Filter interviews by
Be the first one to contribute and help others!
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.
Closed loop control systems use feedback to maintain a desired output
They continuously monitor the output and compare it to the desired input
Based on the comparison, adjustments are made to maintain the desired output
Examples include thermostat-controlled heating systems and cruise control in cars
posted on 20 Aug 2024
I applied via Job Portal and was interviewed in Jul 2024. There was 1 interview round.
I am a passionate software engineer with 5 years of experience in developing web applications using Java, Spring Boot, and Angular.
5 years of experience in software development
Proficient in Java, Spring Boot, and Angular
Passionate about creating innovative web applications
I completed a software engineering internship at a tech company, where I worked on developing new features for their mobile app.
Developed new features for mobile app
Collaborated with team members on coding tasks
Participated in code reviews and testing
Learned about agile development practices
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
posted on 16 Sep 2023
I was interviewed in Aug 2023.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
About experience about cell and SOP,MSDS, etc.
About experience about and how to improve quality, efficiency,
TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.
TPS is a key performance indicator for systems handling high volumes of transactions.
It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.
Higher TPS indicates better system performance and scalability.
For example, a payment gateway may...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items.
Set in order: Arrange items so they are easy to use and label them to eliminate searching.
Shine: Clean the work area and equipment regularly.
Standardize: Establish ...
Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
based on 11 reviews
Rating in categories
VMC Programmer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Power
ReNew
Vestas
Adani Green Energy