i
Nippon Audiotronix
Filter interviews by
Top trending discussions
The choice of material manufacturing depends on the product's requirements and specifications.
Consider the product's mechanical, thermal, and chemical properties
Evaluate the cost and availability of the materials
Choose a material that can be easily processed and manufactured
Examples of materials include metals, plastics, ceramics, and composites
posted on 3 Dec 2024
What is the group decisions
I was interviewed in Jan 2024.
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Count by Total Count.
Multiply Availability, Performance, and Quality to get OEE.
Example: OEE = Availability x Performance x Quality
6 Sigma is a data-driven methodology for improving processes by reducing defects and variations.
6 Sigma aims to achieve near perfection in the products or services delivered by a company.
It focuses on identifying and eliminating causes of defects and minimizing variability in manufacturing and business processes.
6 Sigma uses statistical tools and techniques to measure and analyze process performance.
The goal of 6 Sigma...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement
It involves setting up autonomous maintenance teams to take care of routine tasks
TPM also includes planned maintenance, quality maintenance, and focused improvement projects
Example: Implementing T...
CP Cpl stands for Cost Per Completed Lead, a metric used in marketing to measure the cost of generating a lead that has been successfully completed.
CP Cpl is calculated by dividing the total cost of generating leads by the number of completed leads.
It helps in determining the efficiency and effectiveness of lead generation campaigns.
For example, if a marketing campaign costs $1000 and generates 50 completed leads, the
To find valid parking spots in Bangalore, check with the local authorities and use parking apps.
Contact the Bangalore Traffic Police or the Bangalore Municipal Corporation for information on valid parking spots.
Use parking apps like Parkopedia, Get My Parking, or ParkEasy to find valid parking spots in Bangalore.
Look for signs and markings on the road that indicate valid parking spots.
Be aware of parking restrictions d
I would give the award to the student who showed consistent improvement and growth throughout all four semesters.
Look for the student who consistently improved their grades each semester
Consider factors such as attendance, participation, and attitude towards learning
Take into account any challenges the student may have faced and how they overcame them
Examples: a student who started with C's and ended with A's, a studen...
posted on 19 May 2022
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
The choice of material manufacturing depends on the product's requirements and specifications.
Consider the product's mechanical, thermal, and chemical properties
Evaluate the cost and availability of the materials
Choose a material that can be easily processed and manufactured
Examples of materials include metals, plastics, ceramics, and composites
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Customer satisfaction.quality, machining,production over all difficulty process planning..
Thanks team.
I applied via Campus Placement and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 6 May 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
based on 1 interview
Interview experience
Assistant Manager
63
salaries
| ₹5.4 L/yr - ₹12.7 L/yr |
Senior Executive
45
salaries
| ₹3.3 L/yr - ₹8 L/yr |
Executive Engineer
45
salaries
| ₹3 L/yr - ₹7.3 L/yr |
Quality Engineer
41
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Deputy Manager
29
salaries
| ₹7 L/yr - ₹18.5 L/yr |
Blaupunkt
HARMAN
Bose
Jbl