i
Prama Hikvision India
Filter interviews by
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
The OSI model is a conceptual framework that standardizes the functions of a telecommunication or computing system into seven distinct layers.
The OSI model stands for Open Systems Interconnection model
It helps in understanding how different networking protocols work together
Each layer has specific functions and communicates with adjacent layers
Examples of layers include physical layer, data link layer, network layer, e
I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.
To change motor rotation, swap any two of the three power supply wires.
Swap any two of the three power supply wires to change motor rotation.
Ensure power is disconnected before making any changes.
Consult the motor's manual for specific instructions.
Test the motor after making the changes to ensure it is rotating in the desired direction.
Two-way connection can be achieved by using two switches to control a single light or appliance from two different locations.
Install two switches at different locations to control the same light or appliance
Connect the common terminal of one switch to the phase or live wire
Connect the common terminal of the other switch to the light or appliance
Connect the remaining terminals of both switches to complete the circuit
Tes
Termination for control panel involves connecting wires from various components to the terminal blocks inside the panel.
Identify the components that need to be connected to the control panel
Strip the insulation off the wires to expose the conductors
Connect the wires to the appropriate terminal blocks based on the wiring diagram
Secure the connections with terminal screws or clamps
Label the wires for easy identification
Terminating a GIS panel involves connecting and securing the cables to the appropriate terminals.
Identify the cables to be terminated
Strip the insulation from the cable ends
Connect the cables to the designated terminals
Secure the connections with appropriate fasteners
Test the connections to ensure they are secure and functioning properly
Termination for switch gear involves connecting the wires to the appropriate terminals for proper functioning.
Identify the terminals for the switch gear
Strip the insulation from the wires to expose the conductors
Connect the wires to the corresponding terminals using appropriate connectors
Ensure proper tightening of the connectors to secure the connection
Test the connection to ensure it is functioning correctly
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
I have a Bachelor's degree in Electrical Engineering and a certification in Electronics.
Bachelor's degree in Electrical Engineering
Certification in Electronics
I have 5 years of experience working as a technician in various industries.
5 years of experience as a technician
Worked in various industries
Hands-on experience with troubleshooting and maintenance
Familiar with different types of equipment and tools
I am from a small town in the Midwest called Springfield.
I grew up in a close-knit community surrounded by farmland.
The town has a population of around 10,000 people.
Springfield is known for its annual corn festival.
It is located about an hour away from the nearest big city.
I work with a team of dedicated and skilled technicians who are always ready to assist.
Collaborate with other technicians to troubleshoot and solve technical issues
Communicate effectively with team members to ensure smooth workflow
Support and assist colleagues in completing tasks efficiently
My salary expectation is based on my experience, qualifications, and the industry standard.
Consider my level of experience and qualifications
Research industry standards for similar positions
Be prepared to negotiate based on benefits and perks offered
I appeared for an interview in Oct 2017.
posted on 20 Nov 2024
I applied via Job Fair and was interviewed before Nov 2023. There were 2 interview rounds.
Line related question
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
The in-process quality standard is a set of guidelines and criteria that ensure quality control during the manufacturing process.
It includes monitoring and controlling the production process to ensure that the final product meets the required quality standards.
It involves regular inspections and testing of the product at various stages of production.
It helps to identify and correct any defects or issues before the fina...
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.
Quality management system is a framework that helps organizations ensure that their products and services meet customer requirements.
QMS includes processes, procedures, and resources for implementing quality management.
It focuses on meeting customer expectations and continuously improving processes.
Examples of QMS include ISO 9001 certification and Six Sigma methodology.
Lean manufacturing is a systematic method for eliminating waste within a manufacturing process to improve efficiency and quality.
Focuses on continuous improvement
Eliminates waste in all forms (time, resources, etc.)
Involves all employees in the process
Uses tools like 5S, Kanban, and value stream mapping
Aims to deliver maximum value to the customer with minimum waste
The 7 quality pillars are key principles that guide quality management in an organization.
Customer focus - meeting customer needs and expectations
Leadership - establishing unity of purpose and direction
Engagement of people - involving and empowering employees
Process approach - managing activities as processes
Improvement - continually improving processes and products
Evidence-based decision making - using data and inform...
I applied via Recruitment Consultant and was interviewed in May 2019. There were 5 interview rounds.
First angle projection and third angle projection are two methods of creating 2D drawings of 3D objects.
First angle projection is commonly used in Europe and Asia, while third angle projection is commonly used in North America.
In first angle projection, the object is placed in front of the viewing plane and the orthographic projections are drawn behind it.
In third angle projection, the object is placed behind the viewi...
Types of fits and tolerances are important in manufacturing to ensure proper functioning of parts.
Fits refer to the degree of tightness or looseness between two mating parts.
Clearance fit allows for free movement between parts, while interference fit requires force to assemble.
Transition fit is a combination of clearance and interference fit.
Tolerances refer to the allowable variation in dimensions of a part.
A tight to...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
126
salaries
| ₹5.1 L/yr - ₹18 L/yr |
Quality Engineer
82
salaries
| ₹2.2 L/yr - ₹4.6 L/yr |
Senior Executive
69
salaries
| ₹3 L/yr - ₹10 L/yr |
Technical Support Engineer
58
salaries
| ₹2 L/yr - ₹5.1 L/yr |
Production Engineer
58
salaries
| ₹2.3 L/yr - ₹4.8 L/yr |
Mitsubishi Electric India
MCM Telecom Equipment
Alfanar
Samsung Display