I was interviewed in Oct 2024.
DFIG stands for Doubly Fed Induction Generator, a type of generator used in wind turbines.
DFIG is a type of generator commonly used in wind turbines
It has two sets of windings - one connected to the grid and the other connected to a converter
The converter allows control of the generator's output power and speed
DFIG is known for its ability to provide variable speed operation and improved efficiency
It is a popular choic...
Wind power is generated by harnessing the kinetic energy of wind to turn turbines, which then convert the energy into electricity.
Wind turbines capture the kinetic energy of the wind and convert it into mechanical energy.
The mechanical energy is then used to turn a generator, which produces electricity.
Wind power is a renewable energy source that is clean and sustainable.
Wind farms are large areas with multiple wind tu...
posted on 23 Feb 2024
Plant load factor is a measure of the actual output of a power plant compared to its maximum possible output.
Plant load factor is calculated by dividing the actual energy generated by the plant over a specific period by the maximum possible energy that could have been generated during the same period.
It is expressed as a percentage and indicates how efficiently a power plant is being utilized.
A high plant load factor i...
Machine availability is the percentage of time a machine is able to be used for its intended purpose.
Machine availability is calculated by dividing the total operating time by the total time in a given period, then multiplying by 100.
For example, if a machine operates for 800 hours in a month and there are 1000 total possible operating hours, the availability would be 80%.
Factors like downtime, maintenance, and repairs
posted on 5 Sep 2023
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
A line diagram of a wind turbine generator (WTG) shows the flow of energy from wind to electricity.
The diagram typically includes the rotor blades, gearbox, generator, and power electronics
The blades capture wind energy and turn the rotor, which drives the gearbox
The gearbox increases the rotational speed and sends it to the generator
The generator converts the rotational energy into electrical energy
The power electroni...
DFIG converters are used in wind turbines to convert variable frequency AC power to DC power and back to AC power.
DFIG stands for Doubly Fed Induction Generator
The converter consists of two back-to-back voltage source converters
One converter controls the rotor current and the other controls the grid current
The rotor current is controlled to maintain a constant torque on the turbine
The grid current is controlled to main...
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Increasing business can be achieved through various strategies.
Identify target audience and tailor marketing efforts accordingly
Offer promotions and discounts to attract new customers
Improve customer service to retain existing customers
Expand product or service offerings to attract a wider audience
Collaborate with other businesses to reach new markets
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
I have extensive experience working with wind turbines, including maintenance, troubleshooting, and repairs.
Performed regular maintenance checks on wind turbines to ensure optimal performance
Troubleshooted and repaired mechanical and electrical issues as needed
Worked with a team to install new wind turbines and ensure they were functioning correctly
Utilized specialized tools and equipment to perform tasks safely and ef
Site incharge oversees operations, manages resources, ensures safety, and coordinates with stakeholders.
Managing day-to-day operations at the site
Supervising and coordinating with on-site staff and contractors
Ensuring compliance with safety regulations and protocols
Managing resources effectively to meet project deadlines
Communicating with clients, vendors, and other stakeholders
Troubleshooting technical issues and prov...
based on 1 review
Rating in categories
MIS Executive
9
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Project Engineer
7
salaries
| ₹2.7 L/yr - ₹3.6 L/yr |
Project Manager
6
salaries
| ₹5.2 L/yr - ₹9 L/yr |
Electrical Engineer
6
salaries
| ₹2 L/yr - ₹12 L/yr |
Assistant Manager
5
salaries
| ₹3.7 L/yr - ₹4.7 L/yr |
Sterlite Power
Adani Power
Tata Power
Reliance Power