i
Novel Office
Filter interviews by
I applied via Indeed and was interviewed in Oct 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
posted on 14 Nov 2021
I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2024. There were 3 interview rounds.
Brain stellar puzzles were asked
Basic question on linked list and tree
I applied via Indeed and was interviewed in Nov 2020. There were 3 interview rounds.
The formula for calculating interest is Principal x Rate x Time.
Interest is calculated by multiplying the principal amount, the interest rate, and the time period.
The formula is: Interest = Principal x Rate x Time
For example, if you have a principal amount of $1000, an interest rate of 5%, and a time period of 1 year, the interest would be $50.
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
based on 1 review
Rating in categories
Business Development Manager
36
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Data Analyst
34
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Project Engineer
29
salaries
| ₹1.9 L/yr - ₹4.2 L/yr |
HR Executive
16
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Software Engineer
13
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant