Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Prasa Infocom Power Solution Team. If you also belong to the team, you can get access from here

Prasa Infocom Power Solution Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Prasa Infocom Power Solution Project Engineer Interview Questions and Answers

Updated 13 Sep 2022

Prasa Infocom Power Solution Project Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary and past experience
Round 3 - Technical 

(2 Questions)

  • Q1. What do you know about data centre
  • Ans. 

    A data centre is a facility used to house computer systems and associated components.

    • Data centres are designed to provide secure and reliable access to data and applications.

    • They typically have backup power supplies, cooling systems, and redundant data communication connections.

    • Data centres can be owned and operated by a single organization or shared among multiple organizations.

    • Examples of companies that operate data ...

  • Answered by AI
  • Q2. What PAC and UPS,IBMS, Detailed questions of IBMS, Electrical panels

Interview Preparation Tips

Topics to prepare for Prasa Infocom Power Solution Project Engineer interview:
  • Free course Schneider data cent
Interview preparation tips for other job seekers - Just focuus on IBMS , ups, and pac working and basic troubleshooting

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What work of project engineer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Aptitude test going to do technically skilled and duration 30 minutes

Round 3 - Technical 

(2 Questions)

  • Q1. Technically oriented configuring and integrate commissioning installation, triggering.
  • Q2. Switching and routing firewall related load balancer server ibm,cisco,dell and hp
Round 4 - HR 

(1 Question)

  • Q1. Salary related questions asking

Interview Preparation Tips

Interview preparation tips for other job seekers - go to interview neatly dressing and confident, bold and clearly your answer need to be understand the interviewer.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

It was about telecom

Round 2 - One-on-one 

(1 Question)

  • Q1. Self introduction
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1m3 concrete use cement
  • Q2. 1sqm2 plaster use cement kg

I applied via Referral and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What do you know about telecomm
  • Ans. 

    Telecomm refers to the transmission of information over long distances using electronic means.

    • Telecomm stands for telecommunications.

    • It involves the transmission of voice, data, and video over long distances.

    • Telecomm technologies include telephone networks, internet, satellite communication, etc.

    • It enables communication between individuals, businesses, and organizations across the globe.

    • Examples of telecomm companies i

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - besic things are clear. some protocol releated knowledge , 2G,4G , network basic concept study.

Skills evaluated in this interview

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Describe lte architecture
  • Ans. 

    LTE architecture is a network of various components that work together to provide high-speed wireless communication.

    • The architecture consists of User Equipment (UE), Evolved NodeB (eNodeB), Mobility Management Entity (MME), Serving Gateway (SGW), Packet Data Network Gateway (PGW), and Home Subscriber Server (HSS).

    • UE is the device used by the user to access the network.

    • eNodeB is the base station that communicates with t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Better to get knowledge about 2g 3g 4g 5g and microwave link like Huawei Ericsson and nec

Interview Questionnaire 

1 Question

  • Q1. They are asking for my previous experience details & FTTH,NLD,MT, related questions

Interview Questionnaire 

23 Questions

  • Q1. Bill of material of 1 KM 11 KV line
  • Ans. 

    The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.

    • Conductors: Copper or aluminum cables used to transmit electricity.

    • Insulators: Materials like porcelain or polymer used to support and isolate the conductors.

    • Transformers: Devices used to step up or step down the voltage.

    • Poles: Structures to support the conductors and maintain their position.

    • Ot...

  • Answered by AI
  • Q2. Bill of material of 1 KM AB cable line
  • Ans. 

    The bill of material for a 1 KM AB cable line includes various components.

    • The cable itself

    • Insulators

    • Connectors

    • Poles or towers

    • Grounding equipment

    • Hardware such as bolts and clamps

    • Tools for installation

    • Safety equipment

    • Transportation costs

    • Labor costs

  • Answered by AI
  • Q3. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
  • Ans. 

    The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.

    • The bill of material should include all necessary components for the underground line.

    • Components may include cables, transformers, switchgear, and other electrical equipment.

    • The quantity of each component should be specified in the bill of material.

    • The bill of material should also include any necessary accessories such as clamps, connectors,

  • Answered by AI
  • Q4. Testing commissioning of RMU ,relay setting
  • Ans. 

    Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.

    • Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.

    • Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.

    • Testing and commissioning should be carried out in accordance with relevant standards an...

  • Answered by AI
  • Q5. Transformer earthing
  • Q6. What is lightning arrestor
  • Ans. 

    A lightning arrestor is a device used to protect electrical equipment from lightning strikes.

    • It is also known as a surge arrester or lightning diverter.

    • It works by providing a low-impedance path for lightning current to flow to the ground.

    • It is commonly used in power distribution systems, telecommunication networks, and buildings.

    • Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.

  • Answered by AI
  • Q7. Soil conductivity test
  • Q8. Transformer testing
  • Q9. ACSR conductor testing ABC testing Pannel testing Structure testing
  • Q10. Earthing Earthing of transformer Earthing of lightning arrester Earthing of sub station Earthing of single pole Earthing of pannels
  • Q11. What is discharge rods
  • Ans. 

    Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.

    • Also known as grounding rods or earthing rods

    • Typically made of copper or aluminum

    • Used in industries such as oil and gas, chemical, and manufacturing

    • Prevents damage to equipment and potential safety hazards

    • Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.

  • Answered by AI
  • Q12. Size of conductors Size of cables
  • Ans. 

    The size of conductors and cables is an important factor in determining their electrical properties and performance.

    • The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.

    • Cable size is determined by the current it needs to carry and the distance it needs to travel.

    • Larger conductors and cables can carry more current and have lower resistance, but may...

  • Answered by AI
  • Q13. What is GTP What is MQP What is FQP
  • Ans. 

    GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.

    • GTP stands for GPRS Tunnelling Protocol

    • It is used in cellular communication to allow data transfer between different networks

    • MQP and FQP are not commonly used acronyms and may refer to specific organizations or products

  • Answered by AI
  • Q14. Transformer oil testing
  • Q15. Cable insulation testing Continuity testing High pot test
  • Q16. What is HDD machine
  • Ans. 

    HDD machine is a drilling machine used for horizontal directional drilling.

    • HDD stands for Horizontal Directional Drilling

    • It is used for underground drilling without disturbing the surface

    • It is commonly used for laying pipelines, cables, and conduits

    • The machine uses a drill stem and a drilling fluid to bore through the ground

    • It requires skilled operators and engineers to operate and plan the drilling process

  • Answered by AI
  • Q17. PSC pole STP pole RS joist pole Rail pole
  • Q18. HDPE PIPE GI PIPE PLB duct
  • Q19. Chemical earthing Electrical earthing
  • Q20. Jointing of cables Jointing of conductors
  • Ans. 

    Jointing of cables and conductors is a crucial aspect of project engineering.

    • Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.

    • Various methods of jointing include crimping, soldering, and welding.

    • Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.

    • Proper insulation and sealing of joints is essential to p...

  • Answered by AI
  • Q21. Tell me about yourself
  • Ans. 

    Experienced project engineer with a background in civil engineering and a passion for problem-solving and team collaboration.

    • Bachelor's degree in Civil Engineering

    • 5+ years of experience in project management

    • Proficient in AutoCAD and project management software

    • Strong communication and leadership skills

    • Successfully led a team in completing a major infrastructure project on time and within budget

  • Answered by AI
  • Q22. Previous company and project details
  • Q23. Salary discussion

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Oprical fiber

Interview Preparation Tips

Interview preparation tips for other job seekers - All question od OFC project , Rout survey, ROW solve, T&D (HDD, OT) ,blowing ,spliceing,chamber & Rout markar installation,Rout AT, and all rout document part

Prasa Infocom Power Solution Interview FAQs

How many rounds are there in Prasa Infocom Power Solution Project Engineer interview?
Prasa Infocom Power Solution interview process usually has 3 rounds. The most common rounds in the Prasa Infocom Power Solution interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Prasa Infocom Power Solution Project Engineer interview?

Some of the top questions asked at the Prasa Infocom Power Solution Project Engineer interview -

  1. What do you know about data cen...read more
  2. What PAC and UPS,IBMS, Detailed questions of IBMS, Electrical pan...read more

Tell us how to improve this page.

Prasa Infocom Power Solution Project Engineer Salary
based on 5 salaries
₹3 L/yr - ₹5 L/yr
26% less than the average Project Engineer Salary in India
View more details
Service Engineer
6 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Project Engineer
5 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Shift Engineer
5 salaries
unlock blur

₹2.5 L/yr - ₹3.6 L/yr

Business Development Executive
5 salaries
unlock blur

₹3 L/yr - ₹4.1 L/yr

UPS Service Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹2.9 L/yr

Explore more salaries
Compare Prasa Infocom Power Solution with

Sterlite Power

4.0
Compare

Tata Power

3.9
Compare

Adani Power

3.9
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview