i
Praneeth Group
Filter interviews by
I applied via Walk-in and was interviewed in Nov 2022. There was 1 interview round.
Autocad is a computer-aided design software used for creating 2D and 3D drawings and models.
Autocad is used in various industries such as architecture, engineering, and construction.
It allows users to create precise and accurate drawings and models.
Autocad offers a wide range of tools and features for designing and drafting.
Users can also customize the software to suit their specific needs.
Examples of Autocad projects ...
Managing the tool requires knowledge of its functions and shortcuts.
Familiarize yourself with the tool's interface and functions
Learn keyboard shortcuts to increase efficiency
Regularly update and maintain the software
Attend training sessions or online tutorials to improve skills
Organize files and projects for easy access and management
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Based on Designation Interview Rounds will be there. First of all Written exam is there in objective type you need to finish that one.
Plastering quantities can be calculated by measuring the surface area and thickness of the plaster.
Measure the length and height of the surface to be plastered
Calculate the surface area by multiplying the length and height
Determine the required thickness of the plaster
Multiply the surface area by the thickness to get the plastering quantity
Add 10-15% extra for wastage and uneven surfaces
One way slab is a type of reinforced concrete slab that is supported by beams on two opposite sides. Two way slab is supported by beams on all four sides.
One way slab is designed to carry the load in one direction only
Two way slab is designed to carry the load in both directions
One way slab is economical for small spans and light loads
Two way slab is suitable for larger spans and heavy loads
Examples of one way slab inc...
Development length is the length of reinforcement required to transfer the stress from steel to concrete.
It is the minimum length of reinforcement bar required beyond the point of maximum stress.
It ensures that the steel reinforcement bars do not slip from their position.
It depends on the diameter of the reinforcement bar, the grade of concrete, and the bond strength between steel and concrete.
For example, the developm...
BBS schedule can be made by following a few steps.
Determine the scope of the project
Identify the activities required to complete the project
Determine the duration of each activity
Determine the sequence of activities
Create a network diagram
Calculate the critical path
Assign resources to each activity
Create a Gantt chart
Update the schedule as necessary
Shuttering quantity can be taken by calculating the surface area of the structure to be casted.
Calculate the surface area of the structure to be casted
Determine the thickness of the shuttering material
Multiply the surface area by the thickness to get the shuttering quantity
Consider the wastage factor while calculating the quantity
Example: If the surface area of the structure is 100 sq. m and the thickness of the shutte...
Fine aggregate and coarse aggregate are types of materials used in construction.
Fine aggregate is a material that is smaller than 4.75mm in size, such as sand.
Coarse aggregate is a material that is larger than 4.75mm in size, such as gravel or crushed stone.
Both types of aggregate are commonly used in concrete and other construction applications.
The ratio of fine to coarse aggregate in concrete mixtures can affect the
The minimum thickness of ceiling plastering is 6mm.
The thickness of ceiling plastering depends on the type of plaster used.
For cement plaster, the minimum thickness is 6mm.
For gypsum plaster, the minimum thickness is 9mm.
The thickness may vary depending on the condition of the ceiling surface.
It is important to ensure that the plaster is applied evenly and smoothly.
Top trending discussions
posted on 18 Nov 2024
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
I prioritize building trust, understanding client needs, providing personalized service, and maintaining open communication.
Building trust through transparency and honesty
Understanding client needs and preferences
Providing personalized service tailored to each client
Maintaining open communication throughout the process
posted on 16 Dec 2023
I applied via LinkedIn and was interviewed in Nov 2024. There was 1 interview round.
I was interviewed in Jan 2025.
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in May 2024. There were 4 interview rounds.
Experienced executive accountant with a strong track record in financial management and strategic planning.
Over 10 years of experience in accounting and finance
Expertise in budgeting, forecasting, and financial analysis
Proven ability to streamline processes and improve efficiency
Strong communication and leadership skills
Previously managed a team of accountants at XYZ Corporation
posted on 7 Nov 2024
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
posted on 27 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
There are several types of waterproofing methods used in construction to protect buildings from water damage.
Membrane waterproofing
Cementitious waterproofing
Crystalline waterproofing
Bituminous waterproofing
Polyurethane liquid membrane waterproofing
The laying process of Italian marble involves preparing the surface, applying adhesive, placing the marble, and grouting. Dry cladding involves fixing marble without water, while wet cladding involves using water during installation.
Prepare the surface by cleaning and leveling it
Apply adhesive on the back of the marble slab
Place the marble slab carefully on the surface
Grout the joints to fill in any gaps
Dry cladding do...
I applied via Campus Placement and was interviewed in Jan 2024. There were 3 interview rounds.
The communication system in a Power Substation involves various technologies and protocols to ensure efficient and reliable transmission of data.
Communication between control room and substation equipment
SCADA systems for monitoring and control
Fiber optic cables for high-speed data transmission
Protocols like DNP3, Modbus, and IEC 61850 for data exchange
Remote terminal units (RTUs) for collecting data from field devices
SLD of a Power Substation is a graphical representation of the electrical system showing how different components are connected and interact.
SLD typically includes transformers, circuit breakers, switches, relays, and other electrical equipment.
It shows the flow of electricity from the power source to the distribution lines and various loads.
Components are represented by standardized symbols and lines indicating connec...
Wave traps are devices used in electrical systems to prevent the passage of high-frequency currents while allowing the flow of power frequency currents.
Wave traps are typically used in power systems to protect equipment from high-frequency currents generated by lightning strikes or switching operations.
They work by providing a low impedance path for power frequency currents to flow through, while blocking high-frequenc...
I have a strong background in renewable energy and project management, with a passion for sustainability and innovation.
I have a degree in Environmental Science with a focus on renewable energy technologies.
I have previous experience working on solar power projects, including overseeing installation and maintenance.
I am familiar with industry regulations and standards related to solar power projects.
I have a track reco...
based on 4 interviews
Interview experience
based on 36 reviews
Rating in categories
Assistant Engineer
18
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Senior Engineer
9
salaries
| ₹5 L/yr - ₹6 L/yr |
Civil Site Engineer
5
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Assistant Trainee Engineer
5
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Project Engineer
5
salaries
| ₹5.4 L/yr - ₹7.8 L/yr |
Sobha
Prestige Group
DLF
Godrej Properties