Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
Transformer Testing
Transformer protection
Relay
CT
Breker
HT & LT Panel
Moter IR&WR & PI
Moter Name Plet
Earthing
My current salary is competitive for a junior engineer position in the electrical field.
My current salary is in line with industry standards for junior engineers in the electrical field.
I am satisfied with my current salary and feel it reflects my skills and experience.
I have received positive feedback on my performance which may have contributed to salary increases.
I am open to discussing salary expectations for a new...
Top trending discussions
I applied via Campus Placement and was interviewed in Jun 2022. There was 1 interview round.
Transformers work on the principle of electromagnetic induction. Mineral oil is commonly used in transformers. If oil is not added, the transformer may overheat and fail.
Transformers work on the principle of electromagnetic induction
Mineral oil is commonly used in transformers to provide insulation and cooling
If oil is not added, the transformer may overheat and fail
To start a DC motor, apply a voltage to the motor terminals.
Connect the positive terminal of the power supply to the motor's positive terminal.
Connect the negative terminal of the power supply to the motor's negative terminal.
Gradually increase the voltage to avoid sudden jerks or damage to the motor.
Ensure the motor is properly lubricated and free from any mechanical obstructions before starting.
posted on 20 Feb 2023
I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.
Profit and loss , percentage, average, age, time and work, ratio, syllogism, series, dice, direction,mirrer image,water image,
posted on 6 Mar 2024
I applied via Campus Placement and was interviewed in Sep 2023. There was 1 interview round.
It's basic level of questions you don't have panic give it with positive attitude.questions are asked from time and work, coding decoding, basic verbal questions and profit loss
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 12 May 2018
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
486
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
340
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
255
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
242
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
215
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Kalpataru Projects International