i
Nordex India
Filter interviews by
I applied via LinkedIn and was interviewed in Jul 2023. There was 1 interview round.
Lean manufacturing focuses on reducing waste and improving efficiency in production processes.
Eliminating unnecessary steps in production
Reducing inventory levels to minimize waste
Implementing just-in-time production methods
Utilizing visual management tools like Kanban boards
Continuous improvement through Kaizen events
Improving operator efficiency involves training, providing necessary tools and equipment, setting clear goals, and implementing performance feedback.
Provide proper training to ensure operators have the necessary skills and knowledge to perform their tasks efficiently
Equip operators with the right tools and equipment to streamline their work processes
Set clear goals and expectations for operators to work towards, which ...
I applied via Approached by Company and was interviewed before Sep 2023. There were 2 interview rounds.
Performing RCA (Root Cause Analysis) and 8D (Eight Disciplines) involves identifying the root cause of a problem and implementing a structured problem-solving process.
Identify the problem or issue that needs to be addressed.
Gather relevant data and information related to the problem.
Use tools like Fishbone Diagram, 5 Whys, or Pareto Analysis to identify the root cause.
Develop and implement corrective actions to address...
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
Discussed about production work order and its BOM analysis, discussed about
BOM stands for Bill of Materials, which is a list of raw materials, components, and assemblies required to manufacture a product.
BOM is essential for production planning and inventory management.
It helps in determining the cost of production and tracking the usage of materials.
BOM can be hierarchical, showing the relationship between different components and sub-assemblies.
Example: In the manufacturing of a car, the BO...
BOM How refers to Bill of Materials (BOM) and How is a common question used to inquire about the process or details of something.
BOM stands for Bill of Materials, which is a list of raw materials, components, and assemblies required to build a product.
The 'How' part of the question is likely asking for details on how the Bill of Materials is created, managed, or used in the finance and accounts department.
Possible resp...
VOM stands for Value of Money and BOM stands for Bill of Materials.
VOM refers to the concept of the time value of money, which states that a sum of money is worth more today than the same sum in the future due to its potential earning capacity.
BOM is a comprehensive list of materials, components, and assemblies required to build a product.
VOM is a financial concept used in investment analysis and decision-making, while...
Nordex India interview questions for popular designations
I applied via Approached by Company and was interviewed before Jul 2023. There were 3 interview rounds.
DFMEA stands for Design Failure Mode and Effects Analysis, a systematic approach to identifying and preventing potential failures in a product design.
DFMEA is a proactive risk management tool used during the design phase of a product to identify and prioritize potential failure modes and their effects on the system.
It involves analyzing each component or subsystem of a product to determine how it could fail, the potent...
8D Analysis is a problem-solving methodology used to identify, correct, and prevent recurring problems.
8D stands for 8 disciplines, each representing a step in the problem-solving process
It involves identifying the problem, implementing short-term containment actions, root cause analysis, corrective actions, and preventive measures
The goal is to address the immediate issue, prevent its recurrence, and improve overall p...
Root Cause Analysis is a methodical process used to identify the underlying cause of a problem or issue.
Identify the problem or issue
Gather data and evidence related to the problem
Analyze the data to determine the root cause
Develop solutions to address the root cause
Implement corrective actions to prevent recurrence
Examples: Using tools like Fishbone Diagram, 5 Whys, Fault Tree Analysis
The processes involved in manufacturing a part include design, material selection, machining, assembly, and quality control.
Design: Create detailed drawings and specifications for the part.
Material selection: Choose the appropriate material based on the part's function and requirements.
Machining: Use various techniques such as milling, turning, and drilling to shape the part.
Assembly: Put together the individual compon...
pH value is a measure of acidity or alkalinity of a solution. Organic chemistry is the study of carbon-based compounds.
pH value ranges from 0 to 14, with 7 being neutral, below 7 acidic and above 7 alkaline
Organic chemistry deals with the structure, properties, and reactions of compounds containing carbon atoms
Examples of organic compounds include carbohydrates, proteins, lipids, and nucleic acids
The question is asking for the IUPAC name of a compound, its electronic configuration, and the human temperature.
IUPAC name refers to the systematic naming of chemical compounds according to the International Union of Pure and Applied Chemistry.
Electronic configuration refers to the arrangement of electrons in an atom or molecule.
Human temperature is typically around 98.6°F or 37°C.
Example of IUPAC name: 2-methylpropan...
Indicators are substances that change color in response to changes in pH or other chemical properties.
Indicators are commonly used in chemistry to determine the endpoint of a reaction or to measure pH.
Examples of indicators include litmus paper, phenolphthalein, and bromothymol blue.
Indicators work by changing color in response to changes in the concentration of hydrogen ions in a solution.
Different indicators have dif...
Normal se chemical formula refers to the chemical formula of selenium in its most stable and common form.
The normal se chemical formula is Se
Se is a nonmetal element with atomic number 34
It is commonly found in sulfide ores and is used in various industries such as glassmaking and electronics
I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
In the last month, the business saw a significant increase in sales due to a successful marketing campaign.
Sales increased by 20% compared to the previous month
New marketing campaign led to higher customer engagement
Introduced a new product line which was well-received by customers
Managed a team of 15 members in my previous organization
Managed a team of 15 members
Delegated tasks effectively
Provided guidance and support to team members
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Interview experience
based on 126 reviews
Rating in categories
Senior Engineer
28
salaries
| ₹5.5 L/yr - ₹11.3 L/yr |
Quality Engineer
28
salaries
| ₹3.1 L/yr - ₹5.5 L/yr |
Assistant Manager
27
salaries
| ₹7.8 L/yr - ₹17 L/yr |
Team Lead
24
salaries
| ₹3 L/yr - ₹8.3 L/yr |
Assembly Operator
21
salaries
| ₹2 L/yr - ₹3.4 L/yr |
Vestas
GE Vernova
Suzlon Group
Siemens Gamesa Renewable Power Private Limited