Filter interviews by
The choice of material manufacturing depends on the product's requirements and specifications.
Consider the product's mechanical, thermal, and chemical properties
Evaluate the cost and availability of the materials
Choose a material that can be easily processed and manufactured
Examples of materials include metals, plastics, ceramics, and composites
Top trending discussions
posted on 3 Dec 2024
What is the group decisions
I am interested in the company because of its innovative products and strong company culture.
Innovative products such as XYZ have caught my attention.
Positive reviews from current employees about the company culture.
Exciting projects the company is working on, like the ABC initiative.
I worked on a project to develop a mobile app for tracking fitness goals and progress.
Collaborated with a cross-functional team to define requirements and prioritize features
Conducted user research and testing to gather feedback and make improvements
Implemented gamification elements to increase user engagement
Integrated with wearable devices to track activity levels and sync data
I was interviewed in Jan 2024.
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Count by Total Count.
Multiply Availability, Performance, and Quality to get OEE.
Example: OEE = Availability x Performance x Quality
6 Sigma is a data-driven methodology for improving processes by reducing defects and variations.
6 Sigma aims to achieve near perfection in the products or services delivered by a company.
It focuses on identifying and eliminating causes of defects and minimizing variability in manufacturing and business processes.
6 Sigma uses statistical tools and techniques to measure and analyze process performance.
The goal of 6 Sigma...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement
It involves setting up autonomous maintenance teams to take care of routine tasks
TPM also includes planned maintenance, quality maintenance, and focused improvement projects
Example: Implementing T...
CP Cpl stands for Cost Per Completed Lead, a metric used in marketing to measure the cost of generating a lead that has been successfully completed.
CP Cpl is calculated by dividing the total cost of generating leads by the number of completed leads.
It helps in determining the efficiency and effectiveness of lead generation campaigns.
For example, if a marketing campaign costs $1000 and generates 50 completed leads, the
posted on 24 Aug 2023
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Process method and problem solving involves identifying issues in production processes and implementing solutions.
Identify root causes of production issues
Implement process improvements to prevent future problems
Utilize problem-solving techniques like root cause analysis and 5 Whys
Collaborate with team members to brainstorm solutions
Monitor and evaluate the effectiveness of implemented solutions
posted on 19 May 2022
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Customer satisfaction.quality, machining,production over all difficulty process planning..
Thanks team.
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
SFD and BMD are diagrams used to show the variation of shear force and bending moment along the length of a beam.
SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam.
BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam.
SFD and BMD are essential for analyzing the internal forces in a beam and designing appropriate supports and reinforcements.
Exa...
I applied via Campus Placement and was interviewed in Jul 2023. There were 2 interview rounds.
Deputy Manager
34
salaries
| ₹7 L/yr - ₹15 L/yr |
Service Engineer
34
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Design Engineer
33
salaries
| ₹4 L/yr - ₹15.6 L/yr |
Lead Engineer
29
salaries
| ₹6.8 L/yr - ₹29.8 L/yr |
Senior Manager
27
salaries
| ₹14.6 L/yr - ₹30 L/yr |
Tata Motors
Ashok Leyland
Bharat Benz
Mahindra Truck and Bus