Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Praneeth Group Team. If you also belong to the team, you can get access from here

Praneeth Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Praneeth Group Assistant Trainee Engineer Interview Questions, Process, and Tips

Updated 9 Jan 2023

Praneeth Group Assistant Trainee Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Based on Designation Interview Rounds will be there. First of all Written exam is there in objective type you need to finish that one.

Round 3 - Technical 

(7 Questions)

  • Q1. How to take plastering Quantities
  • Ans. 

    Plastering quantities can be calculated by measuring the surface area and thickness of the plaster.

    • Measure the length and height of the surface to be plastered

    • Calculate the surface area by multiplying the length and height

    • Determine the required thickness of the plaster

    • Multiply the surface area by the thickness to get the plastering quantity

    • Add 10-15% extra for wastage and uneven surfaces

  • Answered by AI
  • Q2. Define one way slab two way slab
  • Ans. 

    One way slab is a type of reinforced concrete slab that is supported by beams on two opposite sides. Two way slab is supported by beams on all four sides.

    • One way slab is designed to carry the load in one direction only

    • Two way slab is designed to carry the load in both directions

    • One way slab is economical for small spans and light loads

    • Two way slab is suitable for larger spans and heavy loads

    • Examples of one way slab inc...

  • Answered by AI
  • Q3. What is Development length
  • Ans. 

    Development length is the length of reinforcement required to transfer the stress from steel to concrete.

    • It is the minimum length of reinforcement bar required beyond the point of maximum stress.

    • It ensures that the steel reinforcement bars do not slip from their position.

    • It depends on the diameter of the reinforcement bar, the grade of concrete, and the bond strength between steel and concrete.

    • For example, the developm...

  • Answered by AI
  • Q4. How to make BBS Schedule
  • Ans. 

    BBS schedule can be made by following a few steps.

    • Determine the scope of the project

    • Identify the activities required to complete the project

    • Determine the duration of each activity

    • Determine the sequence of activities

    • Create a network diagram

    • Calculate the critical path

    • Assign resources to each activity

    • Create a Gantt chart

    • Update the schedule as necessary

  • Answered by AI
  • Q5. How to Take Shuttering Quantity
  • Ans. 

    Shuttering quantity can be taken by calculating the surface area of the structure to be casted.

    • Calculate the surface area of the structure to be casted

    • Determine the thickness of the shuttering material

    • Multiply the surface area by the thickness to get the shuttering quantity

    • Consider the wastage factor while calculating the quantity

    • Example: If the surface area of the structure is 100 sq. m and the thickness of the shutte...

  • Answered by AI
  • Q6. Define Fine Aggregate and Coarse Aggregate
  • Ans. 

    Fine aggregate and coarse aggregate are types of materials used in construction.

    • Fine aggregate is a material that is smaller than 4.75mm in size, such as sand.

    • Coarse aggregate is a material that is larger than 4.75mm in size, such as gravel or crushed stone.

    • Both types of aggregate are commonly used in concrete and other construction applications.

    • The ratio of fine to coarse aggregate in concrete mixtures can affect the

  • Answered by AI
  • Q7. What is the minimum thickness of Ceiling Plastering
  • Ans. 

    The minimum thickness of ceiling plastering is 6mm.

    • The thickness of ceiling plastering depends on the type of plaster used.

    • For cement plaster, the minimum thickness is 6mm.

    • For gypsum plaster, the minimum thickness is 9mm.

    • The thickness may vary depending on the condition of the ceiling surface.

    • It is important to ensure that the plaster is applied evenly and smoothly.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - After writing the exam you Will face Technical Round by Company General Manager. Don't Panic Everything will be okay If you attempt well.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Coding Test 

Python code test and other website making

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay calm

Praneeth Group Interview FAQs

How many rounds are there in Praneeth Group Assistant Trainee Engineer interview?
Praneeth Group interview process usually has 3 rounds. The most common rounds in the Praneeth Group interview process are Resume Shortlist, Assignment and Technical.
What are the top questions asked in Praneeth Group Assistant Trainee Engineer interview?

Some of the top questions asked at the Praneeth Group Assistant Trainee Engineer interview -

  1. What is the minimum thickness of Ceiling Plaster...read more
  2. How to Take Shuttering Quant...read more
  3. How to take plastering Quantit...read more

Tell us how to improve this page.

Praneeth Group Assistant Trainee Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all
Praneeth Group Assistant Trainee Engineer Salary
based on 5 salaries
₹1.8 L/yr - ₹3 L/yr
20% less than the average Assistant Trainee Engineer Salary in India
View more details
Assistant Engineer
18 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Senior Engineer
9 salaries
unlock blur

₹5 L/yr - ₹6 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Assistant Trainee Engineer
5 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Project Engineer
5 salaries
unlock blur

₹5.4 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Praneeth Group with

Sobha

3.9
Compare

Prestige Group

4.3
Compare

DLF

3.9
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview