Upload Button Icon Add office photos

Filter interviews by

Northern Sky Properties Senior Supervisor Interview Questions, Process, and Tips

Updated 24 Dec 2023

Northern Sky Properties Senior Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Which IS code refer for concrete work
  • Ans. 

    IS code 456 is referred for concrete work

    • IS code 456 is the code for Plain and Reinforced Concrete - Code of Practice

    • This code provides guidelines for the design and construction of concrete structures

    • It covers various aspects such as materials, mix design, workmanship, testing, and quality control

  • Answered by AI
  • Q2. Volume of cement in cum meter
  • Ans. 

    Volume of cement in cubic meters is calculated based on the quantity of cement bags used and the density of cement.

    • Volume of cement in cubic meters = (Quantity of cement bags * Weight per bag) / Density of cement

    • For example, if 100 bags of cement are used, each weighing 50 kg, and the density of cement is 1440 kg/m^3, then the volume of cement would be (100 * 50) / 1440 = 3.47 cubic meters

  • Answered by AI
  • Q3. 1440 kg / cum cement
  • Q4. Volume of steel in cum meter
  • Ans. 

    Volume of steel in cubic meter is calculated by multiplying the length, width, and height of the steel piece.

    • Calculate the volume by multiplying the length, width, and height of the steel piece.

    • The formula for calculating volume is Volume = Length x Width x Height.

    • For example, if the steel piece is 2 meters long, 1 meter wide, and 0.5 meters high, the volume would be 2 x 1 x 0.5 = 1 cubic meter.

  • Answered by AI
  • Q5. 7850 kg/ cum meter
  • Q6. Hight of lintel in building
  • Ans. 

    The height of a lintel in a building is typically determined by the size of the opening it is spanning and the load it needs to support.

    • Lintels are horizontal supports above doorways, windows, or other openings in a building.

    • The height of a lintel is usually based on the width of the opening it is spanning.

    • The material and design of the lintel also play a role in determining its height.

    • For example, a wider opening may ...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Normalye question in interview
  • Q2. Joining please lulu mall
  • Q3. Joining please my interview
  • Q4. Normalye questions in interview
Round 2 - Joining please 

(1 Question)

  • Q1. Normalye question in interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Normalye question in

Northern Sky Properties Interview FAQs

How many rounds are there in Northern Sky Properties Senior Supervisor interview?
Northern Sky Properties interview process usually has 2 rounds. The most common rounds in the Northern Sky Properties interview process are Resume Shortlist and Technical.
What are the top questions asked in Northern Sky Properties Senior Supervisor interview?

Some of the top questions asked at the Northern Sky Properties Senior Supervisor interview -

  1. Which IS code refer for concrete w...read more
  2. Volume of cement in cum me...read more
  3. Volume of steel in cum me...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Northern Sky Properties interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 122 Interviews
Lodha Group Interview Questions
4.0
 • 121 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 31 Interviews
Puravankara Interview Questions
3.8
 • 18 Interviews
View all

Northern Sky Properties Senior Supervisor Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

1.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Project Engineer
4 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Site Engineer
3 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Store Incharge
3 salaries
unlock blur

₹2.4 L/yr - ₹2.4 L/yr

Legal Consultant
3 salaries
unlock blur

₹2.8 L/yr - ₹4.8 L/yr

Senior Site Engineer
3 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Explore more salaries
Compare Northern Sky Properties with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview