Filter interviews by
I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.
ABS stands for Anti-lock Braking System.
ABS is a safety system that prevents the wheels from locking up during braking.
It allows the driver to maintain steering control and avoid skidding.
ABS works by rapidly pulsing the brakes to prevent the wheels from locking up.
It is commonly found in modern cars and motorcycles.
ABS is an important safety feature that can prevent accidents and save lives.
GENERAL QUESTION FOR BACKGROUND
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
Math, science any other
I applied via Approached by Company and was interviewed in Jan 2023. There were 3 interview rounds.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
To grow your sales, focus on customer satisfaction, effective marketing strategies, and continuous improvement.
Understand your target audience and their needs
Provide excellent customer service
Implement effective marketing strategies such as social media advertising, email marketing, and content marketing
Offer promotions and discounts to attract new customers
Analyze sales data and customer feedback to identify areas for...
Questions related to problem-solving and Excel-based scenarios.
posted on 27 Mar 2018
I appeared for an interview in Mar 2018.
I applied via Naukri.com and was interviewed in May 2019. There was 1 interview round.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Engineer
16
salaries
| ₹3.1 L/yr - ₹6.1 L/yr |
Quality Engineer
13
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Assistant Manager
12
salaries
| ₹6.5 L/yr - ₹8 L/yr |
Junior Engineer
10
salaries
| ₹2.4 L/yr - ₹3.4 L/yr |
Senior Quality Engineer
8
salaries
| ₹4 L/yr - ₹4.6 L/yr |
Reliance Communications
ZF Steering Gear
Dhoot Transmission
DISH TV