I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.
Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
I appeared for an interview in Sep 2021.
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.