Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Nippon Koei India Team. If you also belong to the team, you can get access from here

Nippon Koei India Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Nippon Koei India MIS Coordinator Interview Questions and Answers

Updated 16 Oct 2024

Nippon Koei India MIS Coordinator Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About yourself and explain your work experience
  • Q2. Explain your work experience in current company
  • Ans. 

    I have worked as an MIS Coordinator in my current company for 3 years, managing databases, generating reports, and providing IT support.

    • Managed databases to ensure accurate and up-to-date information

    • Generated reports for management to analyze performance and make informed decisions

    • Provided IT support to troubleshoot technical issues and improve system efficiency

  • Answered by AI

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Realted work
  • Q2. IS code amendments
  • Q3. Lab tests And relevant is codes
  • Q4. Feild tests and relevant IS codes
  • Q5. QMS - Breifing

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and go through your resume prior to interview.Fake it but atleast have technical knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduction about yourself
  • Ans. I'm answering Smoothly about my self
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions Like 1- Estimation and Costing 2- Rate Analysis 3- Planning and Praposal 4- Vendor Selection and Database 6- What do you mean by Hydrocarbon
Round 3 - Assignment 

1- Material Calculation
2- Bar bending Schedule
3- Planning and Chart
4- Making Praposal

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- Special thing is that you should speak in English and be Confident.
2- Learn that before you to interview about which post you choose etc.

Nippon Koei India Interview FAQs

How many rounds are there in Nippon Koei India MIS Coordinator interview?
Nippon Koei India interview process usually has 1 rounds. The most common rounds in the Nippon Koei India interview process are One-on-one Round.
How to prepare for Nippon Koei India MIS Coordinator interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nippon Koei India. The most common topics and skills that interviewers at Nippon Koei India expect are Finance, MIS, MIS Reporting and Provision.

Tell us how to improve this page.

Nippon Koei India MIS Coordinator Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Tata Projects Interview Questions
4.2
 • 453 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
Nippon Koei India MIS Coordinator Salary
based on 6 salaries
₹4 L/yr - ₹4.8 L/yr
47% more than the average MIS Coordinator Salary in India
View more details

Nippon Koei India MIS Coordinator Reviews and Ratings

based on 3 reviews

4.5/5

Rating in categories

4.1

Skill development

4.5

Work-life balance

4.5

Salary

4.1

Job security

4.5

Company culture

4.1

Promotions

4.1

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
103 salaries
unlock blur

₹7.5 L/yr - ₹17 L/yr

Senior Engineer
70 salaries
unlock blur

₹5.3 L/yr - ₹11.2 L/yr

Deputy Manager
42 salaries
unlock blur

₹10 L/yr - ₹18 L/yr

Assistant General Manager
21 salaries
unlock blur

₹25 L/yr - ₹47 L/yr

Manager
19 salaries
unlock blur

₹13 L/yr - ₹21 L/yr

Explore more salaries
Compare Nippon Koei India with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview