10+ Amazon Interview Questions and Answers

Updated 29 Nov 2024

Q1. 1. If you have to setup a quality lab, what will you do? 2. Formula of Concrete Mix design. 3. What is the process of concrete mix design? 4. Diagonal of Cube mould size 15cmx15cmx15cm. 5. What is Concrete Mix ...

read more
Ans.

Answering questions related to setting up a quality lab and concrete mix design.

  • To setup a quality lab, I would start by identifying the necessary equipment and tools required for testing and analysis.

  • I would ensure that the lab is properly equipped with instruments like compression testing machine, sieve shaker, weighing balance, etc.

  • For concrete mix design, the formula typically includes the proportions of cement, aggregates, water, and admixtures.

  • The process of concrete mi...read more

View 1 answer

Q2. What is FDD field dry density test

Ans.

FDD field dry density test is a method to determine the density of soil in the field.

  • FDD stands for Field Dry Density.

  • It is a test conducted on soil to measure its density.

  • The test involves extracting a soil sample from the field and determining its dry weight and volume.

  • The dry density is calculated by dividing the dry weight of the soil sample by its volume.

  • This test helps in assessing the compaction and quality of soil for construction purposes.

View 1 answer

Q3. Define of work permit start to end. Full form of ISO Hira Safety net

Ans.

A work permit is a written authorization that specifies the work to be done and the precautions to be taken before work can begin. ISO stands for International Organization for Standardization. Hira is a Hazard Identification and Risk Assessment process. Safety net is a fall protection system used in construction.

  • Work permit is a written document that authorizes specific work to be done in a safe manner

  • It outlines the precautions and safety measures to be taken before work ca...read more

Add your answer

Q4. How much slump in column concreting

Ans.

The slump in column concreting should be between 150-175 mm.

  • The slump should be measured before pouring the concrete.

  • The slump should be consistent throughout the column.

  • The slump should not exceed 175 mm to avoid segregation.

  • The slump should not be less than 150 mm to ensure proper compaction.

  • The slump can be adjusted by adding water or admixtures.

  • The slump test should be performed according to ASTM standards.

Add your answer
Discover Amazon interview dos and don'ts from real experiences

Q5. What is types of plaster Thickness of plaster internal external Thick Ness of gypsum Process of waterproofing

Ans.

Types of plaster include lime plaster, cement plaster, and gypsum plaster. Internal plaster is typically 12-15mm thick, while external plaster is 20mm thick. Gypsum plaster is usually 2-3mm thick. Waterproofing involves applying a waterproofing membrane or coating to prevent water penetration.

  • Types of plaster: lime plaster, cement plaster, gypsum plaster

  • Internal plaster thickness: 12-15mm

  • External plaster thickness: 20mm

  • Gypsum plaster thickness: 2-3mm

  • Waterproofing process: app...read more

Add your answer

Q6. Slump in column concreting 90 to 100 mm

Ans.

Slump in column concreting 90 to 100 mm

  • Slump refers to the consistency of the concrete mix

  • A slump of 90 to 100 mm indicates a very wet and unstable mix

  • This can lead to issues with the structural integrity of the column

  • Possible causes include incorrect water-cement ratio or improper mixing

  • Solutions may include adjusting the mix proportions or using additives to improve stability

Add your answer
Are these interview questions helpful?

Q7. Explain Cube casting and testing method and no of cubes need to be casted

Ans.

Cube casting and testing is a method to determine the compressive strength of concrete.

  • Cubes are casted from a sample of fresh concrete

  • The cubes are cured for a specific period of time

  • The cubes are then tested for compressive strength

  • The number of cubes to be casted depends on the project specifications

  • Typically, 3 to 5 cubes are casted for every 50 cubic meters of concrete

Add your answer

Q8. Types of tiles Size of tiles Which company tiles

Ans.

Types of tiles include ceramic, porcelain, glass, and natural stone. Sizes vary from small mosaic tiles to large format tiles. Companies like Johnson Tiles, Kajaria, and Somany are popular choices.

  • Types of tiles: ceramic, porcelain, glass, natural stone

  • Sizes of tiles: small mosaic to large format

  • Companies: Johnson Tiles, Kajaria, Somany

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Calculate the BBS, Quantity taking

Ans.

Calculating BBS and quantity takeoff

  • Calculate the Bar Bending Schedule (BBS) by determining the quantity of reinforcement bars required for a project

  • Consider the drawings, specifications, and structural requirements to accurately calculate the BBS

  • Use software tools like Excel, AutoCAD, or specialized estimation software for efficient calculations

  • Ensure accuracy in measurements and calculations to avoid material wastage or shortage

  • Example: Calculate the BBS for a reinforced co...read more

Add your answer

Q10. Density of building materials

Ans.

Building materials have varying densities depending on their composition.

  • Density is the mass per unit volume of a material.

  • Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).

  • Density affects the strength and durability of a structure, as well as its weight and cost.

View 1 answer

Q11. procedure for building construction

Ans.

The procedure for building construction involves several steps and processes.

  • Developing a project plan and obtaining necessary permits

  • Clearing the construction site and preparing the foundation

  • Constructing the structural framework and installing utilities

  • Completing interior and exterior finishes

  • Conducting inspections and obtaining certificates of occupancy

  • Handing over the completed building to the owner

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Amazon

based on 12 interviews in the last 1 year
Interview experience
3.9
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.0
 • 822 Interview Questions
3.5
 • 423 Interview Questions
4.0
 • 357 Interview Questions
3.7
 • 318 Interview Questions
3.9
 • 186 Interview Questions
4.0
 • 162 Interview Questions
View all
Top Nyati Group Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter