i
Novel Office
Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2021. There were 4 interview rounds.
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
posted on 27 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A structured approach to work enhances efficiency, collaboration, and project success.
Define clear objectives: Establish what needs to be achieved, e.g., project milestones.
Plan and prioritize tasks: Use tools like Gantt charts to visualize timelines.
Collaborate effectively: Regular team meetings to discuss progress and challenges.
Monitor progress: Use KPIs to track performance and make adjustments as needed.
Review and...
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
Hook's law states that the force needed to extend or compress a spring is directly proportional to the distance it is stretched or compressed.
Hook's law is a principle in physics that describes the behavior of springs and elastic materials.
It states that the force exerted by a spring is directly proportional to the displacement or change in length of the spring.
The law can be mathematically represented as F = kx, where...
Homeslaw is a law that states that the rate of cooling of an object is proportional to the temperature difference between the object and its surroundings.
Homeslaw is also known as Newton's law of cooling.
It is commonly used in thermodynamics and heat transfer.
The law can be expressed mathematically as dQ/dt = -hA(T - Ts), where dQ/dt is the rate of heat transfer, h is the heat transfer coefficient, A is the surface are...
I applied via Campus Placement and was interviewed before Nov 2021. There were 4 interview rounds.
Topics very generic like which is better online learning or offline learning, theory or practical etc
Aluminium shuttering is a modern construction technique that involves using interlocking panels made of aluminium to form the walls, floors, and ceilings of a building.
The panels are lightweight and easy to handle, making them ideal for use in high-rise buildings and other large-scale construction projects.
The panels are pre-fabricated to the required dimensions and are then transported to the construction site.
The pan...
Business Development Manager
39
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Data Analyst
36
salaries
| ₹2.1 L/yr - ₹5.5 L/yr |
Project Engineer
33
salaries
| ₹1.9 L/yr - ₹5.6 L/yr |
HR Executive
16
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Software Engineer
13
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant