Oorjan Cleantech
Filter interviews by
I applied via Newspaper Ad and was interviewed in Mar 2024. There was 1 interview round.
The number of manpower needed for a 1 MW site in one day completion depends on various factors such as the complexity of the project, equipment availability, and skill level of the workers.
Number of manpower required will vary based on the type of work (installation, maintenance, etc.)
Availability of equipment like cranes, trucks, and tools will impact manpower needs
Skill level of workers will determine efficiency and ...
I applied via Approached by Company and was interviewed before Sep 2021. There was 1 interview round.
Internet optic thing refers to optical fiber cables used for transmitting data over long distances at high speeds.
Internet optic thing is also known as fiber optic cables.
It is made up of thin strands of glass or plastic that transmit data as pulses of light.
These cables are used for high-speed internet connections, telecommunication networks, and cable television.
They offer faster data transmission, higher bandwidth, ...
The maximum project site installed on grid solar refers to the largest solar power project connected to the electrical grid.
The max project site installed on grid solar is typically measured in terms of its capacity, which is the maximum amount of power it can generate.
This can be expressed in megawatts (MW) or gigawatts (GW).
For example, the largest project site installed on grid solar as of 2021 is the Bhadla Solar P...
Earthing is the process of connecting electrical equipment to the earth to prevent electric shock and damage to equipment.
Earthing provides a low resistance path for the fault current to flow to the ground.
The distance between two earth pits should be less than 10 meters.
The depth of the earth pit should be at least 3 meters.
Earthing is important for safety in electrical systems.
Earthing also helps in reducing electrom
Earthing is necessary in electrical field with value below 2 ohm for testing time and distance minimum two earth pit approx 1 meter.
Earthing is important for safety in electrical systems
The resistance of earthing should be below 2 ohm for effective grounding
Multiple earth pits should be installed at a distance of approximately 1 meter
Testing of earthing should be done regularly to ensure its effectiveness
Top trending discussions
I was interviewed in Jul 2024.
I was interviewed in Dec 2024.
Coding round was ok with mid level difficult questions
I applied via Naukri.com
Channel sales management involves managing relationships with third-party partners to sell products or services.
Involves working with distributors, resellers, and other partners to reach customers
Requires setting goals, providing support, and monitoring performance of channel partners
Examples include companies like Apple working with authorized retailers to sell iPhones
Our distributor is XYZ Company and our channel partners include ABC Corp and DEF Inc.
Distributor: XYZ Company
Channel partners: ABC Corp, DEF Inc
Distributor is responsible for distributing our products to various channel partners
Channel partners help in reaching our products to end customers
Maintaining good relationships with distributor and channel partners is crucial for business success
It is difficult to predict the exact amount of business that can be generated in a year as it depends on various factors.
The amount of business generated in a year can vary based on market conditions, competition, economic factors, and company performance.
Factors such as marketing strategies, product quality, customer service, and industry trends can also impact the amount of business generated.
For example, a new produ...
I am a passionate and dedicated individual with a background in marketing and a love for creative writing.
Background in marketing
Passionate about creative writing
Dedicated individual
posted on 16 Jan 2025
I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed in Dec 2024. There were 2 interview rounds.
Easy test with simple questions
Work job is working very honest
posted on 11 Sep 2024
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
A PID controller is a type of feedback control system that calculates an error value as the difference between a desired setpoint and a measured process variable.
PID stands for Proportional-Integral-Derivative, which are the three terms used to describe the controller's actions.
The proportional term responds to the current error value.
The integral term responds to the accumulation of past errors.
The derivative term res...
The power curve of a Wind Energy Conversion System (WECS) shows the relationship between wind speed and power output.
The power curve typically shows the rated power output at a certain wind speed, as well as the cut-in and cut-out speeds.
It is important for optimizing the performance of the WECS and determining the best locations for installation.
The shape of the power curve can vary depending on the type of wind turbi...
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
Interview experience
based on 30 reviews
Rating in categories
Project Engineer
9
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Assistant Manager
6
salaries
| ₹3.5 L/yr - ₹10.5 L/yr |
Assistant Manager Operations
5
salaries
| ₹3.5 L/yr - ₹9.1 L/yr |
Operations Manager
5
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Business Development Manager
5
salaries
| ₹5 L/yr - ₹5 L/yr |
CleanMax Enviro Energy Solutions
Fourth Partner Energy
SunSource Energy
AMPLUS SOLAR