plan, FMEA, measurement system analysis, etc.
Control Plan
FMEA (Failure Mode and Effects Analysis)
Measurement System Analysis
Part Submission Warrant
Process Flow Diagram
Appearance Approval Report
Acceptance criteria for SPC&MSA involves setting specific requirements for statistical process control and measurement system analysis.
Acceptance criteria for SPC should include specifications for control limits, process stability, and capability indices.
Acceptance criteria for MSA should include requirements for bias, linearity, stability, repeatability, and reproducibility.
Examples of acceptance criteria for SPC coul...
Severity in PFMEA is declared based on the potential impact of a failure mode on the overall process or product.
Severity is typically rated on a scale from 1 to 10, with 1 being the least severe and 10 being the most severe.
Consider the consequences of a failure mode on customer safety, regulatory compliance, product functionality, and overall process performance.
Examples of high severity failure modes include those th...
posted on 25 Jun 2022
I applied via Referral and was interviewed before Jun 2021. There were 3 interview rounds.
based on 6 reviews
Rating in categories
Quality Engineer
22
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Production Engineer
13
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
System Engineer
8
salaries
| ₹2.1 L/yr - ₹3.5 L/yr |
Design Engineer
7
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Accountant
7
salaries
| ₹1.1 L/yr - ₹3 L/yr |
Tech Mahindra
HCLTech
TCS
Wipro