I applied via Approached by Company and was interviewed before Aug 2021. There were 3 interview rounds.
Graduate Aptitude Test in Engineering. Duration was 4 hours. Grammar.
Essay Writing. Grammar. General Knowledge.
Top trending discussions
posted on 3 Jan 2024
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
Nodal analysis is a technique used in petroleum engineering to analyze and optimize the performance of oil and gas wells.
Nodal analysis involves the use of mathematical equations and software tools to model and simulate the flow of fluids in a wellbore.
It helps in determining the pressure, flow rate, and other parameters at different points in the well system.
The analysis considers factors such as reservoir properties,...
I have extensive experience in production technology and have achieved significant results in optimizing production processes.
Implemented advanced production techniques to increase oil and gas recovery rates
Developed and executed production strategies to maximize well productivity
Utilized artificial lift systems such as electric submersible pumps and gas lift to enhance production
Implemented data-driven approaches for ...
I applied via Job Fair and was interviewed in Aug 2023. There were 2 interview rounds.
HR Techial one_no_one Round Aptitude test?
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Ohm's law states that the current flowing through a conductor is directly proportional to the voltage applied across it, and inversely proportional to the resistance of the conductor.
Ohm's law is represented by the formula V = I * R, where V is voltage, I is current, and R is resistance.
It helps in calculating the current, voltage, or resistance in a circuit when the other two values are known.
For example, if a circuit...
I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.
In side panel dressings and termination
Side panel dressings refer to the coverings or enclosures on the sides of electrical panels.
Termination refers to the process of connecting electrical wires or cables to the appropriate terminals or connectors.
Proper side panel dressings and termination are essential for safety and to ensure efficient electrical connections.
Examples of side panel dressings include metal or plastic...
First raneeng the cebal put the tage namber after put the glend remove insulation and put the ferool
Working in an oil unit requires knowledge of electrical systems, safety protocols, and equipment maintenance.
Understand the electrical systems used in oil units
Follow safety protocols to prevent accidents and injuries
Perform regular maintenance on equipment to ensure proper functioning
Be aware of potential hazards such as flammable materials and high-pressure systems
Communicate effectively with other workers to coordin...
Termination control panel is used to connect and disconnect electrical circuits.
It is used to terminate electrical connections in a control panel
It helps in connecting and disconnecting electrical circuits
It is an important component in electrical installations
PLC panel is operated by programming the logic controller to control the electrical components.
Understand the logic of the system and program the PLC accordingly
Connect the input and output devices to the PLC panel
Test the system to ensure proper functioning
Regular maintenance and troubleshooting of the panel
Examples of PLC panels include conveyor systems, assembly lines, and HVAC systems
To install a transmitter, follow these steps
Choose a suitable location for the transmitter
Mount the transmitter securely
Connect the power supply to the transmitter
Connect the transmitter to the device it will be transmitting to
Configure the transmitter settings as required
CEBAL is not a term commonly used in the electrical field. Please provide more context or clarification.
I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.
posted on 3 Jan 2024
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
Nodal analysis is a technique used in petroleum engineering to analyze and optimize the performance of oil and gas wells.
Nodal analysis involves the use of mathematical equations and software tools to model and simulate the flow of fluids in a wellbore.
It helps in determining the pressure, flow rate, and other parameters at different points in the well system.
The analysis considers factors such as reservoir properties,...
I have extensive experience in production technology and have achieved significant results in optimizing production processes.
Implemented advanced production techniques to increase oil and gas recovery rates
Developed and executed production strategies to maximize well productivity
Utilized artificial lift systems such as electric submersible pumps and gas lift to enhance production
Implemented data-driven approaches for ...
I applied via Job Fair and was interviewed in Aug 2023. There were 2 interview rounds.
HR Techial one_no_one Round Aptitude test?
posted on 11 Jun 2024
based on 2 reviews
Rating in categories
Executive Engineer
71
salaries
| ₹12 L/yr - ₹35 L/yr |
Assistant Executive Engineer
48
salaries
| ₹14 L/yr - ₹25.1 L/yr |
Mechanical Technician
43
salaries
| ₹0.8 L/yr - ₹5.6 L/yr |
Safety Officer
42
salaries
| ₹2 L/yr - ₹9.2 L/yr |
Mechanical Engineer
32
salaries
| ₹8.4 L/yr - ₹16 L/yr |
Reliance Industries
Indian Oil Corporation
Bharat Petroleum
Hindustan Petroleum