Upload Button Icon Add office photos

Filter interviews by

OVT India Engineer Interview Questions and Answers

Updated 18 Feb 2021

OVT India Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2021

I applied via Naukri.com and was interviewed before Feb 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Introduce to yourself means about you , your qualifications ,your work experience and your current job profile.
  • Q2. Tell to interviewer about your current job profile,your responsibility and reporting to which person.
  • Q3. Complete prepared on your topic which have you mentioned in your resume.
  • Q4. Resume should be neat and clear .

Interview Preparation Tips

Interview preparation tips for other job seekers - Go for interview in formal dress code with two copy of your resume. Your answer should be confident which have you know.Main focus on your job profile related query which have you applied and which have you mention in resume. Always be in confident and happy.wish you all the best with my experience till now.Thanks

Interview questions from similar companies

I applied via Job Portal and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Cable manufacturing process
  • Ans. 

    Cable manufacturing involves several steps including wire drawing, stranding, insulation, and jacketing.

    • Wire drawing involves pulling metal through a die to reduce its diameter.

    • Stranding involves twisting multiple wires together to form a cable.

    • Insulation is added to protect the wires from damage and prevent electrical interference.

    • Jacketing is the final step where a protective outer layer is added to the cable.

    • Quality...

  • Answered by AI
  • Q2. Read it before you apear for interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, stay focused
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Process knowledge on Electroplating Process from start to end
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared on your strong areas and be confident
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical knowledge abt your UG
  • Q2. Tell boldly what is u know

Interview Preparation Tips

Interview preparation tips for other job seekers - Tell frankly what you know, dont tell wrong answers

I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Basic science questions are give in a written form questionare

Round 3 - Technical 

(2 Questions)

  • Q1. This can be related to your previous job and work responsibilities
  • Q2. What are seven waste
  • Ans. 

    Seven wastes are non-value adding activities in a process that lead to inefficiency and increased costs.

    • Transportation waste

    • Inventory waste

    • Motion waste

    • Waiting waste

    • Overproduction waste

    • Overprocessing waste

    • Defects waste

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for a tough interview as they are so concerned about who they are hiring.

I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Say our work in Plant.. morning to evening
  • Q2. If your plan not followed by production team that time what will your steps

Interview Preparation Tips

Topics to prepare for Eastman Auto and Power Limited Engineer interview:
  • PPC
Interview preparation tips for other job seekers - Say everything in confidence and never say extra
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Why do u leave current job.
  • Q2. Why do u join HPL electric

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong technical knowledge. And positive attitude.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Basic Electricals and Electronics Engineering and some conceptual questions tricky in nature.
  • Q2. Previous Experience related technical questions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you modem connected with ccms.
  • Ans. 

    Modem can be connected with CCMS using a physical cable or wirelessly through a network connection.

    • Connect the modem to the CCMS using an Ethernet cable for a wired connection.

    • Configure the modem to connect to the CCMS network wirelessly through Wi-Fi or cellular data.

    • Ensure proper settings and security protocols are in place for a secure connection.

    • Test the connection to ensure data transfer and communication between

  • Answered by AI
  • Q2. How do you intrigate with ccms
  • Ans. 

    I integrate with CCMS by collaborating with cross-functional teams, utilizing CCMS tools for documentation, and ensuring consistency and accuracy in content.

    • Collaborate with cross-functional teams to understand content requirements

    • Utilize CCMS tools for creating, editing, and managing documentation

    • Ensure consistency and accuracy in content by following style guides and best practices

  • Answered by AI
  • Q3. What is the Process of lights showing on dashboard
  • Ans. 

    The lights on the dashboard indicate various issues or statuses of the vehicle.

    • Lights are controlled by sensors that monitor different aspects of the vehicle

    • Different colors indicate different levels of urgency or severity

    • Common lights include check engine, oil pressure, battery, and brake system

    • Refer to the vehicle's manual for specific meanings of each light

  • Answered by AI
  • Q4. Tell me about you self.
  • Q5. How many types of meter & describe.
  • Ans. 

    There are various types of meters used for different purposes such as measuring electricity, water, gas, etc.

    • Electricity meters: measure the amount of electricity consumed by a household or business

    • Water meters: measure the volume of water used in a residential or commercial building

    • Gas meters: measure the amount of gas consumed for heating or cooking purposes

    • Smart meters: digital devices that record energy consumption...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Aptitude Test, Excel and PowerPoint proctored online test

Round 2 - Technical 

(3 Questions)

  • Q1. Question based on MTTR and MTBF
  • Q2. Hydraulics and pneumatic system daigram
  • Q3. Kaizen and projects done
  • Ans. 

    Kaizen is a continuous improvement philosophy that can be applied to projects to enhance efficiency and quality.

    • Kaizen involves making small, incremental changes to processes or projects to improve overall performance.

    • Projects can benefit from Kaizen by identifying areas for improvement, implementing changes, and continuously monitoring and adjusting.

    • Examples of Kaizen in projects include streamlining workflows, reduci...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Basic details regarding working hours, and salary discussion

Interview Preparation Tips

Topics to prepare for ATLBattery Technology (India) Private Limited Engineer interview:
  • Hydraulics
  • Pneumatic System
  • MTTR
  • MTBF
  • Kaizen Implementation
  • Servo Drives
  • PLC

Tell us how to improve this page.

OVT India Engineer Salary
based on 10 salaries
₹2.8 L/yr - ₹4.2 L/yr
40% less than the average Engineer Salary in India
View more details

OVT India Engineer Reviews and Ratings

based on 7 reviews

3.3/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

3.8

Promotions

3.8

Work satisfaction

Explore 7 Reviews and Ratings
Quality Engineer
33 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

SMT Operator
26 salaries
unlock blur

₹1.8 L/yr - ₹3.5 L/yr

SMT Engineer
16 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Production Engineer
13 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

SMT Quality Engineer
11 salaries
unlock blur

₹2 L/yr - ₹3.3 L/yr

Explore more salaries
Compare OVT India with

Polycab Wires

4.0
Compare

Medha Servo Drives

4.2
Compare

Amphenol Interconnect

4.2
Compare

Raychem RPG

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview