Round 1 - Technical 

(5 Questions)

  • Q1. Least count of Surveying instruments
  • Ans. 

    The least count of surveying instruments is the smallest measurement that can be read or estimated on the instrument's scale.

    • The least count is determined by the smallest division on the scale of the instrument.

    • It is important for accurate measurements in surveying work.

    • For example, a theodolite may have a least count of 20 seconds, while a leveling rod may have a least count of 1 millimeter.

  • Answered by AI
  • Q2. Stages of comercial construction project
  • Ans. 

    The stages of a commercial construction project include planning, design, pre-construction, construction, and post-construction.

    • Planning: Define project goals, scope, budget, and schedule.

    • Design: Develop architectural and engineering plans.

    • Pre-construction: Obtain permits, hire contractors, and finalize project details.

    • Construction: Build the project according to plans.

    • Post-construction: Inspect the project, address an

  • Answered by AI
  • Q3. Specifications of binding wire used in rcc
  • Ans. 

    Binding wire used in RCC should meet specific specifications for strength and durability.

    • Binding wire used in RCC should be made of mild steel with a minimum tensile strength of 550 N/mm2.

    • The wire should have a diameter ranging from 0.9 mm to 1.6 mm.

    • It should be free from rust, oil, and other coatings that may affect its bond with concrete.

    • The binding wire should be flexible enough to be easily twisted and tied around ...

  • Answered by AI
  • Q4. Measurements conversion
  • Q5. Capacity of a 4m jack
  • Ans. 

    The capacity of a 4-meter jack depends on the specific type and model of the jack.

    • Capacity can vary based on the design and specifications of the jack

    • Common capacities for 4-meter jacks range from 2 tons to 20 tons

    • Always refer to the manufacturer's specifications for accurate capacity information

  • Answered by AI

Interview questions from similar companies

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Make connection with other to grow up. Finally change your company when you have enough experience. .

I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cement test ,initially setting time
  • Q2. Cube mould size
  • Ans. 

    Cube mould size is a standard size used for testing the compressive strength of concrete.

    • Cube moulds are typically made of steel or cast iron.

    • The standard size for cube moulds is 150mm x 150mm x 150mm.

    • Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.

    • The moulds are filled with concrete and left to cure before being tested for compressive strength.

    • Cube moulds are used to ensure that the c...

  • Answered by AI
  • Q3. 1m. 8mm Dia steel rod weight,how to calculate
  • Ans. 

    To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.

    • Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length

    • Find the density of steel, which is typically around 7850 kg/m^3

    • Multiply the volume by the density to get the weight of the rod

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical strong.This interview was both knowledge and communication between sub contractor and engineer. Most of the questions related to diploma circling.

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

Pinnacle Prime Constructions Interview FAQs

How many rounds are there in Pinnacle Prime Constructions Civil Site Engineer interview?
Pinnacle Prime Constructions interview process usually has 1 rounds. The most common rounds in the Pinnacle Prime Constructions interview process are Technical.
What are the top questions asked in Pinnacle Prime Constructions Civil Site Engineer interview?

Some of the top questions asked at the Pinnacle Prime Constructions Civil Site Engineer interview -

  1. Specifications of binding wire used in ...read more
  2. Least count of Surveying instrume...read more
  3. Stages of comercial construction proj...read more

Tell us how to improve this page.

Pinnacle Prime Constructions Civil Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Pinnacle Prime Constructions Civil Site Engineer Salary
based on 4 salaries
₹2.2 L/yr - ₹4.2 L/yr
19% less than the average Civil Site Engineer Salary in India
View more details

Pinnacle Prime Constructions Civil Site Engineer Reviews and Ratings

based on 3 reviews

4.4/5

Rating in categories

4.4

Skill development

3.8

Work-life balance

3.4

Salary

4.1

Job security

4.1

Company culture

3.8

Promotions

3.6

Work satisfaction

Explore 3 Reviews and Ratings
Store Incharge
5 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Quantity Surveyor
5 salaries
unlock blur

₹1.8 L/yr - ₹5.4 L/yr

HR Manager
4 salaries
unlock blur

₹4.1 L/yr - ₹5.6 L/yr

Site Engineer
4 salaries
unlock blur

₹2.4 L/yr - ₹4.2 L/yr

Project Manager Civil
4 salaries
unlock blur

₹6.2 L/yr - ₹7.6 L/yr

Explore more salaries
Compare Pinnacle Prime Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview